GARCIA MORSE UNIT

Operated by RIDDLE ENGINEERING CORP. (P-5 710900) in the BLOOMBERG (FRIO 5100) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 215196District 04Field 09646300CondensateGasSave
Value, all time
$551 k
Dec 2005 – Jun 2009
Value, last 12 filed months
$21 k
at the published price for each month
Months reported
43
no gaps in the span
Streams
2
condensate, gas

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition493 bbl$32,350
GasProduction67,468 Mcf$518,803
Total$551,154

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 26.3699, -98.5252. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

26.36989, -98.52518 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
5,770 ft
1 wells filed one
Completion to plug
18 months
median over 1 wells

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,770 ft.

Completions filed
Apr 2009
1 of 1 wells
Plug dates filed
Oct 2010
1 of 1 wells

Last completion to plug: a median of 18 months across the 1 well that filed both dates, with the middle half between 18 months and 18 months. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2153323315,770 ftApr 2009Oct 2010Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (43)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

43 months

Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 200959046.773.59$2,759
Mar 20090042.144.06$0
Feb 20090432.814.63$19
Jan 2009033035.865.37$1,772
Dec 2008057837.105.98$3,455
Nov 2008011555.496.86$789
Oct 2008033375.246.92$2,305
Sep 20080318101.767.88$2,505
Aug 20080325114.228.48$2,757
Jul 20080423131.0811.39$4,818
Jun 20080543131.3313.03$7,077
May 20080588123.1711.57$6,806
Apr 20080717110.3110.45$7,496
Mar 20080879101.909.66$8,495
Feb 2008081092.538.77$7,104
Jan 2008076490.388.21$6,269
Dec 2007077888.337.30$5,681
Nov 2007075691.677.29$5,513
Oct 200713082482.856.92$16,474
Sep 2007066775.846.24$4,165
Aug 2007095169.066.39$6,075
Jul 200701,06770.906.39$6,816
Jun 200701,10962.007.55$8,371
May 200701,18858.747.85$9,321
Apr 200701,11659.617.81$8,711
Mar 200701,32156.927.30$9,646
Feb 200701,21555.108.22$9,982
Jan 200701,42550.306.73$9,586
Dec 200601,38456.656.92$9,575
Nov 200601,61654.207.62$12,310
Oct 200601,87554.906.01$11,276
Sep 200601,95560.085.04$9,848
Aug 200602,64368.717.34$19,399
Jul 20061252,76769.376.34$26,222
Jun 200603,18266.286.38$20,314
May 200603,79566.016.42$24,383
Apr 200604,47964.397.36$32,968
Mar 20061795,88656.707.08$51,839
Feb 200607,29357.597.75$56,529
Jan 200609,34160.598.93$83,446
Dec 200502,10854.9413.42$28,280

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2009 — as filed, then multipliedworked
Condensate            59 bbl  × $ 46.77 =     $2,759
Gas                    0 Mcf  × $  3.59 =         $0

────────────────────────────────────────────────────
Month total                                   $2,759

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/215196 is the state's own key, not one this site invented.