HUNTER

Operated by ANDERSON OIL LTD. (P-5 22499) in the WHITE POINT (2200) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 166754District 04Field 96978228GasSaveExport
Value, all time
$69 k
Jan 1998 – Mar 2000
Value, last 12 filed months
$23 k
at the published price for each month
Months reported
27
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2 leases and 2 wells, and the rule below applies to all of them.

Discovered
1958-12-18
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction30,355 Mcf$69,222
Total$69,222

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.8728, -97.4812. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.87278, -97.48119 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,997 ft
1 wells filed one
Completion to plug
14.4 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,997 ft.

Completions filed
Mar 2000
1 of 1 wells
Plug dates filed
Aug 2014
1 of 1 wells

Last completion to plug: a median of 14.4 years across the 1 well that filed both dates, with the middle half between 14.4 years and 14.4 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4093254985,997 ftMar 2000Aug 2014Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (27)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

27 months

Mar 200062528.422.86$1,787
Feb 200023027.622.73$627
Jan 200096325.272.48$2,389
Dec 199956024.282.42$1,357
Nov 199958123.192.43$1,414
Oct 199994020.982.80$2,635
Sep 199993221.752.62$2,441
Aug 19991,34419.262.88$3,865
Jul 199979317.892.37$1,881
Jun 199963315.942.36$1,495
May 199966715.792.32$1,548
Apr 199978715.102.21$1,738
Mar 19991,03312.471.84$1,899
Feb 19998069.981.82$1,465
Jan 199993810.381.90$1,782
Dec 19989019.201.77$1,598
Nov 19981,25910.892.19$2,752
Oct 199883412.421.97$1,642
Sep 19981,01812.592.08$2,120
Aug 199898011.301.91$1,869
Jul 19981,30611.742.24$2,922
Jun 19981,11711.242.24$2,499
May 19981,62012.622.21$3,574
Apr 19981,91113.042.51$4,788
Mar 19982,38112.802.31$5,499
Feb 19983,04013.952.30$6,989
Jan 19982,15614.702.15$4,646

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2000 — as filed, then multipliedworked
Gas                  625 Mcf  × $  2.86 =     $1,787

────────────────────────────────────────────────────
Month total                                   $1,787

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/166754 is the state's own key, not one this site invented.