LOPEZ, H.

Operated by EL PASO E & P COMPANY, L. P. (P-5 250195) in the ROLETA (WILCOX CONSOLIDATED) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 166856District 04Field 77973050CondensateGasSaveExport
Value, all time
$2.6 M
Jul 1997 – Jan 2011
Value, last 12 filed months
$0
at the published price for each month
Months reported
163
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 345 leases and 345 wells, and the rule below applies to all of them.

Discovered
1995-01-09
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2010-11-02.

The Commission's schedule remark for this field reads: PERMITTED/DRILLED/COMPLETED ON THE SAME LEASE.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition7 bbl$144
GasProduction659,157 Mcf$2,562,862
Total$2,563,006

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 26.6785, -99.1913. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

26.67852, -99.19131 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
11,573 ft
1 wells filed one
Completion to plug
4.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,573 ft.

Completions filed
Jul 2006
1 of 1 wells
Plug dates filed
Jan 2011
1 of 1 wells

Last completion to plug: a median of 4.5 years across the 1 well that filed both dates, with the middle half between 4.5 years and 4.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-50533598111,573 ftJul 2006Jan 2011Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (163)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

163 months

Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 200906672.544.11$271
Sep 200902,23065.543.06$6,834
Aug 200901,89967.423.22$6,112
Jul 200901,00561.133.46$3,482
Jun 200902,39666.163.90$9,332
May 200902,28254.743.93$8,959
Apr 200901,98946.773.59$7,136
Mar 200901,96342.144.06$7,968
Feb 200901,59332.814.63$7,380
Jan 200901,72335.865.37$9,254
Dec 200801,23237.105.98$7,364
Nov 200802,10055.496.86$14,407
Oct 200801,86775.246.92$12,923
Sep 20080348101.767.88$2,741
Aug 200801,998114.228.48$16,949
Jul 200802,196131.0811.39$25,011
Jun 200802,174131.3313.03$28,333
May 200802,332123.1711.57$26,991
Apr 200802,334110.3110.45$24,402
Mar 200802,613101.909.66$25,252
Feb 200802,87392.538.77$25,198
Jan 200801,93790.388.21$15,895
Dec 200702,49488.337.30$18,211
Nov 200702,57891.677.29$18,798
Oct 200702,91582.856.92$20,178
Sep 200702,41375.846.24$15,067
Aug 200703,03569.066.39$19,387
Jul 200702,71070.906.39$17,311
Jun 200702,98162.007.55$22,502
May 200701,91958.747.85$15,057
Apr 200702,75859.617.81$21,527
Mar 200702,47856.927.30$18,094
Feb 200702,82355.108.22$23,194
Jan 200712,53050.306.73$17,069
Dec 200602,79756.656.92$19,351
Nov 200603,18454.207.62$24,254
Oct 200604,23354.906.01$25,456
Sep 200603,36560.085.04$16,950
Aug 200601,17868.717.34$8,646
Jul 200601,87269.376.34$11,874
Jun 200601,69466.286.38$10,814
May 200601,21766.016.42$7,819
Apr 200601,22764.397.36$9,031
Mar 200601,07956.707.08$7,642
Feb 200601,37157.597.75$10,627
Jan 200601,69060.598.93$15,097
Dec 200501,59054.9413.42$21,330
Nov 200501,68054.6910.59$17,789
Oct 200501,73858.3413.80$23,977
Sep 200501,12161.4512.08$13,541
Aug 200501,91261.519.80$18,732
Jul 200502,14555.697.84$16,825
Jun 200502,13852.337.38$15,781
May 200502,05145.226.65$13,642
Apr 200501,96249.207.36$14,441
Mar 200502,32050.377.15$16,599
Feb 200501,72845.226.31$10,907
Jan 200502,25843.166.32$14,276
Dec 200402,38939.866.75$16,128
Nov 200402,25745.286.33$14,288
Oct 200402,39749.706.52$15,617
Sep 200402,97543.245.28$15,720
Aug 200402,62942.375.55$14,593
Jul 200403,03538.286.08$18,465
Jun 200403,12936.106.43$20,129
May 200403,21537.486.49$20,880
Apr 200403,52034.475.86$20,622
Mar 200403,61634.365.53$19,997
Feb 200403,02732.455.51$16,678
Jan 2004041732.036.30$2,627
Dec 2003041230.266.30$2,596
Nov 200301,34028.804.60$6,158
Oct 200301,89228.174.76$9,005
Sep 200301,14426.314.75$5,433
Aug 200302,21129.765.13$11,342
Jul 200302,57829.415.17$13,330
Jun 200302,67328.565.98$15,992
May 200302,01826.595.97$12,053
Apr 200302,29726.675.41$12,421
Mar 200303,26431.146.10$19,897
Feb 200302,96433.487.93$23,492
Jan 200303,30430.315.58$18,443
Dec 200202,87426.914.85$13,950
Nov 200202,51624.664.14$10,409
Oct 200203,07326.464.23$12,996
Sep 200202,90927.443.64$10,575
Aug 200203,82625.963.16$12,106
Jul 200204,26924.583.06$13,071
Jun 200202,71823.733.34$9,073
May 200202,63524.663.58$9,444
Apr 200202,15423.653.51$7,566
Mar 200203,41322.003.10$10,590
Feb 200203,35318.222.38$7,966
Jan 200202,44317.172.38$5,804
Dec 200101,88316.932.36$4,452
Nov 200102,66518.072.41$6,411
Oct 200103,85719.782.53$9,754
Sep 200104,18524.262.25$9,422
Aug 200102,62424.873.05$8,011
Jul 200104,18123.933.20$13,367
Jun 200103,84024.563.82$14,685
May 200104,69925.524.31$20,240
Apr 200103,22924.685.34$17,228
Mar 200103,01424.545.38$16,205
Feb 200102,83627.755.77$16,355
Jan 2001086427.478.40$7,257
Dec 200012,63526.889.12$24,065
Nov 200003,01732.215.66$17,070
Oct 200003,03831.235.15$15,632
Sep 200003,50831.875.19$18,194
Aug 200004,31729.644.54$19,602
Jul 200002,72228.534.09$11,132
Jun 200003,06929.304.40$13,495
May 200003,14327.263.68$11,565
Apr 200004,19424.513.12$13,069
Mar 200004,67428.422.86$13,366
Feb 200004,54027.622.73$12,378
Jan 200005,16025.272.48$12,799
Dec 199905,58524.282.42$13,536
Nov 199905,59023.192.43$13,606
Oct 199906,23920.982.80$17,492
Sep 199905,45121.752.62$14,275
Aug 199905,93019.262.88$17,052
Jul 199906,76017.892.37$16,037
Jun 199906,82315.942.36$16,117
May 199927,42315.792.32$17,261
Apr 199917,84815.102.21$17,344
Mar 199908,00312.471.84$14,712
Feb 199907,8829.981.82$14,328
Jan 199908,50410.381.90$16,157
Dec 199819,2819.201.77$16,467
Nov 1998010,14510.892.19$22,174
Oct 1998010,99812.421.97$21,657
Sep 1998011,28812.592.08$23,509
Aug 1998112,50811.301.91$23,868
Jul 1998013,65111.742.24$30,541
Jun 1998014,05611.242.24$31,447
May 1998015,57512.622.21$34,364
Apr 1998013,75713.042.51$34,466
Mar 1998017,01812.802.31$39,302
Feb 1998017,72813.952.30$40,759
Jan 1998022,81714.702.15$49,166
Dec 1997026,52716.322.41$63,959
Nov 1997033,25118.193.09$102,688
Oct 1997050,96719.253.15$160,537
Sep 19970017.742.95$0
Aug 19970017.862.55$0
Jul 1997043817.582.25$984

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2009 — as filed, then multipliedworked
Condensate             0 bbl  × $ 72.54 =         $0
Gas                   66 Mcf  × $  4.11 =       $271

────────────────────────────────────────────────────
Month total                                     $271

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/166856 is the state's own key, not one this site invented.