S.A.J.S.L.B. -A-

Operated by APACHE CORPORATION (P-5 27200) in the STRATTON (CONSOLIDATED) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 133515District 04Field 86508170NGPA filingGasSaveExport
Value, all time
$2.5 M
Jan 1993 – Mar 2006
Value, last 12 filed months
$457 k
at the published price for each month
Months reported
159
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 856 leases and 917 wells, and the rule below applies to all of them.

Discovered
1990-07-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2000-01-11.

The Commission's schedule remark for this field reads: WITH A DIAG. OF 1500 FEET.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction1,042,224 Mcf$2,533,302
Total$2,533,302

432,654 Mcf of this lease's gas, across 47 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.6998, -97.9325. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.69982, -97.93251 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,498 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,498 ft.

Completions filed
Jan 2005
1 of 1 wells

1 well

42-355327655 D7,498 ftJan 2005Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (159)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

159 months

Mar 2006056.707.08$0
Feb 2006057.597.75$0
Jan 20064,47260.598.93$39,950
Dec 20054,34854.9413.42$58,330
Nov 20054,62654.6910.59$48,982
Oct 20054,72058.3413.80$65,116
Sep 20054,64461.4512.08$56,095
Aug 20054,70261.519.80$46,065
Jul 20054,79655.697.84$37,618
Jun 20054,90352.337.38$36,189
May 20054,76845.226.65$31,713
Apr 20054,97949.207.36$36,648
Mar 20054,29350.377.15$30,716
Feb 20054,65745.226.31$29,395
Jan 20055,36443.166.32$33,912
Dec 20045,28539.866.75$35,679
Nov 20045,42545.286.33$34,343
Oct 20044,20549.706.52$27,396
Sep 20046,17343.245.28$32,618
Aug 2004042.375.55$0
Jul 20043,01938.286.08$18,368
Jun 20044,50536.106.43$28,981
May 20044,65837.486.49$30,252
Apr 20044,49934.475.86$26,357
Mar 20044,74734.365.53$26,252
Feb 20044,34832.455.51$23,956
Jan 20044,66132.036.30$29,363
Dec 20034,90530.266.30$30,910
Nov 20034,74028.804.60$21,781
Oct 20034,91028.174.76$23,370
Sep 20034,74526.314.75$22,536
Aug 20035,04129.765.13$25,859
Jul 20035,08029.415.17$26,268
Jun 20034,64228.565.98$27,773
May 20034,98326.595.97$29,762
Apr 20034,80626.675.41$25,987
Mar 20035,19831.146.10$31,687
Feb 20034,57633.487.93$36,269
Jan 20035,08130.315.58$28,362
Dec 20024,96326.914.85$24,089
Nov 20024,05924.664.14$16,792
Oct 20024,65326.464.23$19,678
Sep 20024,83027.443.64$17,558
Aug 20025,35525.963.16$16,944
Jul 20025,39424.583.06$16,515
Jun 20025,29023.733.34$17,659
May 20025,51624.663.58$19,769
Apr 20025,38623.653.51$18,917
Mar 20025,29322.003.10$16,423
Feb 20025,08018.222.38$12,068
Jan 20025,74717.172.38$13,653
Dec 20015,76116.932.36$13,621
Nov 20015,17918.072.41$12,458
Oct 20015,83219.782.53$14,748
Sep 20015,68624.262.25$12,801
Aug 20015,91024.873.05$18,044
Jul 20015,95523.933.20$19,039
Jun 20015,79724.563.82$22,169
May 20016,09225.524.31$26,240
Apr 20015,95524.685.34$31,772
Mar 20016,22324.545.38$33,458
Feb 20015,73327.755.77$33,063
Jan 20015,77027.478.40$48,461
Dec 20005,01826.889.12$45,777
Nov 20005,64432.215.66$31,934
Oct 20005,44531.235.15$28,017
Sep 2000031.875.19$0
Aug 20006,03829.644.54$27,417
Jul 20005,55428.534.09$22,714
Jun 20005,64029.304.40$24,800
May 20005,36627.263.68$19,746
Apr 20005,27224.513.12$16,428
Mar 20005,59928.422.86$16,012
Feb 20005,79727.622.73$15,806
Jan 20006,26325.272.48$15,535
Dec 19996,63424.282.42$16,079
Nov 19995,91423.192.43$14,395
Oct 19996,05720.982.80$16,982
Sep 19996,19721.752.62$16,229
Aug 19995,78419.262.88$16,632
Jul 19995,43017.892.37$12,882
Jun 19994,73715.942.36$11,189
May 19995,71915.792.32$13,274
Apr 19994,75315.102.21$10,495
Mar 19996,05312.471.84$11,127
Feb 19995,5659.981.82$10,116
Jan 19996,61610.381.90$12,570
Dec 19986,4179.201.77$11,379
Nov 19986,65810.892.19$14,553
Oct 19987,00312.421.97$13,790
Sep 19986,84512.592.08$14,256
Aug 19987,06811.301.91$13,481
Jul 19987,19411.742.24$16,095
Jun 19987,00811.242.24$15,679
May 19987,10712.622.21$15,680
Apr 19987,13513.042.51$17,876
Mar 19987,32612.802.31$16,919
Feb 19986,76313.952.30$15,549
Jan 19987,53914.702.15$16,245
Dec 19977,64016.322.41$18,421
Nov 19977,53518.193.09$23,270
Oct 19978,20419.253.15$25,841
Sep 19977,12217.742.95$21,045
Aug 19976,61817.862.55$16,907
Jul 19977,38117.582.25$16,585
Jun 19977,35517.242.26$16,602
May 19977,66918.972.31$17,704
Apr 19977,95617.882.08$16,571
Mar 19978,19118.951.94$15,884
Feb 19977,36920.492.21$16,255
Jan 19978,40923.483.54$29,765
Dec 19968,49223.32$0
Nov 19968,24021.97$0
Oct 19969,18523.31$0
Sep 19968,99822.22$0
Aug 19969,38020.26$0
Jul 19969,45919.55$0
Jun 19969,22418.73$0
May 19969,63419.43$0
Apr 19969,03221.51$0
Mar 19967,87719.38$0
Feb 19966,47616.98$0
Jan 19964,45617.07$0
Dec 19952,19917.19$0
Nov 19958,73416.00$0
Oct 199510,75915.43$0
Sep 199510,85416.18$0
Aug 199511,82615.92$0
Jul 19958,52515.24$0
Jun 19957,23416.41$0
May 19957,74417.56$0
Apr 19957,79217.73$0
Mar 19957,97716.44$0
Feb 19957,87016.58$0
Jan 19958,86015.92$0
Dec 19948,07415.03$0
Nov 19949,27115.90$0
Oct 199411,56315.58$0
Sep 199410,31815.29$0
Aug 199410,57116.13$0
Jul 199411,39017.56$0
Jun 199411,17917.09$0
May 199411,51315.88$0
Apr 199411,33414.14$0
Mar 199411,81112.46$0
Feb 19949,72012.50$0
Jan 19943,74312.66$0
Dec 199310,18812.33$0
Nov 19934,02614.49$0
Oct 19934,17815.85$0
Sep 19938,69115.03$0
Aug 1993015.66$0
Jul 199311,99215.46$0
Jun 199312,12816.79$0
May 199311,84617.68$0
Apr 199311,61218.05$0
Mar 199313,46418.14$0
Feb 199311,44317.90$0
Jan 199311,77216.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2006 — as filed, then multipliedworked
Gas                4,472 Mcf  × $  8.93 =    $39,950

────────────────────────────────────────────────────
Month total                                  $39,950

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well