KITTOE

Operated by DEVON ENERGY PRODUCTION CO, L.P. (P-5 216378) in the AGUA DULCE (VICKSBURG CONSL.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 187303District 04Field 00832406CondensateGasSaveExport
Value, all time
$8.2 M
Oct 2001 – Sep 2014
Value, last 12 filed months
$0
at the published price for each month
Months reported
156
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 101 leases and 101 wells, and the rule below applies to all of them.

Discovered
1994-04-25
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1994-04-25.

The Commission's schedule remark for this field reads: FIELD.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition33,492 bbl$817,754
GasProduction1,944,568 Mcf$7,387,173
Total$8,204,927

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.7628, -97.8060. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.76274, -97.80597 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
10,730 ft
1 wells filed one
Completion to plug
10.2 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,730 ft.

Completions filed
Jul 2004
1 of 1 wells
Plug dates filed
Sep 2014
1 of 1 wells

Last completion to plug: a median of 10.2 years across the 1 well that filed both dates, with the middle half between 10.2 years and 10.2 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-35533412210,730 ftJul 2004Sep 2014Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (156)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

156 months

Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 201012073.684.42$884
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090365.543.06$9
Aug 20090167.423.22$3
Jul 20090161.133.46$3
Jun 20090266.163.90$8
May 20090254.743.93$8
Apr 20090446.773.59$14
Mar 200901242.144.06$49
Feb 200901332.814.63$60
Jan 200901035.865.37$54
Dec 20080937.105.98$54
Nov 200801955.496.86$130
Oct 200802075.246.92$138
Sep 2008020101.767.88$158
Aug 2008037114.228.48$314
Jul 200810419131.0811.39$13,849
Jun 2008045131.3313.03$586
May 2008049123.1711.57$567
Apr 2008034110.3110.45$355
Mar 2008024101.909.66$232
Feb 200807492.538.77$649
Jan 200809290.388.21$755
Dec 2007014588.337.30$1,059
Nov 2007013791.677.29$999
Oct 2007010682.856.92$734
Sep 200705175.846.24$318
Aug 2007012169.066.39$773
Jul 2007010070.906.39$639
Jun 2007010862.007.55$815
May 2007010058.747.85$785
Apr 2007013459.617.81$1,046
Mar 2007014356.927.30$1,044
Feb 2007017855.108.22$1,462
Jan 2007025150.306.73$1,688
Dec 2006021656.656.92$1,494
Nov 2006017054.207.62$1,295
Oct 2006020054.906.01$1,203
Sep 2006018260.085.04$917
Aug 2006023568.717.34$1,725
Jul 2006024669.376.34$1,560
Jun 200610835066.286.38$9,393
May 2006042966.016.42$2,756
Apr 2006042364.397.36$3,113
Mar 2006050756.707.08$3,591
Feb 2006047457.597.75$3,674
Jan 200611156960.598.93$11,809
Dec 2005015554.9413.42$2,079
Nov 2005026854.6910.59$2,838
Oct 2005042158.3413.80$5,808
Sep 20056166661.4512.08$11,793
Aug 2005070661.519.80$6,917
Jul 2005060555.697.84$4,745
Jun 20052052.337.38$105
May 200593145.226.65$613
Apr 200503149.207.36$228
Mar 20051022,18950.377.15$20,800
Feb 20051254,64745.226.31$34,984
Jan 20051175,30843.166.32$38,608
Dec 20041565,53939.866.75$43,612
Nov 20042025,04445.286.33$41,077
Oct 20041713,44749.706.52$30,956
Sep 2004896,79743.245.28$39,763
Aug 20042487,77042.375.55$53,636
Jul 20042079,19538.286.08$63,868
Jun 2004061636.106.43$3,963
May 2004010,87737.486.49$70,642
Apr 20049812,35234.475.86$75,742
Mar 2004013,14334.365.53$72,683
Feb 200418514,20132.455.51$84,245
Jan 2004017,92332.036.30$112,908
Dec 200317620,48430.266.30$134,409
Nov 200317622,70328.804.60$109,393
Oct 200313425,49228.174.76$125,108
Sep 200317726,78326.314.75$131,859
Aug 200318028,79029.765.13$153,041
Jul 200317823,98129.415.17$129,237
Jun 200317223,50328.565.98$145,530
May 200318824,96226.595.97$154,089
Apr 200324729,22126.675.41$164,594
Mar 200329631,73531.146.10$202,675
Feb 200323633,08633.487.93$270,137
Jan 200361944,73730.315.58$268,486
Dec 200273554,85026.914.85$286,008
Nov 20021,43366,64524.664.14$311,045
Oct 20021,26568,00126.464.23$321,056
Sep 20021,58494,38627.443.64$386,577
Aug 20021,986110,00925.963.16$399,643
Jul 20022,044121,89824.583.06$423,464
Jun 20022,334121,77523.733.34$461,900
May 20022,538127,41024.663.58$519,225
Apr 20022,094125,14123.653.51$489,058
Mar 20022,221118,89522.003.10$417,760
Feb 20022,525118,89018.222.38$328,450
Jan 20022,925130,17817.172.38$359,484
Dec 20013,023129,32816.932.36$356,963
Nov 20011,89988,28718.072.41$246,691
Oct 200105,40219.782.53$13,661

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2010 — as filed, then multipliedworked
Condensate            12 bbl  × $ 73.68 =       $884
Gas                    0 Mcf  × $  4.42 =         $0

────────────────────────────────────────────────────
Month total                                     $884

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/187303 is the state's own key, not one this site invented.