BEASLEY WELHAUSEN STATE 105

Operated by LEWIS PETRO PROPERTIES, INC. (P-5 499978) in the LAS TIENDAS (OLMOS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 218297District 04Field 522110602 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.7 M
Feb 2006 – May 2026
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
244
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 754 leases and 754 wells, and the rule below applies to all of them.

Discovered
1974-04-22
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2011-08-23.

The Commission's schedule remark for this field reads: REMAINS SUSPENDED. FIELD REMAINS SET TO MANUAL REVIEW.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-10-02170048
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition49 bbl$3,490
GasProduction265,014 Mcf$1,657,860
Total$1,661,350

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.9137, -99.6612. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.91368, -99.66121 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,000 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,000 ft.

Completions filed
Feb 2006
1 of 1 wells

1 well

42-47939384297,000 ftFeb 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (244)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

244 months

May 20260160106.413.05$487
Apr 20260398.932.87$9
Mar 202606689.753.15$208
Feb 202607663.503.75$285
Jan 202609659.138.00$768
Dec 2025012856.664.41$565
Nov 2025016358.593.93$640
Oct 2025019959.383.30$658
Sep 202507562.743.08$231
Aug 202503463.933.01$103
Jul 202508066.743.32$265
Jun 202502366.483.13$72
May 2025010460.553.23$336
Apr 2025027862.363.54$985
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240778.812.20$15
Apr 20240084.451.66$0
Mar 20240880.301.55$12
Feb 202406476.091.78$114
Jan 202405273.023.30$171
Dec 202307871.262.61$204
Nov 202308877.892.81$247
Oct 202309285.443.09$284
Sep 2023013689.042.74$372
Aug 2023021880.522.67$583
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230170.622.23$2
Apr 202306378.122.24$141
Mar 2023012372.852.39$294
Feb 2023011075.112.47$271
Jan 2023012076.533.39$407
Dec 2022010076.415.73$573
Nov 2022023485.005.65$1,321
Oct 2022022787.185.86$1,331
Sep 2022021784.888.16$1,772
Aug 2022017894.529.13$1,625
Jul 20220191101.587.54$1,441
Jun 20220168115.097.98$1,340
May 20220132109.378.43$1,113
Apr 20220118104.226.84$807
Mar 20220151108.885.08$767
Feb 2022019691.054.86$952
Jan 202206381.844.54$286
Dec 2021011771.323.90$456
Nov 2021015977.435.24$833
Oct 2021012179.795.71$691
Sep 2021013769.865.35$733
Aug 2021015166.024.22$637
Jul 2021015570.783.98$617
Jun 2021011769.493.38$396
May 2021014063.483.02$422
Apr 2021012760.362.76$350
Mar 2021016861.302.72$456
Feb 2021015757.805.55$871
Jan 2021019750.412.81$554
Dec 2020025844.642.68$690
Nov 2020022638.772.71$612
Oct 2020022036.972.48$545
Sep 2020021137.091.99$420
Aug 2020030439.982.39$725
Jul 2020031438.371.83$573
Jun 2020022634.901.69$382
May 2020023616.921.81$428
Apr 2020015914.751.80$287
Mar 2020013330.341.86$247
Feb 2020017049.881.98$337
Jan 2020014857.252.09$310
Dec 2019019459.012.30$447
Nov 2019021255.302.75$583
Oct 2019026553.472.42$641
Sep 2019020555.052.66$545
Aug 2019017253.112.30$396
Jul 2019019356.272.46$475
Jun 2019019352.782.49$481
May 2019016558.482.74$452
Apr 2019015562.632.75$426
Mar 2019017356.803.06$530
Feb 2019016350.852.79$455
Jan 2019019246.033.23$620
Dec 2018019246.594.19$804
Nov 2018018552.934.24$784
Oct 2018020061.443.40$680
Sep 2018020959.543.11$650
Aug 2018030559.403.07$935
Jul 2018010665.142.93$311
Jun 2018014160.183.08$434
May 2018013465.382.90$389
Apr 2018020363.842.90$589
Mar 2018021261.222.79$591
Feb 2018018161.782.77$501
Jan 2018024162.874.01$966
Dec 2017015457.272.92$450
Nov 2017020355.423.12$633
Oct 2017021949.292.98$653
Sep 2017024847.523.09$766
Aug 2017025445.373.00$763
Jul 2017024143.873.09$744
Jun 2017027542.493.09$849
May 2017023345.373.26$760
Apr 2017025547.933.21$819
Mar 2017022446.772.98$668
Feb 2017023350.452.95$688
Jan 2017027049.413.42$923
Dec 2016020848.763.72$774
Nov 2016025042.492.64$661
Oct 2016014546.193.09$448
Sep 2016013641.553.10$422
Aug 2016029141.442.92$851
Jul 2016028141.622.92$822
Jun 2016026945.352.69$722
May 2016028842.521.99$573
Apr 2016028436.561.99$565
Mar 2016028433.011.79$510
Feb 2016026226.472.06$541
Jan 2016028127.352.36$664
Dec 2015028832.362.00$576
Nov 2015027038.792.17$585
Oct 2015026943.552.43$653
Sep 2015028542.992.76$786
Aug 2015025540.162.87$732
Jul 2015032048.152.95$942
Jun 2015023056.152.88$663
May 2015024455.212.96$721
Apr 2015027149.822.71$733
Mar 2015034942.892.93$1,024
Feb 2015031044.662.98$923
Jan 2015036243.433.10$1,122
Dec 2014024154.693.59$866
Nov 2014033070.464.25$1,403
Oct 2014037778.303.90$1,471
Sep 2014036286.164.05$1,464
Aug 2014041189.394.04$1,658
Jul 2014041496.564.18$1,730
Jun 2014044598.164.74$2,108
May 2014039394.734.73$1,858
Apr 2014042395.944.81$2,034
Mar 2014037295.895.06$1,881
Feb 2014040197.406.19$2,483
Jan 2014037690.404.86$1,828
Dec 2013043291.824.35$1,881
Nov 2013050488.853.74$1,884
Oct 2013050697.423.78$1,912
Sep 20130526104.113.72$1,956
Aug 20130505104.253.52$1,779
Jul 20130574102.523.72$2,134
Jun 2013055394.403.93$2,175
May 2013055294.834.15$2,290
Apr 2013051193.964.28$2,188
Mar 2013054893.623.91$2,144
Feb 2013048191.233.42$1,645
Jan 2013050991.603.42$1,741
Dec 2012055186.773.42$1,885
Nov 2012052786.953.62$1,910
Oct 2012056489.383.40$1,917
Sep 2012057594.672.92$1,678
Aug 2012059392.662.91$1,725
Jul 2012051085.133.02$1,541
Jun 2012057279.822.52$1,441
May 2012066091.612.49$1,642
Apr 20120767101.652.00$1,532
Mar 20120854105.052.22$1,898
Feb 20120790101.102.57$2,030
Jan 2012784098.092.73$2,983
Dec 2011074896.873.24$2,423
Nov 2011081295.723.31$2,689
Oct 2011073484.983.65$2,678
Sep 2011024983.623.99$992
Aug 201101,00283.404.15$4,158
Jul 201108594.144.52$384
Jun 2011025392.904.64$1,174
May 2011081498.134.40$3,586
Apr 20110825105.964.33$3,575
Mar 2011083196.364.06$3,372
Feb 2011076185.644.18$3,181
Jan 2011092286.504.59$4,231
Dec 2010099785.734.35$4,335
Nov 2010087780.843.80$3,329
Oct 2010096578.103.51$3,386
Sep 2010095772.633.98$3,808
Aug 2010051873.684.42$2,289
Jul 2010095272.554.74$4,509
Jun 201001,02370.364.91$5,023
May 201001,12071.124.24$4,743
Apr 201001,06681.694.12$4,395
Mar 201001,12478.394.39$4,933
Feb 201001,00773.585.44$5,480
Jan 201001,17274.365.96$6,990
Dec 200901,19071.445.48$6,526
Nov 200901,19574.593.75$4,483
Oct 200901,29172.544.11$5,306
Sep 200901,31165.543.06$4,018
Aug 200901,35267.423.22$4,351
Jul 200901,37161.133.46$4,750
Jun 200901,37466.163.90$5,352
May 200901,45554.743.93$5,712
Apr 200901,43446.773.59$5,144
Mar 200901,51342.144.06$6,141
Feb 200901,46632.814.63$6,792
Jan 200901,66435.865.37$8,937
Dec 200801,72237.105.98$10,293
Nov 200801,73655.496.86$11,910
Oct 200801,83475.246.92$12,695
Sep 200801,901101.767.88$14,974
Aug 200802,034114.228.48$17,254
Jul 200802,220131.0811.39$25,285
Jun 200802,332131.3313.03$30,392
May 200802,564123.1711.57$29,676
Apr 200802,493110.3110.45$26,064
Mar 200852,675101.909.66$26,361
Feb 200802,61392.538.77$22,918
Jan 200802,94590.388.21$24,166
Dec 200703,10388.337.30$22,658
Nov 200703,16491.677.29$23,071
Oct 200703,54482.856.92$24,532
Sep 200703,75875.846.24$23,466
Aug 200703,75969.066.39$24,012
Jul 200703,29770.906.39$21,061
Jun 2007373,48262.007.55$28,578
May 200703,78358.747.85$29,682
Apr 200703,93559.617.81$30,713
Mar 200704,47656.927.30$32,684
Feb 200704,20555.108.22$34,548
Jan 200705,08350.306.73$34,193
Dec 200605,54556.656.92$38,363
Nov 200606,03554.207.62$45,971
Oct 200607,02054.906.01$42,217
Sep 200606,65160.085.04$33,502
Aug 200607,88668.717.34$57,883
Jul 200609,66369.376.34$61,290
Jun 2006010,58866.286.38$67,593
May 2006012,48966.016.42$80,242
Apr 2006014,61264.397.36$107,551
Mar 2006018,79756.707.08$133,138
Feb 2006015,28857.597.75$118,499

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  160 Mcf  × $  3.05 =       $487

────────────────────────────────────────────────────
Month total                                     $487

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/218297 is the state's own key, not one this site invented.