RAMIREZ, JOSEFA

Operated by XTO ENERGY INC. (P-5 945936) in the LOPENO (CONSOLIDATED) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 163790District 04Field 548660052 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.7 M
May 1997 – Jan 2008
Value, last 12 filed months
$0
at the published price for each month
Months reported
129
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 311 leases and 311 wells, and the rule below applies to all of them.

Discovered
2005-07-11
as the register files it
Field class
Gas
the register's own label
Between wells
0 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2005-07-11.

The Commission's schedule remark for this field reads: THERE IS NO BETWEEN WELL SPACING. NO P-15 AND PLATS REQUIRED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas221998-05-11 – 2002-04-082 dockets
NGPA3none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition16 bbl$187
GasProduction918,967 Mcf$2,724,968
Total$2,725,155

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 26.6807, -99.1186. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

26.68070, -99.11863 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
12,100 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,100 ft.

Completions filed
Jan 2008
1 of 1 wells

1 well

42-505335094 T12,100 ftJan 2008Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (129)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

129 months

Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 200409138.286.08$554
Jun 2004010936.106.43$701
May 2004010537.486.49$682
Apr 20040034.475.86$0
Mar 200405734.365.53$315
Feb 200409532.455.51$523
Jan 2004011032.036.30$693
Dec 2003011930.266.30$750
Nov 2003010428.804.60$478
Oct 2003014228.174.76$676
Sep 2003016026.314.75$760
Aug 2003012729.765.13$651
Jul 20030429.415.17$21
Jun 2003017028.565.98$1,017
May 2003044126.595.97$2,634
Apr 200308126.675.41$438
Mar 2003030331.146.10$1,847
Feb 20030033.487.93$0
Jan 2003051130.315.58$2,852
Dec 2002067526.914.85$3,276
Nov 2002062524.664.14$2,586
Oct 2002010126.464.23$427
Sep 2002052227.443.64$1,898
Aug 2002040525.963.16$1,281
Jul 2002046224.583.06$1,415
Jun 2002054523.733.34$1,819
May 200201,11824.663.58$4,007
Apr 2002067323.653.51$2,364
Mar 2002064222.003.10$1,992
Feb 2002053818.222.38$1,278
Jan 2002015217.172.38$361
Dec 2001035016.932.36$828
Nov 2001049318.072.41$1,186
Oct 2001039019.782.53$986
Sep 2001069824.262.25$1,571
Aug 2001013424.873.05$409
Jul 2001060723.933.20$1,941
Jun 2001096124.563.82$3,675
May 200101,17225.524.31$5,048
Apr 200103,94224.685.34$21,032
Mar 2001014,67824.545.38$78,915
Feb 2001013,08027.755.77$75,433
Jan 2001013,43627.478.40$112,846
Dec 2000012,87026.889.12$117,407
Nov 2000012,52132.215.66$70,844
Oct 2000013,32031.235.15$68,538
Sep 2000013,12431.875.19$68,068
Aug 2000012,33529.644.54$56,010
Jul 2000013,04728.534.09$53,359
Jun 2000015,68429.304.40$68,966
May 2000025,31327.263.68$93,146
Apr 2000017,35724.513.12$54,084
Mar 2000013,30028.422.86$38,035
Feb 2000014,20427.622.73$38,727
Jan 2000017,47325.272.48$43,342
Dec 1999017,38524.282.42$42,136
Nov 1999017,39223.192.43$42,332
Oct 1999017,29320.982.80$48,485
Sep 1999016,87221.752.62$44,185
Aug 1999010,93319.262.88$31,439
Jul 1999010,37617.892.37$24,616
Jun 1999017,40415.942.36$41,110
May 1999021,17415.792.32$49,145
Apr 1999017,72715.102.21$39,142
Mar 1999018,27012.471.84$33,586
Feb 1999017,8489.981.82$32,444
Jan 1999020,46610.381.90$38,884
Dec 1998224,5029.201.77$43,468
Nov 1998025,58810.892.19$55,928
Oct 1998021,01512.421.97$41,383
Sep 1998225,50312.592.08$53,138
Aug 1998124,61611.301.91$46,963
Jul 1998436,36411.742.24$81,403
Jun 199839,07811.242.24$20,344
May 19980012.622.21$0
Apr 19981013.042.51$13
Mar 1998325,28912.802.31$58,442
Feb 1998023,44013.952.30$53,892
Jan 1998028,55614.702.15$61,532
Dec 1997025,83016.322.41$62,279
Nov 1997027,44618.193.09$84,760
Oct 1997037,09419.253.15$116,839
Sep 1997039,07117.742.95$115,450
Aug 1997059,22717.862.55$151,310
Jul 1997043,53217.582.25$97,814
Jun 19970017.242.26$0
May 19970018.972.31$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2004 — as filed, then multipliedworked
Condensate             0 bbl  × $ 38.28 =         $0
Gas                   91 Mcf  × $  6.08 =       $554

────────────────────────────────────────────────────
Month total                                     $554

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/163790 is the state's own key, not one this site invented.