SHAEFFER RANCH - DAG

Operated by DALE OPERATIONS, LLC (P-5 197622) in the AMARGOSA (1900) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 187417District 04Field 02241200GasSaveExport
Value, all time
$249 k
Apr 2001 – Oct 2010
Value, last 12 filed months
$0
at the published price for each month
Months reported
115
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 4 leases and 4 wells, and the rule below applies to all of them.

Discovered
1980-02-27
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 06/01/2002.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction55,908 Mcf$248,848
Total$248,848

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.9490, -98.2241. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.94899, -98.22412 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,000 ft
1 wells filed one
Completion to plug
9.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,000 ft.

Completions filed
Apr 2001
1 of 1 wells
Plug dates filed
Oct 2010
1 of 1 wells

Last completion to plug: a median of 9.5 years across the 1 well that filed both dates, with the middle half between 9.5 years and 9.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2493239114,000 ftApr 2001Oct 2010Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (115)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

115 months

Oct 2010078.103.51$0
Sep 2010072.633.98$0
Aug 2010073.684.42$0
Jul 2010072.554.74$0
Jun 2010070.364.91$0
May 2010071.124.24$0
Apr 2010081.694.12$0
Mar 2010078.394.39$0
Feb 2010073.585.44$0
Jan 2010074.365.96$0
Dec 2009071.445.48$0
Nov 2009074.593.75$0
Oct 2009072.544.11$0
Sep 2009065.543.06$0
Aug 2009067.423.22$0
Jul 2009061.133.46$0
Jun 2009066.163.90$0
May 2009054.743.93$0
Apr 2009046.773.59$0
Mar 2009042.144.06$0
Feb 2009032.814.63$0
Jan 2009035.865.37$0
Dec 2008037.105.98$0
Nov 2008055.496.86$0
Oct 2008075.246.92$0
Sep 20080101.767.88$0
Aug 20080114.228.48$0
Jul 20080131.0811.39$0
Jun 20080131.3313.03$0
May 20080123.1711.57$0
Apr 20080110.3110.45$0
Mar 200858101.909.66$561
Feb 2008092.538.77$0
Jan 2008090.388.21$0
Dec 2007088.337.30$0
Nov 20074891.677.29$350
Oct 2007082.856.92$0
Sep 2007075.846.24$0
Aug 200735769.066.39$2,280
Jul 200734470.906.39$2,197
Jun 200731962.007.55$2,408
May 200728058.747.85$2,197
Apr 200725759.617.81$2,006
Mar 200726756.927.30$1,950
Feb 200733455.108.22$2,744
Jan 200732050.306.73$2,153
Dec 200632356.656.92$2,235
Nov 200620754.207.62$1,577
Oct 200629254.906.01$1,756
Sep 200628060.085.04$1,410
Aug 2006068.717.34$0
Jul 200626269.376.34$1,662
Jun 200622566.286.38$1,436
May 200618166.016.42$1,163
Apr 200618564.397.36$1,362
Mar 200624656.707.08$1,742
Feb 200629057.597.75$2,248
Jan 200623760.598.93$2,117
Dec 200529354.9413.42$3,931
Nov 200522054.6910.59$2,329
Oct 200516558.3413.80$2,276
Sep 200522761.4512.08$2,742
Aug 200524161.519.80$2,361
Jul 20053955.697.84$306
Jun 200524352.337.38$1,794
May 200547045.226.65$3,126
Apr 200528449.207.36$2,090
Mar 200526650.377.15$1,903
Feb 200530445.226.31$1,919
Jan 200518443.166.32$1,163
Dec 200430739.866.75$2,073
Nov 200423245.286.33$1,469
Oct 200432449.706.52$2,111
Sep 200434343.245.28$1,812
Aug 200432042.375.55$1,776
Jul 200422138.286.08$1,345
Jun 200447536.106.43$3,056
May 200454737.486.49$3,553
Apr 200447134.475.86$2,759
Mar 200439034.365.53$2,157
Feb 200434032.455.51$1,873
Jan 200457132.036.30$3,597
Dec 200332030.266.30$2,017
Nov 200340228.804.60$1,847
Oct 200336028.174.76$1,713
Sep 200353926.314.75$2,560
Aug 200359329.765.13$3,042
Jul 200360829.415.17$3,144
Jun 200364528.565.98$3,859
May 200363326.595.97$3,781
Apr 200354626.675.41$2,952
Mar 200364931.146.10$3,956
Feb 200378733.487.93$6,238
Jan 20031,13130.315.58$6,313
Dec 20021,31526.914.85$6,383
Nov 20021,13524.664.14$4,695
Oct 20021,33926.464.23$5,663
Sep 20021,36727.443.64$4,969
Aug 200299525.963.16$3,148
Jul 20021,24624.583.06$3,815
Jun 200299223.733.34$3,312
May 200257824.663.58$2,072
Apr 2002023.653.51$0
Mar 200271522.003.10$2,218
Feb 200289118.222.38$2,117
Jan 200294517.172.38$2,245
Dec 200172216.932.36$1,707
Nov 20011,82918.072.41$4,400
Oct 20012,73419.782.53$6,914
Sep 20013,14024.262.25$7,069
Aug 20015,77924.873.05$17,644
Jul 20013,73423.933.20$11,938
Jun 20013,60024.563.82$13,767
May 20012,85025.524.31$12,276
Apr 2001024.685.34$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2008 — as filed, then multipliedworked
Gas                   58 Mcf  × $  9.66 =       $561

────────────────────────────────────────────────────
Month total                                     $561

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/187417 is the state's own key, not one this site invented.