GUTIERREZ J. R.

Operated by EOG RESOURCES, INC. (P-5 253162) in the LOS MOGOTES (7400) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 173052District 04Field 54976790GasSaveExport
Value, all time
$270 k
May 1999 – Jul 2000
Value, last 12 filed months
$127 k
at the published price for each month
Months reported
15
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 5 leases and 5 wells, and the rule below applies to all of them.

Discovered
1985-07-15
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: LOS MOGOTES (WILCOX CONS.)54976950

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction107,927 Mcf$269,665
Total$269,665

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.0490, -99.2710. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.04903, -99.27100 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
8,150 ft
1 wells filed one
Completion to plug
14 months
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,150 ft.

Completions filed
May 1999
1 of 1 wells
Plug dates filed
Jul 2000
1 of 1 wells

Last completion to plug: a median of 14 months across the 1 well that filed both dates, with the middle half between 14 months and 14 months. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-5053392418,150 ftMay 1999Jul 2000Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (15)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

15 months

Jul 2000028.534.09$0
Jun 200014829.304.40$651
May 200055327.263.68$2,035
Apr 200049424.513.12$1,539
Mar 20001,68628.422.86$4,822
Feb 20004,12427.622.73$11,244
Jan 20004,62625.272.48$11,475
Dec 19996,05724.282.42$14,680
Nov 19993,40123.192.43$8,278
Oct 19997,10520.982.80$19,920
Sep 19998,01021.752.62$20,977
Aug 199910,80219.262.88$31,062
Jul 199916,80017.892.37$39,856
Jun 199917,53115.942.36$41,410
May 199926,59015.792.32$61,716

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2000 — as filed, then multipliedworked
Gas                  148 Mcf  × $  4.40 =       $651

────────────────────────────────────────────────────
Month total                                     $651

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/173052 is the state's own key, not one this site invented.