Operated by HILCORP ENERGY COMPANY (P-5 386310) in the MUNOZ (LOBO) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 217997District 04Field 638365002 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.7 M
Jan 2006 – May 2026
Value, last 12 filed months
$13 k
at the published price for each month
Months reported
245
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 191 leases and 191 wells, and the rule below applies to all of them.

Discovered
1985-11-01
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2008-04-24.

The Commission's schedule remark for this field reads: PER DOCKET #04-0255143 RULE ONE AMENDED. STANDARD 40 ACRES

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-09-25167721
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition25 bbl$1,470
GasProduction280,708 Mcf$1,658,227
Total$1,659,697

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 26.9755, -99.1864. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

26.97549, -99.18640 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,250 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,250 ft.

Completions filed
Feb 2006
1 of 1 wells

1 well

42-505354471313,250 ftFeb 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (245)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

245 months

May 20260321106.413.05$978
Apr 2026034098.932.87$976
Mar 2026039789.753.15$1,250
Feb 2026031763.503.75$1,189
Jan 2026025159.138.00$2,007
Dec 2025031556.664.41$1,390
Nov 2025025458.593.93$997
Oct 2025024659.383.30$813
Sep 2025029362.743.08$902
Aug 2025026263.933.01$790
Jul 2025029766.743.32$985
Jun 2025018766.483.13$585
May 2025027160.553.23$876
Apr 2025023162.363.54$818
Mar 2025022467.704.27$956
Feb 2025018170.884.34$786
Jan 2025015874.324.28$676
Dec 2024017968.993.12$559
Nov 2024017469.052.20$383
Oct 2024023871.372.28$543
Sep 2024019969.612.36$471
Aug 2024023375.632.06$481
Jul 2024025579.932.15$547
Jun 2024025278.082.63$664
May 2024027878.812.20$611
Apr 2024038484.451.66$637
Mar 2024043580.301.55$672
Feb 2024026376.091.78$469
Jan 2024027673.023.30$910
Dec 2023026471.262.61$689
Nov 2023023977.892.81$671
Oct 2023019885.443.09$611
Sep 2023015489.042.74$421
Aug 2023022880.522.67$609
Jul 2023030074.852.64$793
Jun 2023031568.962.26$711
May 2023028870.622.23$641
Apr 2023021678.122.24$483
Mar 2023020972.852.39$500
Feb 2023024275.112.47$597
Jan 2023026876.533.39$908
Dec 2022048476.415.73$2,773
Nov 2022035285.005.65$1,987
Oct 2022028987.185.86$1,695
Sep 2022033884.888.16$2,759
Aug 2022023194.529.13$2,108
Jul 20220219101.587.54$1,652
Jun 20220204115.097.98$1,627
May 20220133109.378.43$1,122
Apr 20220183104.226.84$1,251
Mar 20220170108.885.08$863
Feb 2022017291.054.86$836
Jan 2022019681.844.54$889
Dec 2021020271.323.90$788
Nov 2021021877.435.24$1,142
Oct 2021020679.795.71$1,177
Sep 2021023369.865.35$1,247
Aug 2021023666.024.22$996
Jul 2021022170.783.98$880
Jun 2021022369.493.38$754
May 2021023963.483.02$721
Apr 2021022660.362.76$623
Mar 2021028761.302.72$780
Feb 2021025057.805.55$1,387
Jan 2021027550.412.81$773
Dec 2020030844.642.68$824
Nov 2020030238.772.71$817
Oct 2020034436.972.48$853
Sep 2020027237.091.99$542
Aug 2020029639.982.39$706
Jul 2020033338.371.83$608
Jun 2020029734.901.69$502
May 2020031516.921.81$572
Apr 2020027214.751.80$491
Mar 2020030030.341.86$557
Feb 2020023949.881.98$473
Jan 2020030157.252.09$631
Dec 2019016359.012.30$376
Nov 2019020255.302.75$556
Oct 2019020753.472.42$501
Sep 2019018555.052.66$492
Aug 2019019553.112.30$449
Jul 2019022756.272.46$558
Jun 2019038952.782.49$969
May 2019044858.482.74$1,228
Apr 2019046362.632.75$1,274
Mar 2019048756.803.06$1,491
Feb 2019050650.852.79$1,413
Jan 2019070346.033.23$2,269
Dec 2018081946.594.19$3,428
Nov 2018083052.934.24$3,517
Oct 2018081161.443.40$2,756
Sep 2018089059.543.11$2,766
Aug 2018095059.403.07$2,913
Jul 2018098865.142.93$2,897
Jun 201801,01160.183.08$3,111
May 201801,23665.382.90$3,585
Apr 2018030163.842.90$873
Mar 2018015261.222.79$424
Feb 2018014161.782.77$390
Jan 2018016562.874.01$662
Dec 2017019557.272.92$570
Nov 2017018555.423.12$577
Oct 201706849.292.98$203
Sep 201703547.523.09$108
Aug 2017014445.373.00$433
Jul 201703643.873.09$111
Jun 2017012142.493.09$374
May 20170045.373.26$0
Apr 201705247.933.21$167
Mar 201706046.772.98$179
Feb 201708350.452.95$245
Jan 2017021049.413.42$718
Dec 201601,13748.763.72$4,233
Nov 201601,33142.492.64$3,520
Oct 20160046.193.09$0
Sep 20160841.553.10$25
Aug 20160341.442.92$9
Jul 201604741.622.92$137
Jun 201601145.352.69$30
May 2016039142.521.99$779
Apr 2016054236.561.99$1,079
Mar 2016042233.011.79$757
Feb 2016025626.472.06$528
Jan 2016047927.352.36$1,133
Dec 2015053732.362.00$1,075
Nov 2015055838.792.17$1,209
Oct 2015059743.552.43$1,449
Sep 2015061942.992.76$1,707
Aug 2015079040.162.87$2,269
Jul 201501,01948.152.95$3,001
Jun 2015073856.152.88$2,128
May 2015068355.212.96$2,019
Apr 2015078549.822.71$2,125
Mar 2015074442.892.93$2,183
Feb 2015062844.662.98$1,869
Jan 2015068843.433.10$2,133
Dec 2014065954.693.59$2,367
Nov 2014065870.464.25$2,798
Oct 2014066078.303.90$2,575
Sep 2014067586.164.05$2,731
Aug 2014073789.394.04$2,974
Jul 2014073296.564.18$3,059
Jun 2014076198.164.74$3,605
May 2014051894.734.73$2,448
Apr 2014045495.944.81$2,183
Mar 2014077495.895.06$3,914
Feb 2014072197.406.19$4,464
Jan 2014081490.404.86$3,957
Dec 201301,39691.824.35$6,079
Nov 2013085688.853.74$3,200
Oct 2013096197.423.78$3,632
Sep 201301,012104.113.72$3,762
Aug 201301,185104.253.52$4,174
Jul 20130377102.523.72$1,402
Jun 2013066194.403.93$2,600
May 2013074194.834.15$3,074
Apr 2013068393.964.28$2,925
Mar 2013085193.623.91$3,330
Feb 2013075091.233.42$2,565
Jan 2013085991.603.42$2,938
Dec 2012088786.773.42$3,034
Nov 2012088686.953.62$3,212
Oct 2012089389.383.40$3,036
Sep 2012090394.672.92$2,635
Aug 2012096992.662.91$2,818
Jul 2012062785.133.02$1,894
Jun 2012091779.822.52$2,310
May 2012089991.612.49$2,237
Apr 20120916101.652.00$1,829
Mar 20120994105.052.22$2,209
Feb 20120921101.102.57$2,367
Jan 2012099098.092.73$2,707
Dec 201101,12296.873.24$3,635
Nov 2011092595.723.31$3,063
Oct 201101,08284.983.65$3,948
Sep 201101,11183.623.99$4,428
Aug 201101,13483.404.15$4,705
Jul 201101,15994.144.52$5,235
Jun 201101,14192.904.64$5,294
May 201101,19398.134.40$5,255
Apr 201101,204105.964.33$5,217
Mar 201101,14896.364.06$4,658
Feb 2011087885.644.18$3,670
Jan 201101,29686.504.59$5,947
Dec 201001,40185.734.35$6,091
Nov 2010071080.843.80$2,695
Oct 2010095978.103.51$3,365
Sep 201001,27272.633.98$5,062
Aug 201001,29573.684.42$5,723
Jul 201001,42172.554.74$6,731
Jun 201001,43870.364.91$7,061
May 201001,67871.124.24$7,107
Apr 2010067881.694.12$2,795
Mar 2010066478.394.39$2,914
Feb 2010046873.585.44$2,547
Jan 2010056474.365.96$3,364
Dec 2009024271.445.48$1,327
Nov 2009013074.593.75$488
Oct 200901,24772.544.11$5,125
Sep 2009032665.543.06$999
Aug 200901,08967.423.22$3,505
Jul 200901,27361.133.46$4,410
Jun 200901,36566.163.90$5,317
May 200901,47754.743.93$5,798
Apr 200901,50546.773.59$5,399
Mar 200901,71642.144.06$6,965
Feb 200901,52132.814.63$7,047
Jan 200901,78335.865.37$9,576
Dec 200801,73037.105.98$10,340
Nov 200801,73255.496.86$11,882
Oct 200801,81975.246.92$12,591
Sep 200801,913101.767.88$15,069
Aug 200802,066114.228.48$17,526
Jul 200802,106131.0811.39$23,986
Jun 200801,902131.3313.03$24,788
May 200801,944123.1711.57$22,500
Apr 200801,925110.3110.45$20,126
Mar 200801,958101.909.66$18,922
Feb 200801,80792.538.77$15,848
Jan 200802,01690.388.21$16,543
Dec 200702,03488.337.30$14,852
Nov 200702,00391.677.29$14,605
Oct 200702,14282.856.92$14,827
Sep 200702,13675.846.24$13,338
Aug 200702,21969.066.39$14,175
Jul 200702,43670.906.39$15,561
Jun 200702,49362.007.55$18,818
May 200702,71358.747.85$21,287
Apr 200712,73759.617.81$21,422
Mar 200703,03956.927.30$22,191
Feb 200702,86955.108.22$23,572
Jan 200703,33050.306.73$22,400
Dec 200623,65656.656.92$25,407
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 200604,38460.085.04$22,083
Aug 200604,85368.717.34$35,621
Jul 200605,61069.376.34$35,583
Jun 200626,48266.286.38$41,513
May 200628,21266.016.42$52,894
Apr 200609,91364.397.36$72,964
Mar 2006519,06156.707.08$135,291
Feb 20061347,94657.597.75$372,384
Jan 200601,94160.598.93$17,340

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  321 Mcf  × $  3.05 =       $978

────────────────────────────────────────────────────
Month total                                     $978

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/217997 is the state's own key, not one this site invented.