CANALES, P.

Operated by TRIAD ENERGY CORPORATION (P-5 868630) in the SEELIGSON (CONSOLIDATED) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 129604District 04Field 82126006CondensateGasSaveExport
Value, all time
$151 k
Jan 1993 – Oct 2005
Value, last 12 filed months
$9 k
at the published price for each month
Months reported
154
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 91 leases and 123 wells, and the rule below applies to all of them.

Discovered
1994-06-13
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-08-21.

The Commission's schedule remark for this field reads: FORMULA TO REMAIN SUSPENDED.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition135 bbl$2,050
GasProduction166,258 Mcf$148,748
Total$150,798

120,080 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.3868, -98.0739. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.38683, -98.07393 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,614 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,614 ft.

Completions filed
Oct 2005
1 of 1 wells

1 well

42-249320241408,614 ftOct 2005Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (154)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

154 months

Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 200507561.519.80$735
Jul 2005011155.697.84$871
Jun 2005010352.337.38$760
May 2005012445.226.65$825
Apr 2005015949.207.36$1,170
Mar 2005012750.377.15$909
Feb 2005021845.226.31$1,376
Jan 2005015243.166.32$961
Dec 200409539.866.75$641
Nov 2004015045.286.33$950
Oct 2004015649.706.52$1,016
Sep 2004013543.245.28$713
Aug 2004013842.375.55$766
Jul 2004013738.286.08$834
Jun 2004028336.106.43$1,821
May 2004025837.486.49$1,676
Apr 2004021434.475.86$1,254
Mar 2004021934.365.53$1,211
Feb 2004020032.455.51$1,102
Jan 2004022132.036.30$1,392
Dec 2003019930.266.30$1,254
Nov 2003022628.804.60$1,039
Oct 2003024028.174.76$1,142
Sep 2003032926.314.75$1,563
Aug 2003033229.765.13$1,703
Jul 2003032129.415.17$1,660
Jun 2003026628.565.98$1,591
May 2003043426.595.97$2,592
Apr 2003035526.675.41$1,920
Mar 2003038331.146.10$2,335
Feb 2003031233.487.93$2,473
Jan 2003035230.315.58$1,965
Dec 2002024926.914.85$1,209
Nov 2002020124.664.14$832
Oct 2002032126.464.23$1,358
Sep 2002029527.443.64$1,072
Aug 2002040825.963.16$1,291
Jul 2002025924.583.06$793
Jun 2002027223.733.34$908
May 2002039924.663.58$1,430
Apr 2002033923.653.51$1,191
Mar 2002031022.003.10$962
Feb 2002030918.222.38$734
Jan 2002032017.172.38$760
Dec 2001037116.932.36$877
Nov 2001029818.072.41$717
Oct 20010019.782.53$0
Sep 2001030424.262.25$684
Aug 2001029824.873.05$910
Jul 2001029323.933.20$937
Jun 2001027024.563.82$1,033
May 2001034725.524.31$1,495
Apr 2001032524.685.34$1,734
Mar 2001028724.545.38$1,543
Feb 2001030227.755.77$1,742
Jan 2001020327.478.40$1,705
Dec 2000020726.889.12$1,888
Nov 2000014232.215.66$803
Oct 2000017131.235.15$880
Sep 200008931.875.19$462
Aug 200006229.644.54$282
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 2000031327.263.68$1,152
Apr 2000032324.513.12$1,006
Mar 2000013628.422.86$389
Feb 2000013527.622.73$368
Jan 2000037925.272.48$940
Dec 1999030024.282.42$727
Nov 1999012423.192.43$302
Oct 199907920.982.80$221
Sep 199906821.752.62$178
Aug 1999031919.262.88$917
Jul 1999053617.892.37$1,272
Jun 1999032915.942.36$777
May 199901,12915.792.32$2,620
Apr 1999030915.102.21$682
Mar 1999051912.471.84$954
Feb 199903999.981.82$725
Jan 1999028810.381.90$547
Dec 199808369.201.77$1,483
Nov 1998083210.892.19$1,819
Oct 1998083612.421.97$1,646
Sep 1998080512.592.08$1,677
Aug 1998076011.301.91$1,450
Jul 1998074911.742.24$1,676
Jun 1998076811.242.24$1,718
May 1998085912.622.21$1,895
Apr 1998087413.042.51$2,190
Mar 1998088512.802.31$2,044
Feb 1998081313.952.30$1,869
Jan 1998095014.702.15$2,047
Dec 199701,15616.322.41$2,787
Nov 199701,06318.193.09$3,283
Oct 199701,57519.253.15$4,961
Sep 1997086517.742.95$2,556
Aug 199701,29417.862.55$3,306
Jul 199701,27017.582.25$2,854
Jun 199701,29717.242.26$2,928
May 199701,38118.972.31$3,188
Apr 199711,39417.882.08$2,921
Mar 199731,46418.951.94$2,896
Feb 199701,15420.492.21$2,546
Jan 199701,93823.483.54$6,860
Dec 199602,02523.32$0
Nov 199602,05121.97$0
Oct 199602,13123.31$0
Sep 199602,05922.22$0
Aug 199602,24420.26$0
Jul 199602,29719.55$0
Jun 199602,28418.73$0
May 199602,33919.43$0
Apr 199602,21721.51$0
Mar 199602,25419.38$0
Feb 199602,27916.98$0
Jan 199602,45717.07$0
Dec 199502,54317.19$0
Nov 199502,58616.00$0
Oct 199502,67615.43$0
Sep 199502,54616.18$0
Aug 199502,72315.92$0
Jul 199502,53315.24$0
Jun 199501,95816.41$0
May 199501,83517.56$0
Apr 199502,11017.73$0
Mar 199502,11816.44$0
Feb 199501,98516.58$0
Jan 199502,15215.92$0
Dec 199402,18415.03$0
Nov 199402,12515.90$0
Oct 199402,11015.58$0
Sep 199422,04615.29$31
Aug 199402,09416.13$0
Jul 199411,94417.56$18
Jun 199442,15117.09$68
May 199442,31415.88$64
Apr 199462,43214.14$85
Mar 1994102,46012.46$125
Feb 199452,44812.50$63
Jan 199483,11912.66$101
Dec 1993242,88712.33$296
Nov 199343,08414.49$58
Oct 199353,21015.85$79
Sep 199343,12515.03$60
Aug 199353,23615.66$78
Jul 199353,36915.46$77
Jun 199353,34416.79$84
May 199363,23917.68$106
Apr 199373,30718.05$126
Mar 199383,09418.14$145
Feb 199373,14817.90$125
Jan 1993113,20816.93$186

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2005 — as filed, then multipliedworked
Condensate             0 bbl  × $ 61.51 =         $0
Gas                   75 Mcf  × $  9.80 =       $735

────────────────────────────────────────────────────
Month total                                     $735

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/129604 is the state's own key, not one this site invented.