STATE TRACT 84

Operated by CAMDEN RESERVES, INC. (P-5 126836) in the GOOSE ISLAND (C SD, LO.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 188515District 04Field 35877150GasSaveExport
Value, all time
$2.2 M
Jan 2002 – Mar 2011
Value, last 12 filed months
$10 k
at the published price for each month
Months reported
111
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6 leases and 10 wells, and the rule below applies to all of them.

Discovered
1976-03-10
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFF. 5-1-82 PER AMENDMENT TO SWR 28 & 29

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction356,804 Mcf$2,205,889
Total$2,205,889

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.1280, -97.0070. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.12798, -97.00695 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
8,300 ft
1 wells filed one
Completion to plug
9.2 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,300 ft.

Completions filed
Jan 2002
1 of 1 wells
Plug dates filed
Mar 2011
1 of 1 wells

Last completion to plug: a median of 9.2 years across the 1 well that filed both dates, with the middle half between 9.2 years and 9.2 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-0073061118,300 ftJan 2002Mar 2011Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (111)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

111 months

Mar 2011096.364.06$0
Feb 2011085.644.18$0
Jan 2011086.504.59$0
Dec 2010085.734.35$0
Nov 2010080.843.80$0
Oct 2010078.103.51$0
Sep 2010072.633.98$0
Aug 2010073.684.42$0
Jul 201011672.554.74$549
Jun 2010070.364.91$0
May 20101,08371.124.24$4,587
Apr 20101,15181.694.12$4,745
Mar 20101,16678.394.39$5,117
Feb 201094573.585.44$5,143
Jan 20101,17774.365.96$7,020
Dec 20091,23771.445.48$6,783
Nov 20091,17174.593.75$4,393
Oct 20091,57072.544.11$6,453
Sep 20092,00465.543.06$6,142
Aug 20091,94567.423.22$6,260
Jul 20092,00961.133.46$6,960
Jun 20092,02166.163.90$7,872
May 20092,33754.743.93$9,174
Apr 20092,21046.773.59$7,928
Mar 20091,72942.144.06$7,018
Feb 20091,96932.814.63$9,122
Jan 20091,12335.865.37$6,032
Dec 20081,37237.105.98$8,201
Nov 20081,16855.496.86$8,013
Oct 20081,42175.246.92$9,836
Sep 20081,293101.767.88$10,185
Aug 20081,428114.228.48$12,114
Jul 20082,012131.0811.39$22,916
Jun 20081,910131.3313.03$24,892
May 20082,449123.1711.57$28,345
Apr 20082,590110.3110.45$27,078
Mar 20082,462101.909.66$23,793
Feb 20082,74192.538.77$24,040
Jan 20082,80990.388.21$23,050
Dec 20073,14888.337.30$22,987
Nov 20072,88091.677.29$21,000
Oct 20072,97282.856.92$20,572
Sep 20073,10575.846.24$19,388
Aug 20073,71269.066.39$23,712
Jul 20073,06170.906.39$19,553
Jun 20073,27762.007.55$24,736
May 20073,44458.747.85$27,023
Apr 20072,64859.617.81$20,668
Mar 20073,40256.927.30$24,841
Feb 20073,04655.108.22$25,026
Jan 20073,41050.306.73$22,939
Dec 20063,30156.656.92$22,838
Nov 20063,23954.207.62$24,673
Oct 20063,02654.906.01$18,198
Sep 20063,47460.085.04$17,499
Aug 20064,01168.717.34$29,440
Jul 20062,67669.376.34$16,973
Jun 20063,66066.286.38$23,365
May 20063,54266.016.42$22,757
Apr 20063,25164.397.36$23,929
Mar 20062,70256.707.08$19,138
Feb 20062,28457.597.75$17,704
Jan 20063,10060.598.93$27,693
Dec 20052,62954.9413.42$35,269
Nov 20053,02754.6910.59$32,051
Oct 20053,00958.3413.80$41,511
Sep 20052,70061.4512.08$32,613
Aug 20053,71661.519.80$36,405
Jul 20054,56055.697.84$35,767
Jun 20054,83352.337.38$35,673
May 20053,84545.226.65$25,574
Apr 20053,61249.207.36$26,586
Mar 20053,76750.377.15$26,952
Feb 20053,88045.226.31$24,490
Jan 20055,42343.166.32$34,285
Dec 20044,66139.866.75$31,467
Nov 20044,61745.286.33$29,228
Oct 20045,06449.706.52$32,992
Sep 20045,32143.245.28$28,116
Aug 20045,82542.375.55$32,333
Jul 20045,84538.286.08$35,562
Jun 20045,92136.106.43$38,090
May 20045,67437.486.49$36,850
Apr 20045,65734.475.86$33,141
Mar 20045,94634.365.53$32,882
Feb 20044,71432.455.51$25,972
Jan 20045,99832.036.30$37,785
Dec 20035,31530.266.30$33,493
Nov 20034,74828.804.60$21,818
Oct 20034,37628.174.76$20,828
Sep 20035,27926.314.75$25,072
Aug 20036,05429.765.13$31,055
Jul 20033,96829.415.17$20,518
Jun 20036,05928.565.98$36,251
May 20036,60926.595.97$39,473
Apr 20035,96026.675.41$32,227
Mar 20035,92331.146.10$36,107
Feb 20034,70133.487.93$37,260
Jan 20035,26030.315.58$29,362
Dec 20023,49426.914.85$16,959
Nov 20024,34824.664.14$17,988
Oct 20025,24226.464.23$22,169
Sep 20026,10527.443.64$22,193
Aug 20026,30025.963.16$19,934
Jul 20026,67224.583.06$20,428
Jun 20024,62923.733.34$15,453
May 20022,94524.663.58$10,555
Apr 20023,84223.653.51$13,494
Mar 20024,60322.003.10$14,282
Feb 20023,41218.222.38$8,106
Jan 20023,72717.172.38$8,854

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2010 — as filed, then multipliedworked
Gas                  116 Mcf  × $  4.74 =       $549

────────────────────────────────────────────────────
Month total                                     $549

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/188515 is the state's own key, not one this site invented.