GATES 05S

Operated by ROSETTA RESOURCES OPERATING LP (P-5 728883) in the GOLD RIVER, NORTH (OLMOS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 216835District 04Field 355665002 tax incentive programmesCondensateGasSaveExport
Value, all time
$601 k
Feb 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
244
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 830 leases and 840 wells, and the rule below applies to all of them.

Discovered
1978-10-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2005-10-25.

The Commission's schedule remark for this field reads: REMAIN SUSPENDED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-10-02169489
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition23 bbl$1,209
GasProduction95,258 Mcf$599,765
Total$600,974

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.0915, -99.7372. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.09146, -99.73719 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
5,900 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 5,900 ft.

Completions filed
Feb 2006
1 of 1 wells

1 well

42-4793934950165,900 ftFeb 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (244)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

244 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20163026.472.06$79
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130588.853.74$19
Oct 2013022097.423.78$831
Sep 20130587104.113.72$2,182
Aug 20130441104.253.52$1,553
Jul 20130164102.523.72$610
Jun 2013012794.403.93$500
May 2013023194.834.15$958
Apr 2013016993.964.28$724
Mar 2013023393.623.91$912
Feb 2013036291.233.42$1,238
Jan 2013035391.603.42$1,207
Dec 2012030586.773.42$1,043
Nov 2012032486.953.62$1,174
Oct 2012039789.383.40$1,350
Sep 2012012094.672.92$350
Aug 2012012992.662.91$375
Jul 2012113785.133.02$499
Jun 2012010479.822.52$262
May 2012010891.612.49$269
Apr 2012091101.652.00$182
Mar 20120110105.052.22$244
Feb 20121268101.102.57$790
Jan 2012023398.092.73$637
Dec 2011035996.873.24$1,163
Nov 2011028495.723.31$940
Oct 2011019484.983.65$708
Sep 2011013583.623.99$538
Aug 2011028983.404.15$1,199
Jul 2011026694.144.52$1,202
Jun 2011035892.904.64$1,661
May 2011137798.134.40$1,759
Apr 20110414105.964.33$1,794
Mar 2011048196.364.06$1,952
Feb 2011042585.644.18$1,776
Jan 2011047186.504.59$2,161
Dec 2010050485.734.35$2,191
Nov 2010050980.843.80$1,932
Oct 2010047378.103.51$1,660
Sep 2010055572.633.98$2,209
Aug 2010079073.684.42$3,491
Jul 2010082272.554.74$3,893
Jun 201001,61570.364.91$7,930
May 2010087571.124.24$3,706
Apr 2010067581.694.12$2,783
Mar 2010071978.394.39$3,155
Feb 2010060773.585.44$3,304
Jan 2010057374.365.96$3,417
Dec 2009057371.445.48$3,142
Nov 2009074874.593.75$2,806
Oct 2009072872.544.11$2,992
Sep 2009090765.543.06$2,780
Aug 2009055267.423.22$1,777
Jul 2009097661.133.46$3,381
Jun 200901,07166.163.90$4,172
May 2009083454.743.93$3,274
Apr 2009372146.773.59$2,727
Mar 2009474342.144.06$3,184
Feb 200901,00132.814.63$4,638
Jan 200901,21335.865.37$6,515
Dec 200811,04637.105.98$6,289
Nov 200891,18455.496.86$8,622
Oct 200801,32075.246.92$9,137
Sep 200801,413101.767.88$11,130
Aug 200801,181114.228.48$10,018
Jul 20080920131.0811.39$10,478
Jun 20080375131.3313.03$4,887
May 20080745123.1711.57$8,623
Apr 20080756110.3110.45$7,904
Mar 20080666101.909.66$6,436
Feb 2008083992.538.77$7,359
Jan 2008081790.388.21$6,704
Dec 2007096588.337.30$7,046
Nov 2007092091.677.29$6,708
Oct 2007081582.856.92$5,641
Sep 200701,07975.846.24$6,737
Aug 2007073069.066.39$4,663
Jul 200701,31270.906.39$8,381
Jun 200701,75962.007.55$13,278
May 200701,66258.747.85$13,041
Apr 200701,77059.617.81$13,815
Mar 200702,07556.927.30$15,152
Feb 200701,48655.108.22$12,209
Jan 200703,61650.306.73$24,324
Dec 200602,07256.656.92$14,335
Nov 200601,53754.207.62$11,708
Oct 200601,86354.906.01$11,204
Sep 200602,73960.085.04$13,797
Aug 200603,32068.717.34$24,369
Jul 200602,90569.376.34$18,426
Jun 200604,87766.286.38$31,134
May 200603,93866.016.42$25,302
Apr 200604,41364.397.36$32,482
Mar 200606,67656.707.08$47,286
Feb 200603,41257.597.75$26,447

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2016 — as filed, then multipliedworked
Condensate             3 bbl  × $ 26.47 =        $79
Gas                    0 Mcf  × $  2.06 =         $0

────────────────────────────────────────────────────
Month total                                      $79

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/216835 is the state's own key, not one this site invented.