GAS UNIT A ZONE 6

Operated by MW PETROLEUM CORPORATION (P-5 597371) in the LA SAL VIEJA (6 8774-9165) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 142782District 04Field 51011696CondensateGasSave
Value, all time
$65 k
Jan 1993 – Jun 1998
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
66
no gaps in the span
Streams
2
condensate, gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,903 bbl$31,560
GasProduction644,718 Mcf$33,245
Total$64,805

631,435 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 26.4789, -97.8433. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

26.47893, -97.84327 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,010 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,010 ft.

Completions filed
Mar 2006
1 of 1 wells

1 well

42-48930613610,010 ftMar 2006Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (66)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

66 months

Jun 19980011.242.24$0
May 19980012.622.21$0
Apr 19980013.042.51$0
Mar 19980012.802.31$0
Feb 19980013.952.30$0
Jan 19980014.702.15$0
Dec 19970016.322.41$0
Nov 199714018.193.09$255
Oct 19972344719.253.15$1,851
Sep 19974145717.742.95$2,078
Aug 19971026517.862.55$1,988
Jul 199734317.582.25$149
Jun 199714917.242.26$128
May 199721,41318.972.31$3,300
Apr 199702,40017.882.08$4,999
Mar 199702,79118.951.94$5,412
Feb 199702,58320.492.21$5,698
Jan 199703,03523.483.54$10,743
Dec 199602,87723.32$0
Nov 199603,02321.97$0
Oct 199603,30623.31$0
Sep 199603,86422.22$0
Aug 199603,10920.26$0
Jul 199613,62319.55$20
Jun 199602,78418.73$0
May 199612,27819.43$19
Apr 199633,78621.51$65
Mar 199664,41519.38$116
Feb 199674,56016.98$119
Jan 199694,86717.07$154
Dec 199585,21117.19$138
Nov 199535,79716.00$48
Oct 199575,48015.43$108
Sep 199556,61916.18$81
Aug 199555,51715.92$80
Jul 199536,15615.24$46
Jun 199567,20716.41$98
May 1995189,78717.56$316
Apr 199568,26517.73$106
Mar 19951910,75716.44$312
Feb 19951510,46816.58$249
Jan 19952612,94315.92$414
Dec 19942913,51015.03$436
Nov 19942511,66215.90$398
Oct 19942612,16115.58$405
Sep 19943016,27315.29$459
Aug 19942416,56216.13$387
Jul 19942718,09917.56$474
Jun 19943318,19617.09$564
May 19942718,98215.88$429
Apr 19942818,06314.14$396
Mar 19943316,91312.46$411
Feb 19942714,61512.50$338
Jan 19942513,85512.66$317
Dec 19935412,07712.33$666
Nov 1993423,26014.49$609
Oct 1993102,03415.85$159
Sep 19932814,22215.03$421
Aug 19932722,71615.66$423
Jul 19933035,34515.46$464
Jun 19934720,68616.79$789
May 19934530,69217.68$796
Apr 19934735,80918.05$848
Mar 19936040,58718.14$1,088
Feb 199314241,03817.90$2,542
Jan 199370347,37916.93$11,902

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 1997 — as filed, then multipliedworked
Condensate            14 bbl  × $ 18.19 =       $255
Gas                    0 Mcf  × $  3.09 =         $0

────────────────────────────────────────────────────
Month total                                     $255

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/142782 is the state's own key, not one this site invented.