ADAMS GAS UNIT "D"

Operated by HUGHES, DAN A. COMPANY, L.P. (P-5 411736) in the EL MESQUITE (5200) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 141114District 04Field 28054730CondensateGasSaveExport
Value, all time
$139 k
Jan 1993 – Jun 2007
Value, last 12 filed months
$0
at the published price for each month
Months reported
174
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 49 leases and 96 wells, and the rule below applies to all of them.

Discovered
1988-04-05
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1989-08-01.

The Commission's schedule remark for this field reads: A 320 AC. WELL

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,975 bbl$35,456
GasProduction145,659 Mcf$103,394
Total$138,851

102,597 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.2867, -98.7997. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.28671, -98.79974 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,240 ft
1 wells filed one
Completion to plug
15.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,240 ft.

Completions filed
Mar 1992
1 of 1 wells
Plug dates filed
Jun 2007
1 of 1 wells

Last completion to plug: a median of 15.3 years across the 1 well that filed both dates, with the middle half between 15.3 years and 15.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4793540245,240 ftMar 1992Jun 2007Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (174)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

174 months

Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 200101324.685.34$69
Mar 20010024.545.38$0
Feb 200101227.755.77$69
Jan 200111027.478.40$111
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20001031.875.19$32
Aug 20000029.644.54$0
Jul 200015028.534.09$428
Jun 20000029.304.40$0
May 20004271127.263.68$3,761
Apr 20004380524.513.12$3,562
Mar 20004485128.422.86$3,684
Feb 2000079727.622.73$2,173
Jan 20003387925.272.48$3,014
Dec 19993483724.282.42$2,854
Nov 19991983123.192.43$2,463
Oct 19991981420.982.80$2,681
Sep 19991986021.752.62$2,665
Aug 19991994619.262.88$3,086
Jul 19993994217.892.37$2,932
Jun 19992097615.942.36$2,624
May 1999211,05815.792.32$2,787
Apr 1999191,02615.102.21$2,552
Mar 1999201,08512.471.84$2,244
Feb 1999399649.981.82$2,142
Jan 1999181,10410.381.90$2,284
Dec 1998151,3859.201.77$2,594
Nov 1998291,07710.892.19$2,670
Oct 1998141,05612.421.97$2,253
Sep 1998151,05412.592.08$2,384
Aug 1998141,09911.301.91$2,254
Jul 1998281,13511.742.24$2,868
Jun 1998151,08711.242.24$2,601
May 1998311,03312.622.21$2,670
Apr 19981798513.042.51$2,689
Mar 1998171,06512.802.31$2,677
Feb 19983499413.952.30$2,760
Jan 1998331,16114.702.15$2,987
Dec 1997171,11516.322.41$2,966
Nov 1997351,04918.193.09$3,876
Oct 1997181,15919.253.15$3,997
Sep 1997361,08917.742.95$3,857
Aug 1997341,18917.862.55$3,645
Jul 1997181,23317.582.25$3,087
Jun 1997421,07317.242.26$3,146
May 1997211,35018.972.31$3,515
Apr 1997361,30217.882.08$3,355
Mar 1997351,34818.951.94$3,277
Feb 1997181,21920.492.21$3,058
Jan 1997511,28423.483.54$5,742
Dec 19961494423.32$326
Nov 1996291,14321.97$637
Oct 1996311,51723.31$723
Sep 1996161,28222.22$356
Aug 1996431,80620.26$871
Jul 1996301,90419.55$587
Jun 1996181,99118.73$337
May 1996231,19319.43$447
Apr 19963321221.51$710
Mar 19963117319.38$601
Feb 19963341616.98$560
Jan 19963695817.07$615
Dec 1995351,44717.19$602
Nov 1995511,48916.00$816
Oct 1995341,73215.43$525
Sep 1995331,45616.18$534
Aug 1995351,08715.92$557
Jul 1995331,51615.24$503
Jun 1995371,49316.41$607
May 1995511,63417.56$896
Apr 1995321,34617.73$567
Mar 1995331,65016.44$543
Feb 1995291,24216.58$481
Jan 1995491,64915.92$780
Dec 1994341,92615.03$511
Nov 1994441,51415.90$700
Oct 1994201,29615.58$312
Sep 199402,24015.29$0
Aug 199401,94116.13$0
Jul 199402,41017.56$0
Jun 199401,20717.09$0
May 199402,04915.88$0
Apr 199402,85014.14$0
Mar 199402,12712.46$0
Feb 199401,80712.50$0
Jan 199403,02612.66$0
Dec 199302,49412.33$0
Nov 199303,37214.49$0
Oct 199302,92615.85$0
Sep 199303,16315.03$0
Aug 199303,56615.66$0
Jul 199303,81215.46$0
Jun 199304,27116.79$0
May 199305,34517.68$0
Apr 199304,82318.05$0
Mar 199305,52418.14$0
Feb 199305,01417.90$0
Jan 199302,61416.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2001 — as filed, then multipliedworked
Condensate             0 bbl  × $ 24.68 =         $0
Gas                   13 Mcf  × $  5.34 =        $69

────────────────────────────────────────────────────
Month total                                      $69

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/141114 is the state's own key, not one this site invented.