Operated by CRIMSON EXPLORATION OPER., INC. (P-5 190005) in the CAGE RANCH (6900) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 159227District 04Field 14611312CondensateGasSaveExport
Value, all time
$1.4 M
May 1996 – Mar 2009
Value, last 12 filed months
$0
at the published price for each month
Months reported
155
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 10 leases and 10 wells, and the rule below applies to all of them.

Discovered
1960-02-14
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1997-11-01.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 04/01/98.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition6,115 bbl$115,745
GasProduction782,567 Mcf$1,313,633
Total$1,429,378

237,160 Mcf of this lease's gas, across 7 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.0987, -98.2202. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.09875, -98.22016 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,950 ft
1 wells filed one
Completion to plug
12.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,950 ft.

Completions filed
May 1996
1 of 1 wells
Plug dates filed
Mar 2009
1 of 1 wells

Last completion to plug: a median of 12.8 years across the 1 well that filed both dates, with the middle half between 12.8 years and 12.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-047317117072-T7,950 ftMay 1996Mar 2009Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (155)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

155 months

Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 200376028.565.98$2,171
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 200267026.914.85$1,803
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 200241023.653.51$970
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 200001226.889.12$109
Nov 200005232.215.66$294
Oct 2000012331.235.15$633
Sep 2000022631.875.19$1,172
Aug 2000044429.644.54$2,016
Jul 2000036328.534.09$1,485
Jun 2000062129.304.40$2,731
May 2000060327.263.68$2,219
Apr 2000074524.513.12$2,321
Mar 2000068828.422.86$1,968
Feb 2000069027.622.73$1,881
Jan 2000060425.272.48$1,498
Dec 1999044624.282.42$1,081
Nov 199901,47423.192.43$3,588
Oct 199901,00120.982.80$2,807
Sep 199901,46921.752.62$3,847
Aug 199902,74519.262.88$7,894
Jul 199903,03017.892.37$7,188
Jun 199903,46215.942.36$8,178
May 199904,03015.792.32$9,354
Apr 199902,95015.102.21$6,514
Mar 199904,26612.471.84$7,842
Feb 199905,0799.981.82$9,233
Jan 199908,43210.381.90$16,020
Dec 199818810,4549.201.77$20,268
Nov 1998010,04310.892.19$21,951
Oct 1998011,18712.421.97$22,030
Sep 19981858,22712.592.08$19,463
Aug 1998015,85111.301.91$30,233
Jul 199817718,04511.742.24$42,450
Jun 1998017,25111.242.24$38,595
May 199819220,55812.622.21$47,781
Apr 1998020,68213.042.51$51,815
Mar 199818721,88612.802.31$52,938
Feb 1998019,38513.952.30$44,569
Jan 199818022,51314.702.15$51,157
Dec 1997021,49316.322.41$51,822
Nov 199716924,08618.193.09$77,458
Oct 199718723,84719.253.15$78,714
Sep 199719424,05117.742.95$74,509
Aug 199718524,58817.862.55$66,120
Jul 199736026,00717.582.25$64,765
Jun 199717926,87517.242.26$63,748
May 199718324,94318.972.31$61,052
Apr 199719028,61317.882.08$62,992
Mar 199718329,62218.951.94$60,909
Feb 199718622,20320.492.21$52,789
Jan 199719329,44223.483.54$108,747
Dec 199618128,19023.32$4,221
Nov 199638634,37621.97$8,480
Oct 199637537,70123.31$8,741
Sep 199655035,99522.22$12,221
Aug 199637538,60720.26$7,598
Jul 199655539,53419.55$10,850
Jun 199619122,75718.73$3,577
May 19960019.43$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2003 — as filed, then multipliedworked
Condensate            76 bbl  × $ 28.56 =     $2,171
Gas                    0 Mcf  × $  5.98 =         $0

────────────────────────────────────────────────────
Month total                                   $2,171

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/159227 is the state's own key, not one this site invented.