ARRIAGA GU "F"

Operated by MERIT ENERGY COMPANY (P-5 561136) in the BOB WEST (L-1-4) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 216172District 04Field 100411382 tax incentive programmesGasSaveExport
Value, all time
$649 k
Jan 2006 – May 2026
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
245
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 20 leases and 20 wells, and the rule below applies to all of them.

Discovered
1995-11-14
as the register files it
Field class
Gas
the register's own label
Between wells
0 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2008-04-24.

The Commission's schedule remark for this field reads: REMAIN SUSPENDED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112010-12-28199535
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction103,288 Mcf$648,743
Total$648,743

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 26.5880, -99.1551. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

26.58799, -99.15510 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
12,940 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,940 ft.

Completions filed
Jun 2006
1 of 1 wells

1 well

42-42732807212,940 ftJun 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (245)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

245 months

May 2026173106.413.05$527
Apr 20268798.932.87$250
Mar 20263589.753.15$110
Feb 202617563.503.75$656
Jan 20265259.138.00$416
Dec 202516356.664.41$719
Nov 20254558.593.93$177
Oct 20253759.383.30$122
Sep 202518262.743.08$560
Aug 20256363.933.01$190
Jul 20259066.743.32$298
Jun 20259766.483.13$303
May 20256760.553.23$217
Apr 20259562.363.54$337
Mar 20259267.704.27$393
Feb 202511670.884.34$504
Jan 20258174.324.28$347
Dec 202415568.993.12$484
Nov 202418369.052.20$402
Oct 202418771.372.28$427
Sep 20249669.612.36$227
Aug 202419375.632.06$398
Jul 20247079.932.15$150
Jun 202423678.082.63$622
May 202462878.812.20$1,381
Apr 2024084.451.66$0
Mar 2024080.301.55$0
Feb 2024076.091.78$0
Jan 2024073.023.30$0
Dec 2023071.262.61$0
Nov 2023077.892.81$0
Oct 2023085.443.09$0
Sep 2023089.042.74$0
Aug 2023080.522.67$0
Jul 2023074.852.64$0
Jun 2023068.962.26$0
May 2023070.622.23$0
Apr 2023078.122.24$0
Mar 2023072.852.39$0
Feb 2023075.112.47$0
Jan 2023076.533.39$0
Dec 2022076.415.73$0
Nov 2022085.005.65$0
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0
Jul 20220101.587.54$0
Jun 20220115.097.98$0
May 20220109.378.43$0
Apr 20220104.226.84$0
Mar 202252108.885.08$264
Feb 20224191.054.86$199
Jan 20223181.844.54$141
Dec 20218571.323.90$331
Nov 20217977.435.24$414
Oct 20214879.795.71$274
Sep 20215969.865.35$316
Aug 20218666.024.22$363
Jul 20216370.783.98$251
Jun 20214769.493.38$159
May 202110763.483.02$323
Apr 20217860.362.76$215
Mar 20217661.302.72$206
Feb 20215857.805.55$322
Jan 20218650.412.81$242
Dec 20207044.642.68$187
Nov 20207138.772.71$192
Oct 202010536.972.48$260
Sep 202010137.091.99$201
Aug 20207239.982.39$172
Jul 20209238.371.83$168
Jun 20208534.901.69$144
May 202010416.921.81$189
Apr 202010914.751.80$197
Mar 20209930.341.86$184
Feb 20206349.881.98$125
Jan 20208057.252.09$168
Dec 20198859.012.30$203
Nov 20195755.302.75$157
Oct 20198553.472.42$206
Sep 201911655.052.66$308
Aug 201920553.112.30$472
Jul 20195456.272.46$133
Jun 20194552.782.49$112
May 20198258.482.74$225
Apr 20196462.632.75$176
Mar 20198956.803.06$273
Feb 20196850.852.79$190
Jan 20198646.033.23$278
Dec 201810446.594.19$435
Nov 201814052.934.24$593
Oct 201812761.443.40$432
Sep 201810659.543.11$329
Aug 201811759.403.07$359
Jul 20189465.142.93$276
Jun 201810660.183.08$326
May 201812465.382.90$360
Apr 201811563.842.90$334
Mar 201810161.222.79$281
Feb 20189861.782.77$271
Jan 201810162.874.01$405
Dec 201710657.272.92$310
Nov 201711555.423.12$359
Oct 201713249.292.98$394
Sep 201712347.523.09$380
Aug 201715345.373.00$460
Jul 201710843.873.09$333
Jun 201712542.493.09$386
May 201712445.373.26$405
Apr 201714747.933.21$472
Mar 201714546.772.98$433
Feb 201712550.452.95$369
Jan 201712349.413.42$421
Dec 201613448.763.72$499
Nov 201613142.492.64$346
Oct 201614546.193.09$448
Sep 201612141.553.10$375
Aug 201613541.442.92$395
Jul 201615441.622.92$450
Jun 201612245.352.69$328
May 201614342.521.99$285
Apr 201614736.561.99$293
Mar 20168933.011.79$160
Feb 20167726.472.06$159
Jan 201612227.352.36$288
Dec 20158332.362.00$166
Nov 201512138.792.17$262
Oct 201511443.552.43$277
Sep 201512642.992.76$348
Aug 20153640.162.87$103
Jul 201512648.152.95$371
Jun 20159856.152.88$283
May 20155055.212.96$148
Apr 20158349.822.71$225
Mar 20156742.892.93$197
Feb 20158644.662.98$256
Jan 201511643.433.10$360
Dec 20149754.693.59$348
Nov 201414670.464.25$621
Oct 201415978.303.90$620
Sep 201414986.164.05$603
Aug 201413689.394.04$549
Jul 20147596.564.18$313
Jun 201415598.164.74$734
May 201423294.734.73$1,097
Apr 20148695.944.81$414
Mar 201418095.895.06$910
Feb 201412597.406.19$774
Jan 201413990.404.86$676
Dec 201310091.824.35$435
Nov 201314988.853.74$557
Oct 20139397.423.78$351
Sep 2013108104.113.72$402
Aug 2013176104.253.52$620
Jul 2013181102.523.72$673
Jun 201317494.403.93$684
May 201321494.834.15$888
Apr 201316993.964.28$724
Mar 201313793.623.91$536
Feb 201311691.233.42$397
Jan 201313191.603.42$448
Dec 201213886.773.42$472
Nov 201213986.953.62$504
Oct 201213989.383.40$473
Sep 201212594.672.92$365
Aug 201215192.662.91$439
Jul 201215985.133.02$480
Jun 201221079.822.52$529
May 201236791.612.49$913
Apr 20120101.652.00$0
Mar 201261105.052.22$136
Feb 2012122101.102.57$314
Jan 201217998.092.73$489
Dec 201116196.873.24$522
Nov 201110495.723.31$344
Oct 201115284.983.65$555
Sep 201123183.623.99$921
Aug 201119683.404.15$813
Jul 201123494.144.52$1,057
Jun 201122292.904.64$1,030
May 201133198.134.40$1,458
Apr 2011334105.964.33$1,447
Mar 201122696.364.06$917
Feb 201125485.644.18$1,062
Jan 201135886.504.59$1,643
Dec 201039085.734.35$1,696
Nov 201039480.843.80$1,495
Oct 201029778.103.51$1,042
Sep 201035172.633.98$1,397
Aug 201040273.684.42$1,777
Jul 201028172.554.74$1,331
Jun 201020270.364.91$992
May 201030671.124.24$1,296
Apr 201038881.694.12$1,600
Mar 201057778.394.39$2,532
Feb 2010273.585.44$11
Jan 201050274.365.96$2,994
Dec 200938971.445.48$2,133
Nov 20092674.593.75$98
Oct 200942672.544.11$1,751
Sep 200930065.543.06$919
Aug 200961667.423.22$1,983
Jul 200910061.133.46$346
Jun 200929566.163.90$1,149
May 200933954.743.93$1,331
Apr 200931146.773.59$1,116
Mar 200979042.144.06$3,207
Feb 2009132.814.63$5
Jan 200977235.865.37$4,146
Dec 20087937.105.98$472
Nov 20081,12155.496.86$7,690
Oct 20081475.246.92$97
Sep 200818101.767.88$142
Aug 2008351114.228.48$2,978
Jul 2008397131.0811.39$4,522
Jun 2008651131.3313.03$8,484
May 2008685123.1711.57$7,928
Apr 2008407110.3110.45$4,255
Mar 2008235101.909.66$2,271
Feb 2008092.538.77$0
Jan 200851190.388.21$4,193
Dec 20071,21088.337.30$8,835
Nov 20071,26391.677.29$9,209
Oct 20071,11682.856.92$7,725
Sep 200711275.846.24$699
Aug 20071,30069.066.39$8,304
Jul 20071,26170.906.39$8,055
Jun 20073762.007.55$279
May 200785358.747.85$6,693
Apr 20071,11559.617.81$8,703
Mar 20071,08256.927.30$7,901
Feb 20071,27655.108.22$10,484
Jan 20071,15950.306.73$7,796
Dec 20061,63156.656.92$11,284
Nov 20061,80454.207.62$13,742
Oct 200644854.906.01$2,694
Sep 200678960.085.04$3,974
Aug 20063,03168.717.34$22,247
Jul 20064,31769.376.34$27,382
Jun 20064,63166.286.38$29,564
May 20065,64366.016.42$36,256
Apr 20067,83764.397.36$57,684
Mar 200610,89156.707.08$77,140
Feb 200617,56757.597.75$136,164
Jan 2006060.598.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Gas                  173 Mcf  × $  3.05 =       $527

────────────────────────────────────────────────────
Month total                                     $527

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/216172 is the state's own key, not one this site invented.