CHAPMAN

Operated by GEISER, D. ALLEN (P-5 298989) in the ARNOLD-DAVID, NORTH (6430) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 157598District 04Field 03778870CondensateGasSaveExport
Value, all time
$665 k
Jan 1996 – Nov 2003
Value, last 12 filed months
$11 k
at the published price for each month
Months reported
95
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2 leases and 2 wells, and the rule below applies to all of them.

Discovered
1996-01-22
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,217 bbl$54,444
GasProduction316,399 Mcf$610,565
Total$665,009

97,947 Mcf of this lease's gas, across 12 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.6258, -97.5733. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.62575, -97.57334 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,225 ft
1 wells filed one
Completion to plug
23.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,225 ft.

Completions filed
Jan 1996
1 of 1 wells
Plug dates filed
Jul 2019
1 of 1 wells

Last completion to plug: a median of 23.5 years across the 1 well that filed both dates, with the middle half between 23.5 years and 23.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-355330254327,225 ftJan 1996Jul 2019Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (95)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

95 months

Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 200325026.595.97$665
Apr 200331345926.675.41$10,830
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 2002021224.664.14$877
Oct 200220868326.464.23$8,392
Sep 200216679927.443.64$7,460
Aug 200224360425.963.16$8,219
Jul 200219085824.583.06$7,297
Jun 200217192123.733.34$7,132
May 20022531,06124.663.58$10,042
Apr 20022041,64823.653.51$10,613
Mar 20023132,07722.003.10$13,330
Feb 200213181718.222.38$4,328
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 2001032718.072.41$787
Oct 200101,01219.782.53$2,559
Sep 200101,09024.262.25$2,454
Aug 200101,38924.873.05$4,241
Jul 200101,43423.933.20$4,585
Jun 200101,46124.563.82$5,587
May 200101,40325.524.31$6,043
Apr 200101,90424.685.34$10,158
Mar 200101,72824.545.38$9,290
Feb 200101,60127.755.77$9,233
Jan 200101,87927.478.40$15,781
Dec 200001,89826.889.12$17,315
Nov 200001,77732.215.66$10,054
Oct 200002,12331.235.15$10,924
Sep 200001,64731.875.19$8,542
Aug 200002,14529.644.54$9,740
Jul 200001,31728.534.09$5,386
Jun 200002,19729.304.40$9,661
May 200002,32427.263.68$8,552
Apr 200002,33424.513.12$7,273
Mar 200002,75928.422.86$7,890
Feb 200002,45627.622.73$6,696
Jan 200002,71225.272.48$6,727
Dec 199902,94424.282.42$7,135
Nov 199902,77523.192.43$6,754
Oct 199902,59720.982.80$7,281
Sep 199902,96221.752.62$7,757
Aug 199903,16819.262.88$9,110
Jul 199903,29117.892.37$7,807
Jun 199903,68815.942.36$8,711
May 199904,04115.792.32$9,379
Apr 199905,26115.102.21$11,617
Mar 199901,38512.471.84$2,546
Feb 199903,9559.981.82$7,189
Jan 199903,10610.381.90$5,901
Dec 199803,2749.201.77$5,806
Nov 199803,84610.892.19$8,406
Oct 199805,19312.421.97$10,226
Sep 199803,34512.592.08$6,966
Aug 199805,10011.301.91$9,727
Jul 199804,66211.742.24$10,430
Jun 199804,49011.242.24$10,045
May 199804,01312.622.21$8,854
Apr 199805,51913.042.51$13,827
Mar 199805,72912.802.31$13,231
Feb 199803,48813.952.30$8,019
Jan 199803,83614.702.15$8,266
Dec 199704,01816.322.41$9,688
Nov 199703,74318.193.09$11,559
Oct 199704,64519.253.15$14,631
Sep 199704,81117.742.95$14,216
Aug 199704,64717.862.55$11,872
Jul 199707,71517.582.25$17,335
Jun 199706,18617.242.26$13,963
May 199706,77818.972.31$15,647
Apr 199706,74617.882.08$14,050
Mar 199709,28718.951.94$18,009
Feb 199707,74620.492.21$17,087
Jan 199709,40623.483.54$33,294
Dec 199609,17823.32$0
Nov 199608,93321.97$0
Oct 199608,49523.31$0
Sep 199608,45822.22$0
Aug 199609,93120.26$0
Jul 1996010,74419.55$0
Jun 199609,02618.73$0
May 199608,80419.43$0
Apr 199608,77121.51$0
Mar 199608,45019.38$0
Feb 199607,11016.98$0
Jan 199604717.07$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2003 — as filed, then multipliedworked
Condensate            25 bbl  × $ 26.59 =       $665
Gas                    0 Mcf  × $  5.97 =         $0

────────────────────────────────────────────────────
Month total                                     $665

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/157598 is the state's own key, not one this site invented.