SUSSER

Operated by SOUTHWESTERN ENERGY PROD. CO. (P-5 806668) in the SHAMROCK COVE, E. (22 SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 120308District 04Field 82638490CondensateGasSaveExport
Value, all time
$615 k
Jan 1993 – Feb 2000
Value, last 12 filed months
$158 k
at the published price for each month
Months reported
86
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 3 leases and 3 wells, and the rule below applies to all of them.

Discovered
1985-12-03
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFFECTIVE 10/01/2005.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition4,348 bbl$72,732
GasProduction852,432 Mcf$541,943
Total$614,675

624,124 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.7433, -97.1329. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.74327, -97.13288 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,409 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,409 ft.

Completions filed
Apr 2016
1 of 1 wells

1 well

42-3553237729,409 ftApr 2016Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (86)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

86 months

Feb 2000129027.622.73$3,563
Jan 200003,77525.272.48$9,364
Dec 199906,69724.282.42$16,232
Nov 199926,50523.192.43$15,879
Oct 199916,85420.982.80$19,238
Sep 199956,46821.752.62$17,047
Aug 19991866,39319.262.88$21,966
Jul 1999256,79817.892.37$16,575
Jun 1999275,53415.942.36$13,502
May 199962,39715.792.32$5,658
Apr 199984,51315.102.21$10,086
Mar 1999124,75712.471.84$8,895
Feb 199914,4879.981.82$8,166
Jan 199925,18310.381.90$9,868
Dec 1998105,2309.201.77$9,366
Nov 199825,23110.892.19$11,455
Oct 1998105,45412.421.97$10,864
Sep 199824,42412.592.08$9,239
Aug 19981675,69511.301.91$12,749
Jul 199876,08311.742.24$13,691
Jun 199836,23211.242.24$13,976
May 199836,51012.622.21$14,401
Apr 199856,35913.042.51$15,997
Mar 199846,61512.802.31$15,328
Feb 19981766,11413.952.30$16,512
Jan 199806,77814.702.15$14,605
Dec 199706,90116.322.41$16,639
Nov 199706,78218.193.09$20,945
Oct 199706,89919.253.15$21,731
Sep 199705,70817.742.95$16,866
Aug 19971557,63917.862.55$22,284
Jul 199708,29517.582.25$18,638
Jun 199708,29717.242.26$18,728
May 199708,31018.972.31$19,184
Apr 199708,21917.882.08$17,118
Mar 199706,77418.951.94$13,136
Feb 19971306,55020.492.21$17,112
Jan 199706,84823.483.54$24,240
Dec 199605,80823.32$0
Nov 19961425,57421.97$3,120
Oct 199606,00623.31$0
Sep 199608,22322.22$0
Aug 199608,17720.26$0
Jul 199608,72619.55$0
Jun 19961438,28118.73$2,678
May 199609,27519.43$0
Apr 199609,53721.51$0
Mar 1996010,25619.38$0
Feb 199615510,02516.98$2,632
Jan 199609,52917.07$0
Dec 1995010,86117.19$0
Nov 199511810,23416.00$1,888
Oct 1995010,85015.43$0
Sep 199516910,99616.18$2,734
Aug 1995011,26415.92$0
Jul 1995011,47915.24$0
Jun 199514810,70916.41$2,429
May 1995310,94117.56$53
Apr 19951839,94617.73$3,245
Mar 1995010,05916.44$0
Feb 1995410,51216.58$66
Jan 1995615,20715.92$96
Dec 199418616,32715.03$2,796
Nov 1994516,34615.90$80
Oct 199417917,34615.58$2,789
Sep 1994218,60215.29$31
Aug 199418319,95116.13$2,952
Jul 1994417,14217.56$70
Jun 199418214,09417.09$3,110
May 1994315,03315.88$48
Apr 199418314,56314.14$2,588
Mar 1994014,67112.46$0
Feb 1994010,77812.50$0
Jan 199418314,15012.66$2,317
Dec 1993214,68312.33$25
Nov 199318015,12114.49$2,608
Oct 1993016,33015.85$0
Sep 1993016,11315.03$0
Aug 199318016,50215.66$2,819
Jul 1993016,99915.46$0
Jun 199318317,17316.79$3,073
May 1993016,69717.68$0
Apr 199318117,39418.05$3,267
Mar 1993018,86718.14$0
Feb 199317917,38917.90$3,204
Jan 199318419,37816.93$3,115

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2000 — as filed, then multipliedworked
Condensate           129 bbl  × $ 27.62 =     $3,563
Gas                    0 Mcf  × $  2.73 =         $0

────────────────────────────────────────────────────
Month total                                   $3,563

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/120308 is the state's own key, not one this site invented.