MONTALVO, E. A. GAS UNIT

Operated by KERR-MCGEE OIL & GAS ONSHORE LLC (P-5 457809) in the SUN, NORTH (GARZA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 14458District 04Field 87124517NGPA filingCondensateGasSaveExport
Value, all time
$241 k
Jan 1993 – Aug 2005
Value, last 12 filed months
$0
at the published price for each month
Months reported
152
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 17 leases and 17 wells, and the rule below applies to all of them.

Discovered
1952-01-24
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres.

The Commission's schedule remark for this field reads: MULTI 49-B RULE

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,350 bbl$37,681
GasProduction214,091 Mcf$203,779
Total$241,460

135,820 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 26.7154, -98.4755. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

26.71535, -98.47552 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,610 ft
1 wells filed one
Completion to plug
30.9 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,610 ft.

Completions filed
Sep 1974
1 of 1 wells
Plug dates filed
Aug 2005
1 of 1 wells

Last completion to plug: a median of 30.9 years across the 1 well that filed both dates, with the middle half between 30.9 years and 30.9 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4270057575,610 ftSep 1974Aug 2005Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (152)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

152 months

Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 200301628.804.60$74
Oct 200303128.174.76$148
Sep 200305226.314.75$247
Aug 200306029.765.13$308
Jul 200306629.415.17$341
Jun 200308328.565.98$497
May 200308926.595.97$532
Apr 200308926.675.41$481
Mar 2003010731.146.10$652
Feb 200306333.487.93$499
Jan 200309130.315.58$508
Dec 2002010926.914.85$529
Nov 2002011224.664.14$463
Oct 2002014326.464.23$605
Sep 2002010527.443.64$382
Aug 2002015725.963.16$497
Jul 2002017024.583.06$521
Jun 2002011523.733.34$384
May 2002010224.663.58$366
Apr 2002014323.653.51$502
Mar 2002016122.003.10$500
Feb 2002015518.222.38$368
Jan 2002018117.172.38$430
Dec 2001019616.932.36$463
Nov 2001020318.072.41$488
Oct 2001023219.782.53$587
Sep 2001024824.262.25$558
Aug 2001027024.873.05$824
Jul 2001020223.933.20$646
Jun 20010424.563.82$15
May 2001021225.524.31$913
Apr 2001025824.685.34$1,377
Mar 2001027324.545.38$1,468
Feb 2001022927.755.77$1,321
Jan 2001028927.478.40$2,427
Dec 2000032526.889.12$2,965
Nov 2000034232.215.66$1,935
Oct 2000038431.235.15$1,976
Sep 2000039031.875.19$2,023
Aug 2000045229.644.54$2,052
Jul 2000047528.534.09$1,943
Jun 2000048729.304.40$2,141
May 2000051927.263.68$1,910
Apr 2000054724.513.12$1,704
Mar 2000061828.422.86$1,767
Feb 2000061627.622.73$1,680
Jan 2000070425.272.48$1,746
Dec 1999075524.282.42$1,830
Nov 1999080823.192.43$1,967
Oct 1999083820.982.80$2,350
Sep 1999094221.752.62$2,467
Aug 199901,04119.262.88$2,994
Jul 199901,16417.892.37$2,761
Jun 199901,22115.942.36$2,884
May 199901,38715.792.32$3,219
Apr 199901,47015.102.21$3,246
Mar 199901,61212.471.84$2,963
Feb 199901,5139.981.82$2,750
Jan 199901,69310.381.90$3,217
Dec 199801,7039.201.77$3,020
Nov 199801,70210.892.19$3,720
Oct 199801,80912.421.97$3,562
Sep 199801,78112.592.08$3,709
Aug 199801,89311.301.91$3,611
Jul 199801,95011.742.24$4,363
Jun 199801,77711.242.24$3,976
May 199821,69012.622.21$3,754
Apr 199831,89313.042.51$4,782
Mar 199801,92712.802.31$4,450
Feb 199801,75113.952.30$4,026
Jan 199801,95114.702.15$4,204
Dec 199711,92416.322.41$4,655
Nov 199732,14918.193.09$6,691
Oct 199732,38719.253.15$7,576
Sep 199712,42917.742.95$7,195
Aug 199712,61817.862.55$6,706
Jul 199722,70117.582.25$6,104
Jun 199722,48917.242.26$5,653
May 199752,77018.972.31$6,489
Apr 199732,89517.882.08$6,083
Mar 199783,06118.951.94$6,087
Feb 199752,72320.492.21$6,109
Jan 199752,97923.483.54$10,662
Dec 199623,07623.32$47
Nov 199663,48521.97$132
Oct 199663,05223.31$140
Sep 199641,55822.22$89
Aug 199631,48520.26$61
Jul 199641,56919.55$78
Jun 199621,69718.73$37
May 199631,99919.43$58
Apr 199672,00921.51$151
Mar 199661,96319.38$116
Feb 199631,50816.98$51
Jan 199621,75417.07$34
Dec 199521,70517.19$34
Nov 199521,45116.00$32
Oct 199551,54315.43$77
Sep 1995102,01716.18$162
Aug 1995281,74715.92$446
Jul 1995511,04515.24$777
Jun 19951861,85416.41$3,052
May 1995282,62917.56$492
Apr 1995152,52217.73$266
Mar 1995932,56216.44$1,529
Feb 19951852,18616.58$3,067
Jan 19952192,43615.92$3,486
Dec 1994162,39615.03$240
Nov 199402,52115.90$0
Oct 199432,70915.58$47
Sep 1994242,80115.29$367
Aug 1994543,08816.13$871
Jul 1994292,79217.56$509
Jun 1994373,28717.09$632
May 1994333,47915.88$524
Apr 199493,42314.14$127
Mar 1994453,50612.46$561
Feb 19941093,14412.50$1,363
Jan 19941033,78912.66$1,304
Dec 1993413,86512.33$506
Nov 1993973,89414.49$1,406
Oct 1993544,04815.85$856
Sep 19931143,92715.03$1,713
Aug 1993564,20415.66$877
Jul 1993444,30315.46$680
Jun 19931054,19116.79$1,763
May 1993245,08517.68$424
Apr 1993534,20718.05$957
Mar 1993324,59018.14$580
Feb 19931873,77017.90$3,347
Jan 19931653,94916.93$2,793

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2003 — as filed, then multipliedworked
Condensate             0 bbl  × $ 28.80 =         $0
Gas                   16 Mcf  × $  4.60 =        $74

────────────────────────────────────────────────────
Month total                                      $74

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/14458 is the state's own key, not one this site invented.