GARNER, TULLY C.

Operated by EOG RESOURCES, INC. (P-5 253162) in the TOM WALSH (OLMOS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 122884District 04Field 90606600NGPA filingCondensateGasSaveExport
Value, all time
$475 k
Jan 1993 – Nov 2017
Value, last 12 filed months
$1 k
at the published price for each month
Months reported
299
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 290 leases and 291 wells, and the rule below applies to all of them.

Discovered
1970-12-15
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2001-01-09.

The Commission's schedule remark for this field reads: SUSPENSION OF THE ALLOCATION IS STILL IN EFFECT.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition109 bbl$1,803
GasProduction145,997 Mcf$473,687
Total$475,490

43,672 Mcf of this lease's gas, across 47 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.0621, -99.5386. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.06207, -99.53860 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,231 ft
1 wells filed one
Completion to plug
31.1 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,231 ft.

Completions filed
Oct 1986
1 of 1 wells
Plug dates filed
Nov 2017
1 of 1 wells

Last completion to plug: a median of 31.1 years across the 1 well that filed both dates, with the middle half between 31.1 years and 31.1 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-47934412B 17,231 ftOct 1986Nov 2017Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (299)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

299 months

Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 201703445.373.00$102
Jul 201701743.873.09$52
Jun 201703742.493.09$114
May 201703445.373.26$111
Apr 201703647.933.21$116
Mar 201703646.772.98$107
Feb 201705350.452.95$156
Jan 201706849.413.42$232
Dec 201602248.763.72$82
Nov 201604042.492.64$106
Oct 201605746.193.09$176
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160941.622.92$26
Jun 201602045.352.69$54
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 201601133.011.79$20
Feb 20160126.472.06$2
Jan 201601127.352.36$26
Dec 20150132.362.00$2
Nov 20150738.792.17$15
Oct 20150543.552.43$12
Sep 201501842.992.76$50
Aug 20150940.162.87$26
Jul 201501248.152.95$35
Jun 201501356.152.88$37
May 201502155.212.96$62
Apr 201506449.822.71$173
Mar 20150142.892.93$3
Feb 201504544.662.98$134
Jan 201502943.433.10$90
Dec 201404654.693.59$165
Nov 201405270.464.25$221
Oct 201406278.303.90$242
Sep 201409286.164.05$372
Aug 201408189.394.04$327
Jul 2014011096.564.18$460
Jun 20140098.164.74$0
May 201408794.734.73$411
Apr 201406595.944.81$313
Mar 201407595.895.06$379
Feb 201404597.406.19$279
Jan 201405090.404.86$243
Dec 201306891.824.35$296
Nov 201305788.853.74$213
Oct 201306197.423.78$231
Sep 20130118104.113.72$439
Aug 2013076104.253.52$268
Jul 2013074102.523.72$275
Jun 201306594.403.93$256
May 201307094.834.15$290
Apr 201305393.964.28$227
Mar 2013010193.623.91$395
Feb 201308391.233.42$284
Jan 201306091.603.42$205
Dec 201207586.773.42$257
Nov 20120086.953.62$0
Oct 201206089.383.40$204
Sep 2012034394.672.92$1,001
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 2010025278.103.51$884
Sep 2010033372.633.98$1,325
Aug 2010037173.684.42$1,640
Jul 2010036072.554.74$1,705
Jun 2010029670.364.91$1,453
May 2010031271.124.24$1,321
Apr 2010033381.694.12$1,373
Mar 2010030078.394.39$1,317
Feb 2010018473.585.44$1,001
Jan 2010016374.365.96$972
Dec 2009034571.445.48$1,892
Nov 2009022074.593.75$825
Oct 2009022672.544.11$929
Sep 2009017665.543.06$539
Aug 2009022067.423.22$708
Jul 2009027261.133.46$942
Jun 2009031566.163.90$1,227
May 2009034954.743.93$1,370
Apr 2009035646.773.59$1,277
Mar 2009036442.144.06$1,477
Feb 2009020332.814.63$941
Jan 2009030135.865.37$1,617
Dec 2008038337.105.98$2,289
Nov 2008033455.496.86$2,291
Oct 2008030675.246.92$2,118
Sep 20080358101.767.88$2,820
Aug 20080406114.228.48$3,444
Jul 20080395131.0811.39$4,499
Jun 20080211131.3313.03$2,750
May 20080245123.1711.57$2,836
Apr 20080274110.3110.45$2,865
Mar 20080251101.909.66$2,426
Feb 2008025392.538.77$2,219
Jan 2008029190.388.21$2,388
Dec 2007032588.337.30$2,373
Nov 2007041491.677.29$3,019
Oct 2007039682.856.92$2,741
Sep 2007042175.846.24$2,629
Aug 2007033069.066.39$2,108
Jul 2007034170.906.39$2,178
Jun 2007034262.007.55$2,582
May 2007024458.747.85$1,914
Apr 2007032159.617.81$2,505
Mar 2007046056.927.30$3,359
Feb 2007039655.108.22$3,254
Jan 2007040450.306.73$2,718
Dec 2006040556.656.92$2,802
Nov 2006037754.207.62$2,872
Oct 2006041054.906.01$2,466
Sep 2006056660.085.04$2,851
Aug 2006048068.717.34$3,523
Jul 2006046969.376.34$2,975
Jun 2006044166.286.38$2,815
May 2006053266.016.42$3,418
Apr 2006067264.397.36$4,946
Mar 2006084356.707.08$5,971
Feb 2006056557.597.75$4,379
Jan 2006078160.598.93$6,977
Dec 2005070854.9413.42$9,498
Nov 2005072754.6910.59$7,698
Oct 2005043058.3413.80$5,932
Sep 2005044861.4512.08$5,411
Aug 2005070061.519.80$6,858
Jul 2005076755.697.84$6,016
Jun 2005044952.337.38$3,314
May 2005067545.226.65$4,490
Apr 2005074449.207.36$5,476
Mar 2005094350.377.15$6,747
Feb 2005049045.226.31$3,093
Jan 2005055643.166.32$3,515
Dec 2004057239.866.75$3,862
Nov 2004058245.286.33$3,684
Oct 2004060349.706.52$3,929
Sep 2004063043.245.28$3,329
Aug 2004066842.375.55$3,708
Jul 2004062138.286.08$3,778
Jun 2004051036.106.43$3,281
May 2004057137.486.49$3,708
Apr 2004055034.475.86$3,222
Mar 2004058034.365.53$3,207
Feb 2004063532.455.51$3,499
Jan 2004061832.036.30$3,893
Dec 2003067630.266.30$4,260
Nov 2003051128.804.60$2,348
Oct 2003042128.174.76$2,004
Sep 2003070326.314.75$3,339
Aug 2003030929.765.13$1,585
Jul 2003050629.415.17$2,616
Jun 2003056928.565.98$3,404
May 2003071026.595.97$4,241
Apr 2003062226.675.41$3,363
Mar 2003064631.146.10$3,938
Feb 2003056033.487.93$4,438
Jan 2003067430.315.58$3,762
Dec 2002066026.914.85$3,203
Nov 2002064824.664.14$2,681
Oct 2002061526.464.23$2,601
Sep 2002059127.443.64$2,148
Aug 2002060125.963.16$1,902
Jul 2002065424.583.06$2,002
Jun 2002066523.733.34$2,220
May 2002076624.663.58$2,745
Apr 2002074423.653.51$2,613
Mar 2002077222.003.10$2,395
Feb 2002077418.222.38$1,839
Jan 2002067617.172.38$1,606
Dec 2001067316.932.36$1,591
Nov 2001072818.072.41$1,751
Oct 2001081619.782.53$2,064
Sep 2001088924.262.25$2,001
Aug 2001072124.873.05$2,201
Jul 2001077923.933.20$2,491
Jun 2001076224.563.82$2,914
May 2001066525.524.31$2,864
Apr 2001063824.685.34$3,404
Mar 2001049424.545.38$2,656
Feb 2001068427.755.77$3,945
Jan 2001068827.478.40$5,778
Dec 2000084026.889.12$7,663
Nov 2000074932.215.66$4,238
Oct 2000098331.235.15$5,058
Sep 2000086231.875.19$4,471
Aug 2000077029.644.54$3,496
Jul 2000079828.534.09$3,264
Jun 2000068729.304.40$3,021
May 2000076627.263.68$2,819
Apr 2000070324.513.12$2,191
Mar 2000072028.422.86$2,059
Feb 2000067827.622.73$1,849
Jan 2000068825.272.48$1,707
Dec 1999067324.282.42$1,631
Nov 1999063623.192.43$1,548
Oct 1999066320.982.80$1,859
Sep 1999063721.752.62$1,668
Aug 1999066919.262.88$1,924
Jul 1999072317.892.37$1,715
Jun 1999072915.942.36$1,722
May 1999082515.792.32$1,915
Apr 1999076115.102.21$1,680
Mar 1999084612.471.84$1,555
Feb 199908149.981.82$1,480
Jan 199901,01010.381.90$1,919
Dec 199808749.201.77$1,550
Nov 1998080310.892.19$1,755
Oct 1998078412.421.97$1,544
Sep 1998079312.592.08$1,652
Aug 1998080111.301.91$1,528
Jul 1998089311.742.24$1,998
Jun 1998085111.242.24$1,904
May 1998087812.622.21$1,937
Apr 1998088713.042.51$2,222
Mar 1998098812.802.31$2,282
Feb 1998082913.952.30$1,906
Jan 1998093514.702.15$2,015
Dec 1997097916.322.41$2,360
Nov 1997096118.193.09$2,968
Oct 199701,01219.253.15$3,188
Sep 1997093717.742.95$2,769
Aug 1997093617.862.55$2,391
Jul 199701,04617.582.25$2,350
Jun 199701,24317.242.26$2,806
May 199701,30518.972.31$3,013
Apr 199701,43317.882.08$2,985
Mar 1997068018.951.94$1,319
Feb 1997051520.492.21$1,136
Jan 1997061223.483.54$2,166
Dec 1996057123.32$0
Nov 1996070521.97$0
Oct 1996082923.31$0
Sep 1996099322.22$0
Aug 199601,00620.26$0
Jul 199601,10919.55$0
Jun 199601,11718.73$0
May 199601,11519.43$0
Apr 1996096421.51$0
Mar 199601,18719.38$0
Feb 1996093116.98$0
Jan 199601,00817.07$0
Dec 199521,70317.19$34
Nov 1995131,11216.00$208
Oct 19952015.43$31
Sep 1995777516.18$113
Aug 1995560415.92$80
Jul 1995577115.24$76
Jun 1995482616.41$66
May 19951087317.56$176
Apr 1995231,30717.73$408
Mar 1995867416.44$132
Feb 1995747916.58$116
Jan 1995985915.92$143
Dec 1994386515.03$45
Nov 1994399615.90$48
Oct 199431,01215.58$47
Sep 1994137615.29$15
Aug 1994392516.13$48
Jul 199411,28817.56$18
Jun 1994094617.09$0
May 1994097215.88$0
Apr 199401,02614.14$0
Mar 199401,12912.46$0
Feb 199401,01812.50$0
Jan 1994098112.66$0
Dec 1993091212.33$0
Nov 1993083114.49$0
Oct 1993076215.85$0
Sep 1993081215.03$0
Aug 1993099215.66$0
Jul 1993091515.46$0
Jun 199301,01516.79$0
May 1993081717.68$0
Apr 1993091718.05$0
Mar 1993079118.14$0
Feb 1993086317.90$0
Jan 1993099316.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2017 — as filed, then multipliedworked
Condensate             0 bbl  × $ 45.37 =         $0
Gas                   34 Mcf  × $  3.00 =       $102

────────────────────────────────────────────────────
Month total                                     $102

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/122884 is the state's own key, not one this site invented.