GRUENE, O. A.

Operated by URBAN OIL & GAS GROUP, LLC (P-5 879035) in the STRATTON (G-29-3) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 199275District 04Field 86508404GasSaveExport
Value, all time
$360 k
Oct 2003 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
272
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2 leases and 2 wells, and the rule below applies to all of them.

Discovered
1982-05-28
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: NET GOR 300 MCF

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction67,187 Mcf$360,472
Total$360,472

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.6841, -97.8992. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.68413, -97.89920 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,284 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,284 ft.

Completions filed
Oct 2003
1 of 1 wells

1 well

42-3553197449,284 ftOct 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (272)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

272 months

May 202621106.413.05$64
Apr 20262298.932.87$63
Mar 20262389.753.15$72
Feb 20262163.503.75$79
Jan 20261759.138.00$136
Dec 20251456.664.41$62
Nov 20252558.593.93$98
Oct 20252259.383.30$73
Sep 20252662.743.08$80
Aug 20252163.933.01$63
Jul 202543466.743.32$1,439
Jun 20252466.483.13$75
May 20253160.553.23$100
Apr 20253362.363.54$117
Mar 20255967.704.27$252
Feb 20256470.884.34$278
Jan 20257274.324.28$308
Dec 20247468.993.12$231
Nov 20247069.052.20$154
Oct 20247771.372.28$176
Sep 20247069.612.36$166
Aug 20247875.632.06$161
Jul 20247979.932.15$170
Jun 20247878.082.63$205
May 20248278.812.20$180
Apr 20249484.451.66$156
Mar 20249780.301.55$150
Feb 20248276.091.78$146
Jan 20247873.023.30$257
Dec 20237871.262.61$204
Nov 20237777.892.81$216
Oct 20237885.443.09$241
Sep 20238089.042.74$219
Aug 20238080.522.67$214
Jul 202316174.852.64$425
Jun 2023068.962.26$0
May 2023070.622.23$0
Apr 20234278.122.24$94
Mar 20238972.852.39$213
Feb 20238475.112.47$207
Jan 20237676.533.39$257
Dec 20227376.415.73$418
Nov 20227085.005.65$395
Oct 20227887.185.86$457
Sep 20227584.888.16$612
Aug 20226994.529.13$630
Jul 202293101.587.54$701
Jun 2022112115.097.98$893
May 2022139109.378.43$1,172
Apr 202282104.226.84$561
Mar 2022120108.885.08$609
Feb 202210691.054.86$515
Jan 202213081.844.54$590
Dec 202113671.323.90$530
Nov 202112977.435.24$676
Oct 202112979.795.71$737
Sep 202112869.865.35$685
Aug 202112366.024.22$519
Jul 202111270.783.98$446
Jun 202110469.493.38$352
May 202110063.483.02$302
Apr 202112560.362.76$345
Mar 202110861.302.72$293
Feb 20218657.805.55$477
Jan 20216550.412.81$183
Dec 20206844.642.68$182
Nov 20206638.772.71$179
Oct 20207036.972.48$173
Sep 202011637.091.99$231
Aug 20208739.982.39$208
Jul 20208238.371.83$150
Jun 202011634.901.69$196
May 20206916.921.81$125
Apr 20209914.751.80$179
Mar 202014330.341.86$265
Feb 202016849.881.98$333
Jan 202016857.252.09$352
Dec 2019059.012.30$0
Nov 2019055.302.75$0
Oct 2019053.472.42$0
Sep 201910655.052.66$282
Aug 201911953.112.30$274
Jul 201911656.272.46$285
Jun 201911652.782.49$289
May 201913958.482.74$381
Apr 20197062.632.75$193
Mar 201912456.803.06$380
Feb 201910450.852.79$290
Jan 201911746.033.23$378
Dec 201810846.594.19$452
Nov 201811352.934.24$479
Oct 20188361.443.40$282
Sep 201810259.543.11$317
Aug 201811759.403.07$359
Jul 201816365.142.93$478
Jun 20185360.183.08$163
May 201811565.382.90$334
Apr 201812963.842.90$374
Mar 201810261.222.79$284
Feb 201810861.782.77$299
Jan 201812062.874.01$481
Dec 201710557.272.92$307
Nov 201710755.423.12$334
Oct 20179949.292.98$295
Sep 201711747.523.09$361
Aug 20177945.373.00$237
Jul 201710943.873.09$337
Jun 20178642.493.09$266
May 201711545.373.26$375
Apr 201712047.933.21$385
Mar 201712146.772.98$361
Feb 20171,92450.452.95$5,681
Jan 201711049.413.42$376
Dec 201615148.763.72$562
Nov 201613442.492.64$354
Oct 201612546.193.09$386
Sep 201611641.553.10$360
Aug 201612541.442.92$366
Jul 201611041.622.92$322
Jun 20169745.352.69$261
May 201610042.521.99$199
Apr 20169536.561.99$189
Mar 20169433.011.79$169
Feb 201612126.472.06$250
Jan 201615027.352.36$355
Dec 201518132.362.00$362
Nov 201519138.792.17$414
Oct 201520143.552.43$488
Sep 201514942.992.76$411
Aug 201518240.162.87$523
Jul 201516448.152.95$483
Jun 201515756.152.88$453
May 201517455.212.96$514
Apr 201518049.822.71$487
Mar 201515142.892.93$443
Feb 201512844.662.98$381
Jan 201514543.433.10$450
Dec 201419454.693.59$697
Nov 201418470.464.25$782
Oct 201415578.303.90$605
Sep 201414886.164.05$599
Aug 201415889.394.04$638
Jul 201416996.564.18$706
Jun 201422498.164.74$1,061
May 201414794.734.73$695
Apr 201411695.944.81$558
Mar 201414295.895.06$718
Feb 201412197.406.19$749
Jan 201416290.404.86$787
Dec 201318191.824.35$788
Nov 201317488.853.74$650
Oct 201316397.423.78$616
Sep 201393104.113.72$346
Aug 201382104.253.52$289
Jul 2013118102.523.72$439
Jun 201312394.403.93$484
May 201312494.834.15$514
Apr 201311693.964.28$497
Mar 201312893.623.91$501
Feb 201312891.233.42$438
Jan 201315891.603.42$540
Dec 201216086.773.42$547
Nov 201216186.953.62$584
Oct 201217789.383.40$602
Sep 201217394.672.92$505
Aug 201219192.662.91$555
Jul 201220285.133.02$610
Jun 201217779.822.52$446
May 201219791.612.49$490
Apr 2012201101.652.00$401
Mar 2012215105.052.22$478
Feb 2012211101.102.57$542
Jan 201223298.092.73$634
Dec 201123796.873.24$768
Nov 201122895.723.31$755
Oct 201123584.983.65$857
Sep 201122883.623.99$909
Aug 201121183.404.15$876
Jul 201123894.144.52$1,075
Jun 201118892.904.64$872
May 201126398.134.40$1,158
Apr 2011263105.964.33$1,140
Mar 201127496.364.06$1,112
Feb 201124885.644.18$1,037
Jan 201126886.504.59$1,230
Dec 201026985.734.35$1,170
Nov 201033680.843.80$1,275
Oct 201023478.103.51$821
Sep 201031172.633.98$1,238
Aug 20102,55873.684.42$11,305
Jul 201036172.554.74$1,710
Jun 201036770.364.91$1,802
May 201041071.124.24$1,736
Apr 201042281.694.12$1,740
Mar 201045478.394.39$1,992
Feb 201042773.585.44$2,324
Jan 201051474.365.96$3,066
Dec 200951771.445.48$2,835
Nov 200951974.593.75$1,947
Oct 200954572.544.11$2,240
Sep 2009065.543.06$0
Aug 200957267.423.22$1,841
Jul 200958361.133.46$2,020
Jun 200963866.163.90$2,485
May 200946454.743.93$1,822
Apr 200925046.773.59$897
Mar 200979642.144.06$3,231
Feb 200955432.814.63$2,567
Jan 200954835.865.37$2,943
Dec 200857137.105.98$3,413
Nov 200859555.496.86$4,082
Oct 200865375.246.92$4,520
Sep 2008636101.767.88$5,010
Aug 2008718114.228.48$6,091
Jul 2008747131.0811.39$8,508
Jun 2008743131.3313.03$9,683
May 2008778123.1711.57$9,005
Apr 2008776110.3110.45$8,113
Mar 2008796101.909.66$7,693
Feb 200885092.538.77$7,455
Jan 200863390.388.21$5,194
Dec 200782488.337.30$6,017
Nov 200780391.677.29$5,855
Oct 200782882.856.92$5,731
Sep 200781775.846.24$5,101
Aug 200786969.066.39$5,551
Jul 200788370.906.39$5,641
Jun 200787462.007.55$6,597
May 200791558.747.85$7,179
Apr 200790059.617.81$7,025
Mar 200795656.927.30$6,981
Feb 200788055.108.22$7,230
Jan 20071,01450.306.73$6,821
Dec 20061,12656.656.92$7,790
Nov 20061,16354.207.62$8,859
Oct 20061,23254.906.01$7,409
Sep 2006060.085.04$0
Aug 2006068.717.34$0
Jul 2006069.376.34$0
Jun 2006066.286.38$0
May 2006066.016.42$0
Apr 2006064.397.36$0
Mar 2006056.707.08$0
Feb 2006057.597.75$0
Jan 2006060.598.93$0
Dec 2005054.9413.42$0
Nov 2005054.6910.59$0
Oct 2005058.3413.80$0
Sep 2005061.4512.08$0
Aug 2005061.519.80$0
Jul 2005055.697.84$0
Jun 2005052.337.38$0
May 2005045.226.65$0
Apr 2005049.207.36$0
Mar 2005050.377.15$0
Feb 2005045.226.31$0
Jan 2005043.166.32$0
Dec 200410539.866.75$709
Nov 20049045.286.33$570
Oct 200412149.706.52$788
Sep 200423643.245.28$1,247
Aug 200426042.375.55$1,443
Jul 200425938.286.08$1,576
Jun 200433236.106.43$2,136
May 200436537.486.49$2,371
Apr 200451534.475.86$3,017
Mar 200465034.365.53$3,595
Feb 200493132.455.51$5,129
Jan 20041,14632.036.30$7,219
Dec 200397630.266.30$6,150
Nov 20031,97228.804.60$9,062
Oct 2003028.174.76$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Gas                   21 Mcf  × $  3.05 =        $64

────────────────────────────────────────────────────
Month total                                      $64

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/199275 is the state's own key, not one this site invented.