YTURRIA, H.

Operated by CODY ENERGY LLC (P-5 164455) in the CABAZOS (CONSOLIDATED) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 179697District 04Field 14419100CondensateGasSaveExport
Value, all time
$15.3 M
Aug 2000 – Dec 2010
Value, last 12 filed months
$13 k
at the published price for each month
Months reported
125
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 13 leases and 13 wells, and the rule below applies to all of them.

Discovered
2002-03-05
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 0 acres. The field rule took effect on 2002-04-01.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA SUSPENDED

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition8,739 bbl$293,035
GasProduction2,760,496 Mcf$15,026,196
Total$15,319,231

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 26.6063, -97.7305. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

26.60635, -97.73049 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,000 ft
1 wells filed one
Completion to plug
3.0 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,000 ft.

Completions filed
Apr 2010
1 of 1 wells
Plug dates filed
Apr 2013
1 of 1 wells

Last completion to plug: a median of 3.0 years across the 1 well that filed both dates, with the middle half between 3.0 years and 3.0 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-261312392015,000 ftApr 2010Apr 2013Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (125)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

125 months

Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 201024078.103.51$1,874
Sep 20100072.633.98$0
Aug 2010145073.684.42$10,684
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 2009051974.593.75$1,947
Oct 200901,99872.544.11$8,212
Sep 200902,29665.543.06$7,037
Aug 200905,64867.423.22$18,178
Jul 200909,86561.133.46$34,177
Jun 2009010,64266.163.90$41,451
May 2009018,05554.743.93$70,879
Apr 200915132,46646.773.59$123,534
Mar 200912739,76042.144.06$166,738
Feb 200917938,70532.814.63$185,193
Jan 200918045,30635.865.37$249,793
Dec 200815147,52337.105.98$289,654
Nov 200823847,58155.496.86$339,629
Oct 2008047,77575.246.92$330,698
Sep 2008049,761101.767.88$391,972
Aug 20085852,262114.228.48$449,964
Jul 2008049,770131.0811.39$566,852
Jun 200804,657131.3313.03$60,693
May 200896460123.1711.57$17,148
Apr 200806,336110.3110.45$66,242
Mar 2008304,640101.909.66$47,898
Feb 200801,01292.538.77$8,876
Jan 200801,09490.388.21$8,977
Dec 2007065888.337.30$4,805
Nov 200703191.677.29$226
Oct 20070082.856.92$0
Sep 2007030775.846.24$1,917
Aug 2007087069.066.39$5,558
Jul 200701,22470.906.39$7,819
Jun 200701,71662.007.55$12,953
May 200701,84658.747.85$14,484
Apr 200702,75459.617.81$21,496
Mar 200703,92156.927.30$28,631
Feb 200703,22255.108.22$26,472
Jan 200742,82250.306.73$19,184
Dec 200604,84856.656.92$33,541
Nov 2006134,66954.207.62$36,271
Oct 200604,48254.906.01$26,954
Sep 2006906,36960.085.04$37,489
Aug 200607,17968.717.34$52,693
Jul 200605,85269.376.34$37,118
Jun 200607,44566.286.38$47,528
May 2006010,10966.016.42$64,950
Apr 2006010,36464.397.36$76,284
Mar 2006013,35256.707.08$94,571
Feb 200607,91057.597.75$61,311
Jan 2006017,38760.598.93$155,324
Dec 2005011,75754.9413.42$157,725
Nov 2005017,20354.6910.59$182,152
Oct 2005019,20158.3413.80$264,892
Sep 200507,50561.4512.08$90,653
Aug 2005011,28261.519.80$110,528
Jul 2005015,57155.697.84$122,133
Jun 20057815,99952.337.38$122,171
May 200507,75045.226.65$51,546
Apr 20051059,98649.207.36$78,668
Mar 200509,11450.377.15$65,210
Feb 20051153,86445.226.31$29,590
Jan 20057917,30943.166.32$112,841
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 200401,24243.245.28$6,563
Aug 20049319,43642.375.55$111,823
Jul 20049230,55138.286.08$189,400
Jun 20045226,80536.106.43$174,314
May 200429127,17737.486.49$187,410
Apr 200413530,27834.475.86$182,036
Mar 200424750,07734.365.53$285,420
Feb 200424548,21032.455.51$273,569
Jan 200415944,29232.036.30$284,116
Dec 200326048,92830.266.30$316,194
Nov 20038747,63628.804.60$221,401
Oct 200318047,93728.174.76$233,233
Sep 20039941,65426.314.75$200,435
Aug 200317039,87129.765.13$209,586
Jul 200313426,82729.415.17$142,659
Jun 200321131,58728.565.98$195,010
May 200312447,52326.595.97$287,137
Apr 200325243,82626.675.41$243,700
Mar 200323137,53231.146.10$235,990
Feb 20038842,36233.487.93$338,702
Jan 200319047,76630.315.58$272,391
Dec 2002049,59526.914.85$240,722
Nov 2002046,63924.664.14$192,944
Oct 200210950,24826.464.23$215,389
Sep 2002045,09027.443.64$163,911
Aug 200221146,31125.963.16$152,013
Jul 200220445,57624.583.06$144,557
Jun 200221444,70923.733.34$154,328
May 200210046,89024.663.58$170,520
Apr 200220545,84723.653.51$165,878
Mar 200210147,43722.003.10$149,406
Feb 200216639,14918.222.38$96,030
Jan 20027744,38417.172.38$106,764
Dec 200116645,01616.932.36$109,246
Nov 20018443,49918.072.41$106,156
Oct 200122344,96719.782.53$118,127
Sep 20019941,26324.262.25$95,298
Aug 20016241,13424.873.05$127,131
Jul 20019339,94623.933.20$129,936
Jun 200110636,92424.563.82$143,807
May 200110838,23025.524.31$167,425
Apr 200120132,93524.685.34$180,679
Mar 200119742,84524.545.38$235,188
Feb 200111840,75227.755.77$238,295
Jan 200116143,76527.478.40$371,994
Dec 200022845,47526.889.12$420,974
Nov 200010937,86932.215.66$217,774
Oct 200014138,38531.235.15$201,913
Sep 20005330,09031.875.19$157,751
Aug 20000029.644.54$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2010 — as filed, then multipliedworked
Condensate            24 bbl  × $ 78.10 =     $1,874
Gas                    0 Mcf  × $  3.51 =         $0

────────────────────────────────────────────────────
Month total                                   $1,874

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/179697 is the state's own key, not one this site invented.