GARZA, L.

Operated by MOUNTAIN V TEXAS, LLC (P-5 103601) in the GARZA (CONSOLIDATED) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 199535District 04Field 341123502 tax incentive programmesCondensateGasSaveExport
Value, all time
$9.1 M
Jan 2004 – May 2026
Value, last 12 filed months
$62 k
at the published price for each month
Months reported
269
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 22 leases and 22 wells, and the rule below applies to all of them.

Discovered
1997-05-07
as the register files it
Field class
Gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1997-06-27.

The Commission's schedule remark for this field reads: ASSIGNED TWO PART ALLOCATION FORMULA.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112004-11-19157805
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition164 bbl$12,484
GasProduction1,562,295 Mcf$9,039,668
Total$9,052,152

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.0589, -99.0915. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.05886, -99.09152 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,600 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,600 ft.

Completions filed
Jan 2004
1 of 1 wells

1 well

42-505348773011,600 ftJan 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (269)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

269 months

May 202601,103106.413.05$3,360
Apr 202601,16298.932.87$3,335
Mar 202601,40489.753.15$4,422
Feb 202601,31363.503.75$4,924
Jan 202601,37159.138.00$10,965
Dec 2025121,36056.664.41$6,682
Nov 202501,44558.593.93$5,674
Oct 202501,53859.383.30$5,083
Sep 202501,31762.743.08$4,052
Aug 202501,19263.933.01$3,594
Jul 202501,59966.743.32$5,301
Jun 202501,56266.483.13$4,887
May 202501,58760.553.23$5,130
Apr 202501,46862.363.54$5,201
Mar 202501,50367.704.27$6,415
Feb 202501,39170.884.34$6,038
Jan 202501,63474.324.28$6,991
Dec 202401,66568.993.12$5,197
Nov 202401,64669.052.20$3,619
Oct 202401,65271.372.28$3,769
Sep 202401,56969.612.36$3,710
Aug 202401,71075.632.06$3,529
Jul 202401,72479.932.15$3,701
Jun 202401,41178.082.63$3,717
May 202401,51878.812.20$3,337
Apr 202401,54584.451.66$2,563
Mar 202401,41980.301.55$2,193
Feb 202401,19476.091.78$2,130
Jan 202401,51273.023.30$4,986
Dec 202301,67171.262.61$4,363
Nov 202301,69177.892.81$4,748
Oct 202301,69985.443.09$5,245
Sep 202301,47489.042.74$4,031
Aug 202301,19880.522.67$3,202
Jul 202301,92674.852.64$5,088
Jun 202301,89868.962.26$4,287
May 202302,17070.622.23$4,833
Apr 202302,43478.122.24$5,447
Mar 202302,80172.852.39$6,703
Feb 202302,44775.112.47$6,034
Jan 202304,77476.533.39$16,173
Dec 202201,37176.415.73$7,855
Nov 2022079685.005.65$4,494
Oct 202241,07887.185.86$6,670
Sep 202201,08484.888.16$8,849
Aug 202201,09794.529.13$10,012
Jul 202201,073101.587.54$8,093
Jun 202201,085115.097.98$8,655
May 202201,133109.378.43$9,555
Apr 202201,085104.226.84$7,419
Mar 202201,012108.885.08$5,137
Feb 2022089991.054.86$4,368
Jan 202201,01181.844.54$4,588
Dec 202101,00671.323.90$3,923
Nov 2021094277.435.24$4,933
Oct 202101,06379.795.71$6,074
Sep 202101,26669.865.35$6,774
Aug 202101,04966.024.22$4,427
Jul 202101,09570.783.98$4,360
Jun 202101,12769.493.38$3,810
May 202101,18963.483.02$3,588
Apr 202101,12860.362.76$3,112
Mar 202101,24361.302.72$3,377
Feb 202101,06457.805.55$5,903
Jan 202101,10750.412.81$3,111
Dec 202001,28344.642.68$3,433
Nov 202001,29438.772.71$3,502
Oct 202001,82736.972.48$4,528
Sep 2020093737.091.99$1,866
Aug 202001,38639.982.39$3,306
Jul 202001,43638.371.83$2,621
Jun 202001,40134.901.69$2,368
May 202001,46816.921.81$2,664
Apr 202001,41914.751.80$2,560
Mar 202001,39530.341.86$2,589
Feb 202001,45849.881.98$2,888
Jan 202001,56257.252.09$3,272
Dec 201901,54959.012.30$3,569
Nov 201901,53455.302.75$4,220
Oct 201901,58753.472.42$3,838
Sep 201901,57655.052.66$4,188
Aug 2019071153.112.30$1,638
Jul 201901,33556.272.46$3,284
Jun 201901,11952.782.49$2,788
May 201901,69758.482.74$4,650
Apr 201901,00162.632.75$2,753
Mar 201901,74656.803.06$5,346
Feb 201901,52850.852.79$4,267
Jan 201901,86146.033.23$6,008
Dec 201801,19046.594.19$4,981
Nov 201801,87352.934.24$7,936
Oct 201806461.443.40$217
Sep 2018015459.543.11$479
Aug 201801,06859.403.07$3,275
Jul 2018098665.142.93$2,891
Jun 201801,92360.183.08$5,917
May 201802,22065.382.90$6,440
Apr 201802,25663.842.90$6,544
Mar 201802,18161.222.79$6,078
Feb 201802,19361.782.77$6,066
Jan 201802,43162.874.01$9,747
Dec 201702,41057.272.92$7,041
Nov 201702,37855.423.12$7,415
Oct 201702,88749.292.98$8,614
Sep 201702,58247.523.09$7,971
Aug 201703,10645.373.00$9,332
Jul 201703,61543.873.09$11,161
Jun 201704,34542.493.09$13,414
May 201703,10945.373.26$10,146
Apr 201702,30347.933.21$7,396
Mar 201702,19446.772.98$6,546
Feb 201702,05650.452.95$6,071
Jan 201702,03649.413.42$6,961
Dec 201602,09848.763.72$7,811
Nov 2016112,27442.492.64$6,481
Oct 201602,55246.193.09$7,886
Sep 201602,15541.553.10$6,682
Aug 201602,33941.442.92$6,840
Jul 201602,72141.622.92$7,957
Jun 201602,79945.352.69$7,518
May 201602,17342.521.99$4,327
Apr 201601,78336.561.99$3,550
Mar 201602,49933.011.79$4,483
Feb 201602,42626.472.06$5,006
Jan 201602,51727.352.36$5,951
Dec 201502,46932.362.00$4,941
Nov 201502,17038.792.17$4,703
Oct 201502,68343.552.43$6,511
Sep 201504,14842.992.76$11,442
Aug 201502,57740.162.87$7,402
Jul 201502,47548.152.95$7,289
Jun 201502,47456.152.88$7,132
May 201502,98055.212.96$8,807
Apr 2015203,20449.822.71$9,668
Mar 201503,28442.892.93$9,638
Feb 201503,14944.662.98$9,372
Jan 201503,37843.433.10$10,474
Dec 201403,48454.693.59$12,512
Nov 201403,50270.464.25$14,890
Oct 201403,62578.303.90$14,141
Sep 201403,67986.164.05$14,883
Aug 2014203,79489.394.04$17,097
Jul 2014113,47196.564.18$15,570
Jun 201403,39798.164.74$16,091
May 201403,64794.734.73$17,238
Apr 201403,93195.944.81$18,905
Mar 201404,40995.895.06$22,295
Feb 201404,28697.406.19$26,539
Jan 201403,63790.404.86$17,678
Dec 201313,69691.824.35$16,186
Nov 201303,67488.853.74$13,734
Oct 201303,73697.423.78$14,120
Sep 201303,530104.113.72$13,124
Aug 2013103,494104.253.52$13,351
Jul 201304,545102.523.72$16,897
Jun 2013193,38494.403.93$15,104
May 201303,18894.834.15$13,227
Apr 201303,50493.964.28$15,006
Mar 201303,75993.623.91$14,708
Feb 201303,52391.233.42$12,048
Jan 201303,11191.603.42$10,639
Dec 201204,02386.773.42$13,759
Nov 201204,35786.953.62$15,794
Oct 201204,46689.383.40$15,183
Sep 201203,97194.672.92$11,589
Aug 201204,45292.662.91$12,947
Jul 201204,51785.133.02$13,645
Jun 201204,79579.822.52$12,079
May 201205,27791.612.49$13,131
Apr 201205,339101.652.00$10,661
Mar 201205,420105.052.22$12,044
Feb 201204,609101.102.57$11,846
Jan 201204,02198.092.73$10,994
Dec 201104,67196.873.24$15,133
Nov 201104,81795.723.31$15,950
Oct 2011155,38684.983.65$20,926
Sep 201105,92983.623.99$23,632
Aug 201103,67183.404.15$15,232
Jul 201103,57294.144.52$16,136
Jun 201103,65192.904.64$16,940
May 201104,57098.134.40$20,130
Apr 201105,542105.964.33$24,015
Mar 201103,10096.364.06$12,578
Feb 201104,52085.644.18$18,894
Jan 201105,00386.504.59$22,958
Dec 201004,98485.734.35$21,669
Nov 201004,85780.843.80$18,434
Oct 201025,11178.103.51$18,090
Sep 201005,19772.633.98$20,681
Aug 201005,34073.684.42$23,599
Jul 2010105,16772.554.74$25,199
Jun 201004,62970.364.91$22,730
May 201064,59171.124.24$19,871
Apr 201014,49781.694.12$18,621
Mar 201004,69778.394.39$20,614
Feb 201004,61473.585.44$25,111
Jan 201005,94374.365.96$35,445
Dec 200946,33271.445.48$35,009
Nov 200905,83874.593.75$21,901
Oct 200906,20572.544.11$25,504
Sep 200906,41465.543.06$19,657
Aug 200906,11167.423.22$19,668
Jul 200907,27361.133.46$25,197
Jun 200908,61466.163.90$33,552
May 200901,92254.743.93$7,545
Apr 200966,29446.773.59$22,860
Mar 200906,50842.144.06$26,416
Feb 200907,45532.814.63$34,539
Jan 200906,64435.865.37$35,685
Dec 200805,60137.105.98$33,478
Nov 200806,31255.496.86$43,303
Oct 200896,70975.246.92$47,117
Sep 200836,229101.767.88$49,372
Aug 200807,328114.228.48$62,164
Jul 200807,456131.0811.39$84,920
Jun 200807,403131.3313.03$96,481
May 200807,588123.1711.57$87,826
Apr 200807,688110.3110.45$80,377
Mar 200808,137101.909.66$78,637
Feb 200808,10592.538.77$71,086
Jan 200808,30290.388.21$68,124
Dec 200708,35588.337.30$61,008
Nov 200707,49791.677.29$54,666
Oct 200708,58682.856.92$59,432
Sep 200708,48275.846.24$52,963
Aug 200709,00369.066.39$57,511
Jul 200709,45570.906.39$60,398
Jun 2007010,21062.007.55$77,070
May 200708,84458.747.85$69,393
Apr 200708,46059.617.81$66,032
Mar 2007010,37056.927.30$75,721
Feb 200709,40055.108.22$77,230
Jan 2007012,00750.306.73$80,769
Dec 200609,70556.656.92$67,143
Nov 200609,02254.207.62$68,725
Oct 2006010,13854.906.01$60,968
Sep 2006010,45860.085.04$52,679
Aug 2006011,74268.717.34$86,185
Jul 2006015,41569.376.34$97,774
Jun 200609,59566.286.38$61,253
May 200609,35566.016.42$60,106
Apr 2006010,77964.397.36$79,339
Mar 2006011,23356.707.08$79,562
Feb 2006011,83857.597.75$91,758
Jan 2006012,51860.598.93$111,827
Dec 2005013,00254.9413.42$174,427
Nov 2005013,41154.6910.59$142,001
Oct 2005013,55958.3413.80$187,057
Sep 2005013,15361.4512.08$158,875
Aug 2005014,11461.519.80$138,273
Jul 2005014,41555.697.84$113,066
Jun 2005014,95152.337.38$110,354
May 2005015,35245.226.65$102,109
Apr 2005015,55949.207.36$114,522
Mar 2005017,59150.377.15$125,861
Feb 2005016,95045.226.31$106,987
Jan 2005027,67443.166.32$174,961
Dec 2004011,08639.866.75$74,842
Nov 2004019,98645.286.33$126,520
Oct 2004022,52049.706.52$146,720
Sep 2004024,33143.245.28$128,563
Aug 2004028,09242.375.55$155,929
Jul 2004028,58238.286.08$173,898
Jun 2004031,43936.106.43$202,248
May 2004038,91837.486.49$252,756
Apr 2004036,49534.475.86$213,805
Mar 2004045,99834.365.53$254,375
Feb 2004072,52032.455.51$399,558
Jan 20040106,65332.036.30$671,876

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                1,103 Mcf  × $  3.05 =     $3,360

────────────────────────────────────────────────────
Month total                                   $3,360

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/199535 is the state's own key, not one this site invented.