K&H FEE "2042"

Operated by KILLAM OIL CO., LTD. (P-5 460054) in the VILLEGAS (MIDDLE WILCOX 7950) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 130100District 04Field 93845600CondensateGasSaveExport
Value, all time
$223 k
Jan 1993 – Apr 2000
Value, last 12 filed months
$266
at the published price for each month
Months reported
88
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 50 leases and 50 wells, and the rule below applies to all of them.

Discovered
1983-03-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1984-06-04.

The Commission's schedule remark for this field reads: ALLOC. FORM. SUSP. ADMIN. EFF 8-1-93.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,706 bbl$29,435
GasProduction545,680 Mcf$193,267
Total$222,702

470,147 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.5099, -99.1008. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.50993, -99.10076 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
11,500 ft
1 wells filed one
Completion to plug
11.2 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,500 ft.

Completions filed
Feb 1989
1 of 1 wells
Plug dates filed
Apr 2000
1 of 1 wells

Last completion to plug: a median of 11.2 years across the 1 well that filed both dates, with the middle half between 11.2 years and 11.2 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-47934783211,500 ftFeb 1989Apr 2000Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (88)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

88 months

Apr 20000024.513.12$0
Mar 200005928.422.86$169
Feb 200002827.622.73$76
Jan 20000025.272.48$0
Dec 19990524.282.42$12
Nov 19990023.192.43$0
Oct 19990320.982.80$8
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 1999219715.102.21$465
Mar 1999337012.471.84$718
Feb 19990379.981.82$67
Jan 199904610.381.90$87
Dec 19980679.201.77$119
Nov 199801710.892.19$37
Oct 199805312.421.97$104
Sep 199807812.592.08$162
Aug 199803811.301.91$72
Jul 19980011.742.24$0
Jun 19980011.242.24$0
May 199803212.622.21$71
Apr 199801713.042.51$43
Mar 19980012.802.31$0
Feb 19980013.952.30$0
Jan 19981014.702.15$15
Dec 1997594316.322.41$2,355
Nov 1997194,96218.193.09$15,670
Oct 1997246,42719.253.15$20,706
Sep 1997236,93917.742.95$20,912
Aug 1997257,36217.862.55$19,255
Jul 1997226,56117.582.25$15,129
Jun 1997226,06417.242.26$14,067
May 1997327,36218.972.31$17,602
Apr 1997327,02617.882.08$15,206
Mar 1997276,46418.951.94$13,046
Feb 1997277,13020.492.21$16,281
Jan 1997407,24623.483.54$26,588
Dec 1996356,68023.32$816
Nov 1996216,00821.97$461
Oct 1996207,52623.31$466
Sep 1996236,60722.22$511
Aug 1996227,88820.26$446
Jul 1996208,75719.55$391
Jun 1996298,02418.73$543
May 1996258,39219.43$486
Apr 1996218,14421.51$452
Mar 1996288,49019.38$543
Feb 1996217,93116.98$357
Jan 1996228,12917.07$376
Dec 1995287,04917.19$481
Nov 1995228,11516.00$352
Oct 1995269,39415.43$401
Sep 1995269,00716.18$421
Aug 1995269,43515.92$414
Jul 1995249,01315.24$366
Jun 1995309,61716.41$492
May 1995279,75717.56$474
Apr 1995288,70717.73$496
Mar 19952210,22416.44$362
Feb 1995168,65016.58$265
Jan 19952510,85415.92$398
Dec 19941910,52615.03$286
Nov 19942211,78015.90$350
Oct 19942412,20215.58$374
Sep 19942311,70715.29$352
Aug 19942213,10416.13$355
Jul 19942413,06917.56$421
Jun 19942112,58517.09$359
May 19943513,86415.88$556
Apr 19942813,82514.14$396
Mar 19943313,70312.46$411
Feb 19943311,61212.50$413
Jan 19943513,67612.66$443
Dec 19934212,85112.33$518
Nov 19933310,42914.49$478
Oct 1993259,77115.85$396
Sep 1993349,34415.03$511
Aug 1993339,33015.66$517
Jul 1993329,77215.46$495
Jun 1993349,80816.79$571
May 19934510,29917.68$796
Apr 1993459,73518.05$812
Mar 1993789,56918.14$1,415
Feb 1993606,85117.90$1,074
Jan 1993358,33716.93$593

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2000 — as filed, then multipliedworked
Condensate             0 bbl  × $ 28.42 =         $0
Gas                   59 Mcf  × $  2.86 =       $169

────────────────────────────────────────────────────
Month total                                     $169

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/130100 is the state's own key, not one this site invented.