Operated by SM ENERGY COMPANY (P-5 788997) in the GOLD RIVER, NORTH (OLMOS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 188491District 04Field 355665002 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.1 M
Mar 2002 – Mar 2014
Value, last 12 filed months
$311
at the published price for each month
Months reported
145
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 830 leases and 840 wells, and the rule below applies to all of them.

Discovered
1978-10-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2005-10-25.

The Commission's schedule remark for this field reads: REMAIN SUSPENDED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas222002-06-11 – 2007-05-292 dockets
NGPA2none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition611 bbl$30,628
GasProduction182,989 Mcf$1,100,245
Total$1,130,873

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.0162, -99.9390. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.01624, -99.93896 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,000 ft
1 wells filed one
Completion to plug
12.0 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,000 ft.

Completions filed
Mar 2002
1 of 1 wells
Plug dates filed
Mar 2014
1 of 1 wells

Last completion to plug: a median of 12.0 years across the 1 well that filed both dates, with the middle half between 12.0 years and 12.0 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-479380341195,000 ftMar 2002Mar 2014Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (145)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

145 months

Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201331102.523.72$311
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20131091.233.42$91
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20122091.612.49$183
Apr 20121587101.652.00$1,274
Mar 20122343105.052.22$972
Feb 20122624101.102.57$1,806
Jan 2012258998.092.73$1,807
Dec 2011376896.873.24$2,779
Nov 2011178295.723.31$2,685
Oct 20110084.983.65$0
Sep 201115883.623.99$315
Aug 2011276583.404.15$3,341
Jul 2011268894.144.52$3,296
Jun 2011123092.904.64$1,160
May 2011223798.134.40$1,240
Apr 20116997105.964.33$4,956
Mar 201171,43796.364.06$6,505
Feb 2011583485.644.18$3,914
Jan 2011373086.504.59$3,609
Dec 2010769785.734.35$3,630
Nov 2010365880.843.80$2,740
Oct 2010358778.103.51$2,294
Sep 2010484372.633.98$3,645
Aug 2010595373.684.42$4,580
Jul 20101195472.554.74$5,317
Jun 201061,09370.364.91$5,789
May 201041,54171.124.24$6,811
Apr 2010111,74481.694.12$8,089
Mar 201091,24678.394.39$6,174
Feb 2010595773.585.44$5,576
Jan 201031,10374.365.96$6,801
Dec 200961,43971.445.48$8,320
Nov 2009101,18474.593.75$5,188
Oct 2009580472.544.11$3,667
Sep 200931,21665.543.06$3,923
Aug 2009773367.423.22$2,831
Jul 2009359961.133.46$2,259
Jun 2009746566.163.90$2,274
May 2009868954.743.93$3,143
Apr 2009454646.773.59$2,146
Mar 2009668942.144.06$3,049
Feb 2009061732.814.63$2,859
Jan 2009356635.865.37$3,148
Dec 200831,02937.105.98$6,262
Nov 200851,35955.496.86$9,601
Oct 200841,53775.246.92$10,940
Sep 200851,459101.767.88$12,001
Aug 200831,255114.228.48$10,989
Jul 200831,291131.0811.39$15,097
Jun 200821,490131.3313.03$19,681
May 200841,338123.1711.57$15,979
Apr 200831,299110.3110.45$13,912
Mar 200821,587101.909.66$15,541
Feb 200831,34592.538.77$12,074
Jan 200811,54390.388.21$12,752
Dec 200741,69888.337.30$12,752
Nov 200751,79391.677.29$13,532
Oct 200702,39682.856.92$16,585
Sep 200701,86375.846.24$11,633
Aug 200731,83369.066.39$11,916
Jul 200731,85870.906.39$12,081
Jun 200721,92462.007.55$14,647
May 200721,92058.747.85$15,182
Apr 200721,83459.617.81$14,434
Mar 200741,80756.927.30$13,422
Feb 200731,75155.108.22$14,552
Jan 2007462450.306.73$4,399
Dec 200622,85456.656.92$19,859
Nov 200671,15654.207.62$9,185
Oct 200651,87254.906.01$11,532
Sep 200641,33960.085.04$6,985
Aug 200651,53668.717.34$11,618
Jul 2006771369.376.34$5,008
Jun 200611,77066.286.38$11,366
May 200601,16366.016.42$7,472
Apr 200602,12464.397.36$15,634
Mar 200602,06056.707.08$14,591
Feb 200601,34857.597.75$10,449
Jan 200601,94760.598.93$17,393
Dec 200501,55454.9413.42$20,848
Nov 200501,59854.6910.59$16,920
Oct 200501,38158.3413.80$19,052
Sep 200501,41061.4512.08$17,031
Aug 200501,03861.519.80$10,169
Jul 200501,67655.697.84$13,146
Jun 200501,84852.337.38$13,640
May 200501,06345.226.65$7,070
Apr 200502,15849.207.36$15,884
Mar 200501,45950.377.15$10,439
Feb 200501,21445.226.31$7,663
Jan 200501,73743.166.32$10,982
Dec 200401,53539.866.75$10,363
Nov 200401,23945.286.33$7,843
Oct 200401,52849.706.52$9,955
Sep 200401,26143.245.28$6,663
Aug 200401,44842.375.55$8,037
Jul 200401,38438.286.08$8,421
Jun 200401,39736.106.43$8,987
May 200401,47137.486.49$9,554
Apr 200461,74734.475.86$10,442
Mar 200431,50734.365.53$8,437
Feb 200471,52832.455.51$8,646
Jan 200471,65432.036.30$10,644
Dec 2003141,54830.266.30$10,179
Nov 200331,62528.804.60$7,554
Oct 200371,74328.174.76$8,493
Sep 2003101,57526.314.75$7,743
Aug 200371,64029.765.13$8,621
Jul 2003101,64229.415.17$8,785
Jun 2003181,77728.565.98$11,146
May 200371,96226.595.97$11,905
Apr 2003121,98926.675.41$11,075
Mar 2003202,06031.146.10$13,181
Feb 2003302,02933.487.93$17,086
Jan 2003212,35130.315.58$13,760
Dec 2002213,01726.914.85$15,209
Nov 2002232,62124.664.14$11,410
Oct 200253,09526.464.23$13,221
Sep 2002124,62427.443.64$17,138
Aug 2002133,24725.963.16$10,612
Jul 2002203,04624.583.06$9,818
Jun 2002234,07823.733.34$14,159
May 2002254,45524.663.58$16,583
Apr 200276,55123.653.51$23,175
Mar 200201,17122.003.10$3,633

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2013 — as filed, then multipliedworked
Condensate             3 bbl  × $102.52 =       $308
Gas                    1 Mcf  × $  3.72 =         $4

────────────────────────────────────────────────────
Month total                                     $311

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well