DOUGHERTY, M. P.

Operated by KERR-MCGEE OIL & GAS ONSHORE LP (P-5 457807) in the FOY, E. (6300) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 149304District 04Field 32436650NGPA filingCondensateGasSaveExport
Value, all time
$2.5 M
Mar 1994 – May 2006
Value, last 12 filed months
$284
at the published price for each month
Months reported
147
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 4 leases and 4 wells, and the rule below applies to all of them.

Discovered
1994-03-05
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 11/01/97.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition14,688 bbl$250,813
GasProduction1,646,368 Mcf$2,203,227
Total$2,454,040

801,357 Mcf of this lease's gas, across 33 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 26.3282, -98.4319. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

26.32818, -98.43192 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,809 ft
1 wells filed one
Completion to plug
11.2 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,809 ft.

Completions filed
Mar 1994
1 of 1 wells
Plug dates filed
May 2005
1 of 1 wells

Last completion to plug: a median of 11.2 years across the 1 well that filed both dates, with the middle half between 11.2 years and 11.2 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2153215076016,809 ftMar 1994May 2005Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (147)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

147 months

May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20065056.707.08$284
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 2003041930.266.30$2,640
Nov 2003074828.804.60$3,437
Oct 2003819628.174.76$1,158
Sep 20030026.314.75$0
Aug 20031729.765.13$66
Jul 200304729.415.17$243
Jun 200304028.565.98$239
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020926.464.23$38
Sep 2002168127.443.64$733
Aug 200216225.963.16$222
Jul 2002242924.583.06$1,363
Jun 2002153323.733.34$1,803
May 200201824.663.58$65
Apr 2002057623.653.51$2,023
Mar 2002031122.003.10$965
Feb 2002026118.222.38$620
Jan 2002031017.172.38$736
Dec 20010016.932.36$0
Nov 2001032518.072.41$782
Oct 2001047319.782.53$1,196
Sep 200102,42524.262.25$5,459
Aug 200102,92524.873.05$8,930
Jul 200103,39923.933.20$10,867
Jun 200102,42224.563.82$9,262
May 200103,20925.524.31$13,822
Apr 200103,96324.685.34$21,144
Mar 200104,79424.545.38$25,775
Feb 200103,87527.755.77$22,347
Jan 200102,74527.478.40$23,055
Dec 200004,25226.889.12$38,789
Nov 200004,43132.215.66$25,071
Oct 200003,95131.235.15$20,330
Sep 200003,89831.875.19$20,217
Aug 200005,39629.644.54$24,502
Jul 200005,96728.534.09$24,404
Jun 200007,38129.304.40$32,456
May 200008,96027.263.68$32,971
Apr 200008,59824.513.12$26,791
Mar 200006,48728.422.86$18,551
Feb 200006,07527.622.73$16,563
Jan 200006,84425.272.48$16,977
Dec 199908,47724.282.42$20,546
Nov 199905,29023.192.43$12,876
Oct 1999549,54520.982.80$27,894
Sep 199906,43321.752.62$16,847
Aug 199909,10619.262.88$26,185
Jul 1999012,21217.892.37$28,971
Jun 1999014,00515.942.36$33,081
May 19998116,02115.792.32$38,464
Apr 1999013,74315.102.21$30,345
Mar 1999010,85112.471.84$19,948
Feb 19991217,3919.981.82$14,643
Jan 1999012,71310.381.90$24,154
Dec 1998013,8869.201.77$24,624
Nov 19981615,35410.892.19$33,734
Oct 19981618,92512.421.97$37,466
Sep 19981618,69712.592.08$39,140
Aug 19981620,28511.301.91$38,871
Jul 19985021,56511.742.24$48,834
Jun 19984122,16111.242.24$50,041
May 199821122,96512.622.21$53,331
Apr 199835721,76713.042.51$59,189
Mar 199859025,78012.802.31$67,089
Feb 199877425,23213.952.30$68,809
Jan 199871233,43014.702.15$82,501
Dec 19971,17636,66016.322.41$107,583
Nov 199772338,93018.193.09$133,377
Oct 199788213,80019.253.15$60,446
Sep 199789015,92517.742.95$62,845
Aug 199753518,73517.862.55$57,418
Jul 199752017,52717.582.25$48,524
Jun 199751825,80617.242.26$67,180
May 199766927,85118.972.31$76,985
Apr 199767440,64617.882.08$96,708
Mar 199753341,35118.951.94$90,286
Feb 199716936,16620.492.21$83,241
Jan 199715238,93823.483.54$141,398
Dec 199615232,53923.32$3,545
Nov 1996017,04421.97$0
Oct 199618017,04423.31$4,196
Sep 199617717,58122.22$3,933
Aug 199617221,94820.26$3,485
Jul 1996017,04919.55$0
Jun 199617620,53118.73$3,296
May 1996022,60319.43$0
Apr 199618026,34921.51$3,872
Mar 1996027,63219.38$0
Feb 199616226,45216.98$2,751
Jan 1996029,20517.07$0
Dec 199519027,89117.19$3,266
Nov 199517326,80716.00$2,768
Oct 199517929,60415.43$2,762
Sep 199517627,25516.18$2,848
Aug 1995030,25515.92$0
Jul 199517631,15315.24$2,682
Jun 199517629,36416.41$2,888
May 199528225,46517.56$4,952
Apr 1995024,47917.73$0
Mar 199517725,85416.44$2,910
Feb 199517923,74516.58$2,968
Jan 199517924,25615.92$2,850
Dec 1994021,47215.03$0
Nov 199417921,30815.90$2,846
Oct 199418022,17115.58$2,804
Sep 199417921,76815.29$2,737
Aug 1994022,51616.13$0
Jul 199417823,14817.56$3,126
Jun 199435622,44317.09$6,084
May 1994023,49915.88$0
Apr 1994020,92714.14$0
Mar 19940012.46$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2006 — as filed, then multipliedworked
Condensate             5 bbl  × $ 56.70 =       $284
Gas                    0 Mcf  × $  7.08 =         $0

────────────────────────────────────────────────────
Month total                                     $284

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/149304 is the state's own key, not one this site invented.