FOWLER

Operated by MORTIMER PRODUCTION COMPANY (P-5 589954) in the HET (2500) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 194297District 04Field 40915332Hydrogen sulphide fieldCondensateGasSaveExport
Value, all time
$318 k
Feb 2003 – Apr 2005
Value, last 12 filed months
$162 k
at the published price for each month
Months reported
27
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 5 leases and 5 wells, and the rule below applies to all of them.

Discovered
1955-01-17
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition744 bbl$24,845
GasProduction50,902 Mcf$292,947
Total$317,793

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.1572, -97.8260. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.15716, -97.82605 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,113 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,113 ft.

Completions filed
Apr 2005
1 of 1 wells

1 well

42-4093269825,113 ftApr 2005Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (27)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

27 months

Apr 200581049.207.36$3,985
Mar 20050050.377.15$0
Feb 2005014445.226.31$909
Jan 2005055243.166.32$3,490
Dec 200401,61339.866.75$10,889
Nov 200403,51245.286.33$22,232
Oct 200406,04349.706.52$39,371
Sep 200406,47443.245.28$34,208
Aug 200406,12742.375.55$34,009
Jul 200402,17938.286.08$13,257
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 200417082534.475.86$10,693
Mar 200401,20734.365.53$6,675
Feb 200402,00632.455.51$11,052
Jan 20041722,52432.036.30$21,409
Dec 200302,88130.266.30$18,155
Nov 200303,93528.804.60$18,082
Oct 20031705,39228.174.76$30,453
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 200301,08528.565.98$6,492
May 2003074226.595.97$4,432
Apr 20030026.675.41$0
Mar 20031513,12631.146.10$23,758
Feb 2003053533.487.93$4,240

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2005 — as filed, then multipliedworked
Condensate            81 bbl  × $ 49.20 =     $3,985
Gas                    0 Mcf  × $  7.36 =         $0

────────────────────────────────────────────────────
Month total                                   $3,985

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/194297 is the state's own key, not one this site invented.