HOLMES, M.S.

Operated by CIMARRON ENGINEERING CORP. (P-5 153446) in the ALICE (STILLWELL 5340) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 155456District 04Field 01514140CondensateGasSaveExport
Value, all time
$300 k
Aug 1995 – Feb 2002
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
79
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 4 leases and 4 wells, and the rule below applies to all of them.

Discovered
1983-06-02
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 07/01/98.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,555 bbl$47,083
GasProduction321,849 Mcf$252,578
Total$299,661

222,056 Mcf of this lease's gas, across 17 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.6847, -98.1540. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.68467, -98.15399 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,500 ft
1 wells filed one
Completion to plug
6.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,500 ft.

Completions filed
Aug 1995
1 of 1 wells
Plug dates filed
Feb 2002
1 of 1 wells

Last completion to plug: a median of 6.5 years across the 1 well that filed both dates, with the middle half between 6.5 years and 6.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-249322412A5,500 ftAug 1995Feb 2002Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (79)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

79 months

Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 200105118.072.41$123
Oct 200106519.782.53$164
Sep 200106224.262.25$140
Aug 200108324.873.05$253
Jul 200106523.933.20$208
Jun 200107824.563.82$298
May 200104325.524.31$185
Apr 200104724.685.34$251
Mar 200104024.545.38$215
Feb 200109627.755.77$554
Jan 200108727.478.40$731
Dec 200007326.889.12$666
Nov 2000010432.215.66$588
Oct 200008631.235.15$443
Sep 200006131.875.19$316
Aug 200005229.644.54$236
Jul 200009328.534.09$380
Jun 2000012529.304.40$550
May 2000020227.263.68$743
Apr 20000024.513.12$0
Mar 200005528.422.86$157
Feb 200004827.622.73$131
Jan 2000010225.272.48$253
Dec 1999028824.282.42$698
Nov 1999030023.192.43$730
Oct 1999031020.982.80$869
Sep 1999015021.752.62$393
Aug 1999926819.262.88$1,967
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 1999009.981.82$0
Jan 19990010.381.90$0
Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 19980012.421.97$0
Sep 19980012.592.08$0
Aug 19980011.301.91$0
Jul 19980011.742.24$0
Jun 1998045211.242.24$1,011
May 1998052412.622.21$1,156
Apr 1998046613.042.51$1,167
Mar 19981542,15312.802.31$6,943
Feb 199801,58713.952.30$3,649
Jan 1998087014.702.15$1,875
Dec 1997641,29516.322.41$4,167
Nov 199702,02318.193.09$6,248
Oct 199704,88919.253.15$15,399
Sep 199705,27617.742.95$15,590
Aug 199706,07017.862.55$15,507
Jul 19971696,50717.582.25$17,592
Jun 199707,12817.242.26$16,089
May 19971659,85918.972.31$25,890
Apr 1997011,40017.882.08$23,744
Mar 199716314,91418.951.94$32,009
Feb 199707,49020.492.21$16,522
Jan 199716414,05623.483.54$53,605
Dec 1996014,50323.32$0
Nov 199616615,93521.97$3,647
Oct 1996016,40623.31$0
Sep 199616314,39122.22$3,622
Aug 1996012,83520.26$0
Jul 199617215,98719.55$3,363
Jun 1996014,22418.73$0
May 199616419,45919.43$3,187
Apr 1996010,86921.51$0
Mar 19968411,97319.38$1,628
Feb 199617010,42916.98$2,887
Jan 199616515,22117.07$2,817
Dec 199516915,89217.19$2,905
Nov 19951643,62016.00$2,624
Oct 199516713,08815.43$2,577
Sep 1995014,71716.18$0
Aug 199502,50715.92$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2001 — as filed, then multipliedworked
Condensate             0 bbl  × $ 18.07 =         $0
Gas                   51 Mcf  × $  2.41 =       $123

────────────────────────────────────────────────────
Month total                                     $123

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/155456 is the state's own key, not one this site invented.