KING RANCH STRATTON

Operated by EOG RESOURCES, INC. (P-5 253162) in the STRATTON (CONSOLIDATED) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 130707District 04Field 86508170NGPA filingCondensateGasSaveExport
Value, all time
$4.7 M
Jan 1993 – Jul 2016
Value, last 12 filed months
$0
at the published price for each month
Months reported
283
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 856 leases and 917 wells, and the rule below applies to all of them.

Discovered
1990-07-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2000-01-11.

The Commission's schedule remark for this field reads: WITH A DIAG. OF 1500 FEET.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3 bbl$311
GasProduction1,769,684 Mcf$4,733,759
Total$4,734,069

565,407 Mcf of this lease's gas, across 45 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.5776, -97.9337. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.57761, -97.93368 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,280 ft
1 wells filed one
Completion to plug
9.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,280 ft.

Completions filed
Sep 2006
1 of 1 wells
Plug dates filed
Jul 2016
1 of 1 wells

Last completion to plug: a median of 9.8 years across the 1 well that filed both dates, with the middle half between 9.8 years and 9.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-27331949P2747,280 ftSep 2006Jul 2016Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (283)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

283 months

Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 2013135104.113.72$234
Aug 20131162104.253.52$675
Jul 20131327102.523.72$1,318
Jun 2013013594.403.93$531
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 2012014692.662.91$425
Jul 2012039185.133.02$1,181
Jun 2012039879.822.52$1,003
May 2012033991.612.49$844
Apr 20120298101.652.00$595
Mar 20120326105.052.22$724
Feb 20120299101.102.57$769
Jan 2012038498.092.73$1,050
Dec 2011034196.873.24$1,105
Nov 2011046195.723.31$1,527
Oct 2011038684.983.65$1,408
Sep 2011040983.623.99$1,630
Aug 2011038083.404.15$1,577
Jul 2011037194.144.52$1,676
Jun 2011047892.904.64$2,218
May 2011034498.134.40$1,515
Apr 20110289105.964.33$1,252
Mar 2011032396.364.06$1,311
Feb 2011040885.644.18$1,705
Jan 2011051786.504.59$2,372
Dec 2010057785.734.35$2,509
Nov 2010040180.843.80$1,522
Oct 2010056678.103.51$1,986
Sep 2010055672.633.98$2,213
Aug 2010057773.684.42$2,550
Jul 2010065772.554.74$3,112
Jun 2010065370.364.91$3,206
May 2010066571.124.24$2,816
Apr 2010076081.694.12$3,133
Mar 2010088178.394.39$3,866
Feb 2010073773.585.44$4,011
Jan 2010071674.365.96$4,270
Dec 2009052271.445.48$2,863
Nov 2009072574.593.75$2,720
Oct 2009074472.544.11$3,058
Sep 200901,00265.543.06$3,071
Aug 2009087667.423.22$2,819
Jul 200901,15861.133.46$4,012
Jun 200901,80266.163.90$7,019
May 200902,75054.743.93$10,796
Apr 200902,61846.773.59$9,392
Mar 200902,30442.144.06$9,352
Feb 200902,04832.814.63$9,488
Jan 200901,78535.865.37$9,587
Dec 200802,13237.105.98$12,743
Nov 200801,04755.496.86$7,183
Oct 2008065475.246.92$4,527
Sep 20080644101.767.88$5,073
Aug 20080756114.228.48$6,413
Jul 20080860131.0811.39$9,795
Jun 20080760131.3313.03$9,905
May 20080935123.1711.57$10,822
Apr 20080725110.3110.45$7,580
Mar 20080884101.909.66$8,543
Feb 2008070792.538.77$6,201
Jan 2008082990.388.21$6,803
Dec 2007084788.337.30$6,185
Nov 2007078191.677.29$5,695
Oct 200701,20382.856.92$8,327
Sep 200701,99675.846.24$12,463
Aug 200701,61169.066.39$10,291
Jul 200701,16170.906.39$7,416
Jun 2007084762.007.55$6,394
May 2007062158.747.85$4,873
Apr 2007081359.617.81$6,346
Mar 2007087456.927.30$6,382
Feb 2007076255.108.22$6,261
Jan 2007097150.306.73$6,532
Dec 200601,27156.656.92$8,793
Nov 200601,52954.207.62$11,647
Oct 200603,05554.906.01$18,372
Sep 200601,98960.085.04$10,019
Aug 2006059468.717.34$4,360
Jul 200601,59069.376.34$10,085
Jun 200601,38166.286.38$8,816
May 200601,30266.016.42$8,365
Apr 200601,28764.397.36$9,473
Mar 200602,03356.707.08$14,400
Feb 200602,94057.597.75$22,788
Jan 200602,74860.598.93$24,549
Dec 200502,26154.9413.42$30,332
Nov 200504,81954.6910.59$51,026
Oct 2005011,57458.3413.80$159,672
Sep 2005010,10161.4512.08$122,010
Aug 2005014,09161.519.80$138,047
Jul 2005015,13055.697.84$118,674
Jun 2005014,94752.337.38$110,324
May 2005015,05345.226.65$100,120
Apr 2005012,18149.207.36$89,658
Mar 20050050.377.15$0
Feb 2005089145.226.31$5,624
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 2003049129.765.13$2,519
Jul 200304,36229.415.17$22,555
Jun 200306,86428.565.98$41,067
May 200309,59626.595.97$57,314
Apr 200306,78826.675.41$36,705
Mar 200306,53731.146.10$39,850
Feb 200305,84533.487.93$46,327
Jan 2003012,04130.315.58$67,213
Dec 2002011,71026.914.85$56,838
Nov 2002012,70324.664.14$52,552
Oct 2002013,12826.464.23$55,520
Sep 2002011,50527.443.64$41,823
Aug 2002010,87125.963.16$34,398
Jul 200208,95924.583.06$27,430
Jun 200207,60723.733.34$25,394
May 200207,61524.663.58$27,292
Apr 2002011,18923.653.51$39,299
Mar 200209,29222.003.10$28,830
Feb 200209,87418.222.38$23,457
Jan 2002011,28017.172.38$26,798
Dec 2001012,30116.932.36$29,084
Nov 2001011,14718.072.41$26,814
Oct 2001013,62519.782.53$34,456
Sep 2001013,82924.262.25$31,134
Aug 200105,53124.873.05$16,887
Jul 200109,30623.933.20$29,752
Jun 200109,72024.563.82$37,171
May 2001013,95925.524.31$60,126
Apr 2001012,90624.685.34$68,858
Mar 200107,56524.545.38$40,673
Feb 2001013,38827.755.77$77,210
Jan 2001012,39127.478.40$104,069
Dec 2000011,46426.889.12$104,580
Nov 2000012,62732.215.66$71,444
Oct 2000012,51731.235.15$64,406
Sep 2000012,56231.875.19$65,153
Aug 2000013,28829.644.54$60,337
Jul 2000013,60728.534.09$55,649
Jun 2000015,12329.304.40$66,500
May 2000016,51527.263.68$60,771
Apr 2000015,36124.513.12$47,865
Mar 2000012,07928.422.86$34,543
Feb 2000014,66027.622.73$39,970
Jan 2000016,05825.272.48$39,832
Dec 1999018,68124.282.42$45,278
Nov 1999014,77223.192.43$35,955
Oct 1999016,52320.982.80$46,326
Sep 1999017,29621.752.62$45,296
Aug 1999016,30119.262.88$46,875
Jul 1999017,45317.892.37$41,405
Jun 1999014,86815.942.36$35,120
May 1999036315.792.32$843
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 1999010,6649.981.82$19,385
Jan 1999014,55610.381.90$27,656
Dec 1998013,9489.201.77$24,734
Nov 1998013,52210.892.19$29,555
Oct 1998014,36112.421.97$28,280
Sep 1998012,56412.592.08$26,166
Aug 1998014,20811.301.91$27,100
Jul 1998010,05511.742.24$22,496
Jun 1998011,14311.242.24$24,930
May 1998013,78912.622.21$30,423
Apr 1998013,81813.042.51$34,619
Mar 1998014,84112.802.31$34,274
Feb 1998014,27313.952.30$32,815
Jan 1998015,75514.702.15$33,949
Dec 1997018,56016.322.41$44,750
Nov 1997020,51418.193.09$63,353
Oct 1997021,57419.253.15$67,954
Sep 1997022,66117.742.95$66,961
Aug 1997021,20717.862.55$54,178
Jul 1997018,52617.582.25$41,627
Jun 1997016,61717.242.26$37,508
May 1997020,61618.972.31$47,592
Apr 1997017,89617.882.08$37,273
Mar 1997021,09218.951.94$40,900
Feb 1997019,44720.492.21$42,898
Jan 1997021,81323.483.54$77,211
Dec 1996024,73223.32$0
Nov 1996010,25721.97$0
Oct 199609,74823.31$0
Sep 1996021,96922.22$0
Aug 1996026,23620.26$0
Jul 1996017,65219.55$0
Jun 1996026,12818.73$0
May 199607,94319.43$0
Apr 1996089621.51$0
Mar 199601,00019.38$0
Feb 1996087916.98$0
Jan 199601,00917.07$0
Dec 199501,78417.19$0
Nov 199502,20016.00$0
Oct 199502,65415.43$0
Sep 199502,96116.18$0
Aug 1995048215.92$0
Jul 19950015.24$0
Jun 19950016.41$0
May 19950017.56$0
Apr 1995036217.73$0
Mar 1995075316.44$0
Feb 1995043816.58$0
Jan 1995056715.92$0
Dec 199401,21715.03$0
Nov 199409,38515.90$0
Oct 1994016,25615.58$0
Sep 1994017,23015.29$0
Aug 1994017,60816.13$0
Jul 1994056917.56$0
Jun 1994012,16317.09$0
May 1994012,09815.88$0
Apr 1994012,81214.14$0
Mar 1994015,94712.46$0
Feb 1994014,67212.50$0
Jan 1994017,31712.66$0
Dec 1993018,78712.33$0
Nov 1993018,03214.49$0
Oct 1993020,66815.85$0
Sep 1993022,12815.03$0
Aug 1993021,55215.66$0
Jul 1993021,51515.46$0
Jun 1993021,99416.79$0
May 1993023,42417.68$0
Apr 1993022,73318.05$0
Mar 1993020,88218.14$0
Feb 1993021,28417.90$0
Jan 1993024,48416.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2013 — as filed, then multipliedworked
Condensate             1 bbl  × $104.11 =       $104
Gas                   35 Mcf  × $  3.72 =       $130

────────────────────────────────────────────────────
Month total                                     $234

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/130707 is the state's own key, not one this site invented.