Operated by TEXAS INDEPENDENT EXPLOR., INC. (P-5 846542) in the SAN SALVADOR (CONSOLIDATED FRIO) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 142556District 04Field 80393050CondensateGasSaveExport
Value, all time
$18 k
Jan 1993 – Dec 1998
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
72
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 74 leases and 74 wells, and the rule below applies to all of them.

Discovered
1996-08-22
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1996-08-02.

The Commission's schedule remark for this field reads: 10-1-96.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition883 bbl$13,145
GasProduction116,315 Mcf$5,191
Total$18,336

114,086 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 26.4112, -98.0875. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

26.41118, -98.08746 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
9,130 ft
1 wells filed one
Completion to plug
6.2 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,130 ft.

Completions filed
Aug 1992
1 of 1 wells
Plug dates filed
Oct 1998
1 of 1 wells

Last completion to plug: a median of 6.2 years across the 1 well that filed both dates, with the middle half between 6.2 years and 6.2 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2153207719,130 ftAug 1992Oct 1998Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (72)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

72 months

Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 1998152012.421.97$1,888
Sep 19980012.592.08$0
Aug 19980011.301.91$0
Jul 19980011.742.24$0
Jun 19980011.242.24$0
May 19980012.622.21$0
Apr 19980013.042.51$0
Mar 19980012.802.31$0
Feb 19980013.952.30$0
Jan 19980014.702.15$0
Dec 19970016.322.41$0
Nov 19970018.193.09$0
Oct 19970019.253.15$0
Sep 19970017.742.95$0
Aug 19970017.862.55$0
Jul 19970017.582.25$0
Jun 19970017.242.26$0
May 1997027418.972.31$633
Apr 1997058317.882.08$1,214
Mar 1997066818.951.94$1,295
Feb 1997033220.492.21$732
Jan 1997037223.483.54$1,317
Dec 1996053023.32$0
Nov 1996059721.97$0
Oct 1996089723.31$0
Sep 1996058722.22$0
Aug 1996051820.26$0
Jul 199601,24819.55$0
Jun 199601,11118.73$0
May 1996050719.43$0
Apr 1996047221.51$0
Mar 1996083119.38$0
Feb 199601,26016.98$0
Jan 199601,29517.07$0
Dec 1995088217.19$0
Nov 199501,11516.00$0
Oct 199501,66115.43$0
Sep 199551,58916.18$81
Aug 199501,82615.92$0
Jul 199501,55715.24$0
Jun 199501,60716.41$0
May 199501,63017.56$0
Apr 199501,98417.73$0
Mar 199501,56316.44$0
Feb 199501,49516.58$0
Jan 199501,47915.92$0
Dec 199401,47615.03$0
Nov 199401,10815.90$0
Oct 19943621,68515.58$5,640
Sep 199401,52615.29$0
Aug 199401,74716.13$0
Jul 199401,62517.56$0
Jun 199402,19917.09$0
May 199402,09915.88$0
Apr 199402,55114.14$0
Mar 19941802,36612.46$2,243
Feb 199402,32712.50$0
Jan 199403,27612.66$0
Dec 199302,69412.33$0
Nov 199303,25814.49$0
Oct 199302,49315.85$0
Sep 199303,20615.03$0
Aug 199303,32715.66$0
Jul 199304,26515.46$0
Jun 199305,03016.79$0
May 199305,48317.68$0
Apr 199305,98218.05$0
Mar 199305,95918.14$0
Feb 19931848,99417.90$3,294
Jan 1993011,16916.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 1998 — as filed, then multipliedworked
Condensate           152 bbl  × $ 12.42 =     $1,888
Gas                    0 Mcf  × $  1.97 =         $0

────────────────────────────────────────────────────
Month total                                   $1,888

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/142556 is the state's own key, not one this site invented.