AUSTIN D

Operated by HAMMAN OIL & REFINING COMPANY (P-5 350200) in the EL DRAGON (COOK MTN) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 219638District 04Field 27960075CondensateGasSaveExport
Value, all time
$2.5 M
Apr 2006 – Jun 2013
Value, last 12 filed months
$10 k
at the published price for each month
Months reported
87
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 9 leases and 9 wells, and the rule below applies to all of them.

Discovered
2000-10-24
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 03/01/2006.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,549 bbl$176,954
GasProduction345,739 Mcf$2,294,058
Total$2,471,013

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.1918, -98.6675. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.19185, -98.66748 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,852 ft
1 wells filed one
Completion to plug
6.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,852 ft.

Completions filed
Apr 2006
1 of 1 wells
Plug dates filed
Jan 2013
1 of 1 wells

Last completion to plug: a median of 6.8 years across the 1 well that filed both dates, with the middle half between 6.8 years and 6.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-24732340116,852 ftApr 2006Jan 2013Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (87)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

87 months

Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 2013100093.623.91$9,362
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 201209085.133.02$272
Jun 2012084879.822.52$2,136
May 201201,52291.612.49$3,787
Apr 20120396101.652.00$791
Mar 20120456105.052.22$1,013
Feb 20121942101.102.57$2,522
Jan 2012098698.092.73$2,696
Dec 201101,26496.873.24$4,095
Nov 2011049495.723.31$1,636
Oct 201101,57784.983.65$5,754
Sep 201101,13683.623.99$4,528
Aug 2011096983.404.15$4,021
Jul 2011021594.144.52$971
Jun 201101,10192.904.64$5,109
May 2011084298.134.40$3,709
Apr 20110853105.964.33$3,696
Mar 201101,01996.364.06$4,134
Feb 2011081485.644.18$3,403
Jan 201101,52586.504.59$6,998
Dec 2010036885.734.35$1,600
Nov 201001,14780.843.80$4,353
Oct 201001,09478.103.51$3,839
Sep 201001,84272.633.98$7,330
Aug 2010096173.684.42$4,247
Jul 2010079972.554.74$3,784
Jun 201001,04970.364.91$5,151
May 201001,16071.124.24$4,913
Apr 201001,98181.694.12$8,167
Mar 201001,29678.394.39$5,688
Feb 2010088373.585.44$4,806
Jan 201002,01674.365.96$12,024
Dec 200901,55471.445.48$8,522
Nov 200902,20374.593.75$8,265
Oct 200912,29772.544.11$9,514
Sep 200901,50365.543.06$4,606
Aug 2009094267.423.22$3,032
Jul 20091121,90161.133.46$13,433
Jun 200901,90866.163.90$7,432
May 200901,75254.743.93$6,878
Apr 200902,03946.773.59$7,315
Mar 2009048542.144.06$1,969
Feb 200901,56632.814.63$7,255
Jan 200911,74635.865.37$9,414
Dec 200802,70837.105.98$16,186
Nov 200801,76855.496.86$12,129
Oct 200802,55075.246.92$17,651
Sep 200801,750101.767.88$13,785
Aug 200802,812114.228.48$23,854
Jul 200802,130131.0811.39$24,259
Jun 20081782,899131.3313.03$61,158
May 200803,168123.1711.57$36,667
Apr 200803,331110.3110.45$34,825
Mar 200803,498101.909.66$33,805
Feb 200803,50792.538.77$30,758
Jan 200803,45990.388.21$28,384
Dec 200703,59288.337.30$26,229
Nov 200704,25191.677.29$30,997
Oct 200704,40082.856.92$30,457
Sep 200704,56075.846.24$28,473
Aug 200705,71169.066.39$36,482
Jul 200706,94470.906.39$44,358
Jun 200706,85062.007.55$51,707
May 200709,53258.747.85$74,791
Apr 200707,81159.617.81$60,966
Mar 20071847,15456.927.30$62,712
Feb 20071827,78455.108.22$73,982
Jan 200708,74050.306.73$58,793
Dec 200613610,54056.656.92$80,625
Nov 200609,52554.207.62$72,557
Oct 200615013,15754.906.01$87,359
Sep 2006012,53760.085.04$63,151
Aug 200628316,26768.717.34$138,843
Jul 200618121,02069.376.34$145,881
Jun 200627327,32266.286.38$192,515
May 200676337,25266.016.42$289,710
Apr 2006435,66964.397.36$262,799

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2013 — as filed, then multipliedworked
Condensate           100 bbl  × $ 93.62 =     $9,362
Gas                    0 Mcf  × $  3.91 =         $0

────────────────────────────────────────────────────
Month total                                   $9,362

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/219638 is the state's own key, not one this site invented.