SPEAR, IRENE L.

Operated by HILCORP ENERGY COMPANY (P-5 386310) in the LA PERLA (LOBO CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 192471District 04Field 509250152 tax incentive programmesGasSaveExport
Value, all time
$1.7 M
Nov 2002 – May 2026
Value, last 12 filed months
$14 k
at the published price for each month
Months reported
283
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 719 leases and 719 wells, and the rule below applies to all of them.

Discovered
1999-06-29
as the register files it
Field class
Gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2010-11-02.

The Commission's schedule remark for this field reads: PERMITTED/DRILLED/COMPLETED ON THE SAME LEASE.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112003-06-10151380
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction288,582 Mcf$1,697,362
Total$1,697,362

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.2377, -99.3510. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.23766, -99.35100 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,844 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,844 ft.

Completions filed
Nov 2002
1 of 1 wells

1 well

42-5053453149,844 ftNov 2002

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (283)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

283 months

May 2026296106.413.05$902
Apr 202627198.932.87$778
Mar 202633589.753.15$1,055
Feb 202625763.503.75$964
Jan 202630259.138.00$2,415
Dec 202530456.664.41$1,342
Nov 202532358.593.93$1,268
Oct 202533859.383.30$1,117
Sep 202525862.743.08$794
Aug 202531563.933.01$950
Jul 202533266.743.32$1,101
Jun 202531566.483.13$986
May 202534660.553.23$1,118
Apr 202531862.363.54$1,127
Mar 202534867.704.27$1,485
Feb 202529270.884.34$1,268
Jan 202535574.324.28$1,519
Dec 202434368.993.12$1,071
Nov 202430969.052.20$679
Oct 202427571.372.28$627
Sep 202428169.612.36$664
Aug 202432075.632.06$660
Jul 202429779.932.15$638
Jun 202431478.082.63$827
May 202424978.812.20$547
Apr 202413384.451.66$221
Mar 20246980.301.55$107
Feb 20242576.091.78$45
Jan 202412173.023.30$399
Dec 202395871.262.61$2,501
Nov 20231,34577.892.81$3,776
Oct 20231,02585.443.09$3,164
Sep 202352489.042.74$1,433
Aug 202351580.522.67$1,377
Jul 202343174.852.64$1,139
Jun 202351268.962.26$1,156
May 202369270.622.23$1,541
Apr 202340178.122.24$897
Mar 202338472.852.39$919
Feb 202338675.112.47$952
Jan 202322276.533.39$752
Dec 202232276.415.73$1,845
Nov 202221085.005.65$1,186
Oct 202239787.185.86$2,328
Sep 202223984.888.16$1,951
Aug 202235594.529.13$3,240
Jul 2022574101.587.54$4,329
Jun 2022513115.097.98$4,092
May 2022562109.378.43$4,739
Apr 2022538104.226.84$3,679
Mar 2022992108.885.08$5,036
Feb 202264091.054.86$3,110
Jan 202247681.844.54$2,160
Dec 202141571.323.90$1,618
Nov 202144577.435.24$2,330
Oct 202155479.795.71$3,165
Sep 202130269.865.35$1,616
Aug 202146066.024.22$1,941
Jul 202153170.783.98$2,114
Jun 202149669.493.38$1,677
May 202154263.483.02$1,636
Apr 202147760.362.76$1,316
Mar 202147961.302.72$1,301
Feb 202141557.805.55$2,302
Jan 202146650.412.81$1,310
Dec 202048444.642.68$1,295
Nov 202045938.772.71$1,242
Oct 202047936.972.48$1,187
Sep 202047237.091.99$940
Aug 202050639.982.39$1,207
Jul 202049738.371.83$907
Jun 202041834.901.69$707
May 202043816.921.81$795
Apr 202043114.751.80$778
Mar 202042130.341.86$781
Feb 202043849.881.98$868
Jan 202040857.252.09$855
Dec 201935659.012.30$820
Nov 201932655.302.75$897
Oct 201938453.472.42$929
Sep 201934755.052.66$922
Aug 201937353.112.30$860
Jul 201938456.272.46$945
Jun 201941852.782.49$1,041
May 201932958.482.74$902
Apr 20199462.632.75$259
Mar 201949156.803.06$1,503
Feb 201948850.852.79$1,363
Jan 201942146.033.23$1,359
Dec 201836146.594.19$1,511
Nov 201837752.934.24$1,597
Oct 201838261.443.40$1,298
Sep 201866559.543.11$2,067
Aug 201841459.403.07$1,270
Jul 201836765.142.93$1,076
Jun 201845660.183.08$1,403
May 201847565.382.90$1,378
Apr 2018063.842.90$0
Mar 2018061.222.79$0
Feb 2018061.782.77$0
Jan 2018062.874.01$0
Dec 2017057.272.92$0
Nov 2017055.423.12$0
Oct 2017049.292.98$0
Sep 2017047.523.09$0
Aug 2017045.373.00$0
Jul 2017043.873.09$0
Jun 2017042.493.09$0
May 2017045.373.26$0
Apr 2017047.933.21$0
Mar 2017046.772.98$0
Feb 2017050.452.95$0
Jan 2017049.413.42$0
Dec 2016048.763.72$0
Nov 2016042.492.64$0
Oct 2016046.193.09$0
Sep 2016041.553.10$0
Aug 2016041.442.92$0
Jul 2016041.622.92$0
Jun 2016045.352.69$0
May 2016042.521.99$0
Apr 2016036.561.99$0
Mar 2016033.011.79$0
Feb 2016026.472.06$0
Jan 2016027.352.36$0
Dec 2015032.362.00$0
Nov 2015038.792.17$0
Oct 2015043.552.43$0
Sep 2015042.992.76$0
Aug 2015040.162.87$0
Jul 2015048.152.95$0
Jun 2015056.152.88$0
May 2015055.212.96$0
Apr 2015049.822.71$0
Mar 2015042.892.93$0
Feb 2015044.662.98$0
Jan 2015043.433.10$0
Dec 2014054.693.59$0
Nov 2014070.464.25$0
Oct 2014078.303.90$0
Sep 2014086.164.05$0
Aug 2014089.394.04$0
Jul 2014096.564.18$0
Jun 2014098.164.74$0
May 2014094.734.73$0
Apr 2014095.944.81$0
Mar 2014095.895.06$0
Feb 2014097.406.19$0
Jan 2014090.404.86$0
Dec 2013091.824.35$0
Nov 2013088.853.74$0
Oct 2013097.423.78$0
Sep 20130104.113.72$0
Aug 20130104.253.52$0
Jul 20130102.523.72$0
Jun 2013094.403.93$0
May 2013094.834.15$0
Apr 2013093.964.28$0
Mar 2013093.623.91$0
Feb 2013091.233.42$0
Jan 2013091.603.42$0
Dec 2012086.773.42$0
Nov 2012086.953.62$0
Oct 20121789.383.40$58
Sep 20122894.672.92$82
Aug 201211292.662.91$326
Jul 201248585.133.02$1,465
Jun 201255379.822.52$1,393
May 201243591.612.49$1,082
Apr 2012435101.652.00$869
Mar 2012495105.052.22$1,100
Feb 2012448101.102.57$1,151
Jan 20129998.092.73$271
Dec 20112896.873.24$91
Nov 20115695.723.31$185
Oct 201118784.983.65$682
Sep 20115983.623.99$235
Aug 201122083.404.15$913
Jul 201146994.144.52$2,119
Jun 201139392.904.64$1,823
May 201138798.134.40$1,705
Apr 2011495105.964.33$2,145
Mar 201145196.364.06$1,830
Feb 201141285.644.18$1,722
Jan 201154486.504.59$2,496
Dec 201061185.734.35$2,656
Nov 201051880.843.80$1,966
Oct 201069878.103.51$2,449
Sep 201066672.633.98$2,650
Aug 201071273.684.42$3,147
Jul 201055872.554.74$2,643
Jun 201065470.364.91$3,211
May 201067571.124.24$2,859
Apr 201070781.694.12$2,915
Mar 201030878.394.39$1,352
Feb 201027373.585.44$1,486
Jan 201051874.365.96$3,089
Dec 200955471.445.48$3,038
Nov 200951974.593.75$1,947
Oct 200961472.544.11$2,524
Sep 200965165.543.06$1,995
Aug 200966967.423.22$2,153
Jul 20091,00461.133.46$3,478
Jun 200964166.163.90$2,497
May 200946654.743.93$1,829
Apr 200944046.773.59$1,579
Mar 200947442.144.06$1,924
Feb 200946232.814.63$2,140
Jan 200925235.865.37$1,353
Dec 200842437.105.98$2,534
Nov 200854755.496.86$3,753
Oct 200871775.246.92$4,963
Sep 2008617101.767.88$4,860
Aug 2008179114.228.48$1,518
Jul 2008261131.0811.39$2,973
Jun 2008364131.3313.03$4,744
May 20081,221123.1711.57$14,132
Apr 20081,775110.3110.45$18,557
Mar 2008953101.909.66$9,210
Feb 200813792.538.77$1,202
Jan 200849290.388.21$4,037
Dec 200751888.337.30$3,782
Nov 200718491.677.29$1,342
Oct 200716882.856.92$1,163
Sep 200739575.846.24$2,466
Aug 200720869.066.39$1,329
Jul 200748270.906.39$3,079
Jun 200743762.007.55$3,299
May 200751558.747.85$4,041
Apr 200734359.617.81$2,677
Mar 200725656.927.30$1,869
Feb 200779255.108.22$6,507
Jan 200797450.306.73$6,552
Dec 200651556.656.92$3,563
Nov 200661454.207.62$4,677
Oct 200688954.906.01$5,346
Sep 20061,30960.085.04$6,594
Aug 20061,71368.717.34$12,573
Jul 20061,76669.376.34$11,201
Jun 20062,09766.286.38$13,387
May 20062,33666.016.42$15,009
Apr 20061,64964.397.36$12,137
Mar 20062,00456.707.08$14,194
Feb 20061,92257.597.75$14,898
Jan 20062,22760.598.93$19,895
Dec 20052,32154.9413.42$31,137
Nov 20052,34854.6910.59$24,862
Oct 20052,51258.3413.80$34,655
Sep 20052,50461.4512.08$30,246
Aug 20052,79861.519.80$27,412
Jul 20052,87555.697.84$22,550
Jun 20052,88252.337.38$21,272
May 20053,13445.226.65$20,845
Apr 20053,07649.207.36$22,641
Mar 20053,49150.377.15$24,978
Feb 20053,39645.226.31$21,435
Jan 20053,70143.166.32$23,398
Dec 20043,89039.866.75$26,262
Nov 20043,93045.286.33$24,879
Oct 20044,23749.706.52$27,604
Sep 20044,29343.245.28$22,684
Aug 20044,81142.375.55$26,704
Jul 20045,10438.286.08$31,054
Jun 20045,28736.106.43$34,011
May 20046,04337.486.49$39,247
Apr 20046,38234.475.86$37,389
Mar 20047,87834.365.53$43,566
Feb 20046,97232.455.51$38,413
Jan 20045,73232.036.30$36,110
Dec 20031,15630.266.30$7,285
Nov 20032,26828.804.60$10,422
Oct 200338428.174.76$1,828
Sep 20033,55326.314.75$16,874
Aug 20033,88429.765.13$19,924
Jul 20034,38029.415.17$22,648
Jun 20035,94528.565.98$35,569
May 20037,07526.595.97$42,257
Apr 20038,70526.675.41$47,070
Mar 200311,61931.146.10$70,830
Feb 20039,07633.487.93$71,935
Jan 200313,89130.315.58$77,540
Dec 200218,03626.914.85$87,542
Nov 20026,36624.664.14$26,336

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Gas                  296 Mcf  × $  3.05 =       $902

────────────────────────────────────────────────────
Month total                                     $902

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/192471 is the state's own key, not one this site invented.