ARMENDAIZ, ET AL

Operated by MUELLER ENGINEERING CORP. (P-5 592645) in the ARROYO COLORADO (B-4) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 152454District 04Field 03922087CondensateGasSaveExport
Value, all time
$238 k
Dec 1994 – Nov 1999
Value, last 12 filed months
$11 k
at the published price for each month
Months reported
60
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 3 leases and 3 wells, and the rule below applies to all of them.

Discovered
1994-12-02
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF2 EFFECTIVE 4-1-96.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition49 bbl$643
GasProduction240,737 Mcf$237,787
Total$238,430

141,446 Mcf of this lease's gas, across 23 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 26.3665, -97.4788. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

26.36648, -97.47880 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,482 ft
1 wells filed one
Completion to plug
7.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,482 ft.

Completions filed
Aug 1992
1 of 1 wells
Plug dates filed
Nov 1999
1 of 1 wells

Last completion to plug: a median of 7.3 years across the 1 well that filed both dates, with the middle half between 7.3 years and 7.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4893005457,482 ftAug 1992Nov 1999Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (60)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

60 months

Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 1999009.981.82$0
Jan 199953,45610.381.90$6,618
Dec 199842,5399.201.77$4,539
Nov 199812,37510.892.19$5,202
Oct 199853,15812.421.97$6,281
Sep 199833,21612.592.08$6,735
Aug 199813,99811.301.91$7,637
Jul 199843,85611.742.24$8,674
Jun 199814,20011.242.24$9,408
May 199841,39612.622.21$3,131
Apr 199884813.042.51$225
Mar 199821,76012.802.31$4,090
Feb 199812,38913.952.30$5,507
Jan 199803,60614.702.15$7,770
Dec 199713,49316.322.41$8,438
Nov 199724,52018.193.09$13,995
Oct 199714,50419.253.15$14,206
Sep 199715,13917.742.95$15,203
Aug 199714,38917.862.55$11,231
Jul 199714,39617.582.25$9,895
Jun 199715,18017.242.26$11,710
May 199714,64718.972.31$10,747
Apr 199716,16717.882.08$12,862
Mar 199706,85418.951.94$13,291
Feb 199706,40120.492.21$14,120
Jan 199707,60423.483.54$26,916
Dec 199605,85423.32$0
Nov 19960021.97$0
Oct 19960023.31$0
Sep 199609322.22$0
Aug 1996050020.26$0
Jul 199603,04119.55$0
Jun 199603,95218.73$0
May 199604,58619.43$0
Apr 199604,69221.51$0
Mar 199604,47519.38$0
Feb 199606,00616.98$0
Jan 199606,65817.07$0
Dec 199507,10717.19$0
Nov 199507,56616.00$0
Oct 199507,20415.43$0
Sep 199506,98516.18$0
Aug 199506,57915.92$0
Jul 199507,54615.24$0
Jun 199507,59216.41$0
May 199507,47717.56$0
Apr 199509,44117.73$0
Mar 199509,29616.44$0
Feb 199507,79516.58$0
Jan 199508,21415.92$0
Dec 199408,78715.03$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 1999 — as filed, then multipliedworked
Condensate             5 bbl  × $ 10.38 =        $52
Gas                3,456 Mcf  × $  1.90 =     $6,566

────────────────────────────────────────────────────
Month total                                   $6,618

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/152454 is the state's own key, not one this site invented.