Operated by LEWIS PETRO PROPERTIES, INC. (P-5 499978) in the TOM WALSH (OLMOS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 205377District 04Field 906066002 tax incentive programmesCondensateGasSaveExport
Value, all time
$396 k
Aug 2004 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
262
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 290 leases and 291 wells, and the rule below applies to all of them.

Discovered
1970-12-15
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2001-01-09.

The Commission's schedule remark for this field reads: SUSPENSION OF THE ALLOCATION IS STILL IN EFFECT.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-09-27161122
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition207 bbl$10,570
GasProduction53,853 Mcf$385,827
Total$396,397

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.1437, -99.4678. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.14368, -99.46780 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,100 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,100 ft.

Completions filed
Aug 2004
1 of 1 wells

1 well

42-4793881437,100 ftAug 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (262)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

262 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20201039.982.39$40
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150140.162.87$3
Jul 20150148.152.95$3
Jun 20150256.152.88$6
May 20150355.212.96$9
Apr 20150249.822.71$5
Mar 201501042.892.93$29
Feb 201507544.662.98$223
Jan 20150843.433.10$25
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 201401478.303.90$55
Sep 20140686.164.05$24
Aug 201402889.394.04$113
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 201403794.734.73$175
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 201402497.406.19$149
Jan 2014011790.404.86$569
Dec 201309491.824.35$409
Nov 201305088.853.74$187
Oct 20130597.423.78$19
Sep 201325104.113.72$227
Aug 201308104.253.52$28
Jul 201302102.523.72$7
Jun 201301794.403.93$67
May 20130994.834.15$37
Apr 20130593.964.28$21
Mar 20130693.623.91$23
Feb 20130091.233.42$0
Jan 20130391.603.42$10
Dec 20120586.773.42$17
Nov 20124786.953.62$373
Oct 201201089.383.40$34
Sep 201201494.672.92$41
Aug 201202392.662.91$67
Jul 20120085.133.02$0
Jun 20120379.822.52$8
May 20120691.612.49$15
Apr 2012013101.652.00$26
Mar 2012012105.052.22$27
Feb 20121113101.102.57$1,146
Jan 20120298.092.73$5
Dec 20110096.873.24$0
Nov 201102295.723.31$73
Oct 20110684.983.65$22
Sep 20110283.623.99$8
Aug 20110283.404.15$8
Jul 201102194.144.52$95
Jun 20110692.904.64$28
May 201101498.134.40$62
Apr 201108105.964.33$35
Mar 201101896.364.06$73
Feb 201103985.644.18$163
Jan 201103086.504.59$138
Dec 20100785.734.35$30
Nov 201001480.843.80$53
Oct 20100978.103.51$32
Sep 201001472.633.98$56
Aug 201001073.684.42$44
Jul 201002172.554.74$99
Jun 201001970.364.91$93
May 201002271.124.24$93
Apr 201004381.694.12$177
Mar 201001378.394.39$57
Feb 201002373.585.44$125
Jan 201005974.365.96$352
Dec 200907871.445.48$428
Nov 200907974.593.75$296
Oct 200903472.544.11$140
Sep 200902165.543.06$64
Aug 200901067.423.22$32
Jul 20090961.133.46$31
Jun 20090566.163.90$19
May 200903654.743.93$141
Apr 200905546.773.59$197
Mar 20093721142.144.06$2,416
Feb 200905832.814.63$269
Jan 200909135.865.37$489
Dec 200806837.105.98$406
Nov 200807055.496.86$480
Oct 200808175.246.92$561
Sep 2008087101.767.88$685
Aug 2008096114.228.48$814
Jul 20080121131.0811.39$1,378
Jun 20080135131.3313.03$1,759
May 20080163123.1711.57$1,887
Apr 20080196110.3110.45$2,049
Mar 20080220101.909.66$2,126
Feb 2008021892.538.77$1,912
Jan 2008027990.388.21$2,289
Dec 2007030188.337.30$2,198
Nov 2007037991.677.29$2,764
Oct 2007041782.856.92$2,886
Sep 2007041875.846.24$2,610
Aug 2007045869.066.39$2,926
Jul 2007038970.906.39$2,485
Jun 2007043562.007.55$3,284
May 2007046458.747.85$3,641
Apr 2007045159.617.81$3,520
Mar 2007052456.927.30$3,826
Feb 2007047455.108.22$3,894
Jan 2007057150.306.73$3,841
Dec 2006059356.656.92$4,103
Nov 2006060854.207.62$4,631
Oct 20062764854.906.01$5,379
Sep 2006070960.085.04$3,571
Aug 2006070568.717.34$5,175
Jul 2006064869.376.34$4,110
Jun 2006077566.286.38$4,948
May 2006073166.016.42$4,697
Apr 2006071064.397.36$5,226
Mar 2006081056.707.08$5,737
Feb 2006074257.597.75$5,751
Jan 2006087260.598.93$7,790
Dec 2005093054.9413.42$12,476
Nov 200501,00754.6910.59$10,663
Oct 200501,11158.3413.80$15,327
Sep 200501,17961.4512.08$14,241
Aug 200501,33061.519.80$13,030
Jul 200501,42655.697.84$11,185
Jun 200501,48152.337.38$10,931
May 200501,67445.226.65$11,134
Apr 200501,76549.207.36$12,991
Mar 200502,01150.377.15$14,388
Feb 200502,14545.226.31$13,539
Jan 2005602,69343.166.32$19,615
Dec 200403,02739.866.75$20,436
Nov 200403,39545.286.33$21,492
Oct 2004654,24049.706.52$30,855
Sep 200405,43943.245.28$28,739
Aug 200401,68542.375.55$9,353

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2020 — as filed, then multipliedworked
Condensate             1 bbl  × $ 39.98 =        $40
Gas                    0 Mcf  × $  2.39 =         $0

────────────────────────────────────────────────────
Month total                                      $40

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/205377 is the state's own key, not one this site invented.