GARNER, TULLY C.

Operated by LEWIS PETRO PROPERTIES, INC. (P-5 499978) in the TOM WALSH (OLMOS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 219917District 04Field 906066002 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.9 M
Jun 2006 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
240
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 290 leases and 291 wells, and the rule below applies to all of them.

Discovered
1970-12-15
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2001-01-09.

The Commission's schedule remark for this field reads: SUSPENSION OF THE ALLOCATION IS STILL IN EFFECT.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-05-22174011
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition465 bbl$29,791
GasProduction319,874 Mcf$1,889,641
Total$1,919,433

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.0817, -99.5243. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.08172, -99.52435 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,199 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,199 ft.

Completions filed
Jun 2006
1 of 1 wells

1 well

42-47939478907,199 ftJun 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (240)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

240 months

May 202606106.413.05$18
Apr 202607798.932.87$221
Mar 202606389.753.15$198
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 2025011956.664.41$525
Nov 20250058.593.93$0
Oct 2025012059.383.30$397
Sep 202508862.743.08$271
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 202509570.884.34$412
Jan 202508874.324.28$377
Dec 202405468.993.12$169
Nov 2024010369.052.20$226
Oct 2024022071.372.28$502
Sep 2024010169.612.36$239
Aug 2024010575.632.06$217
Jul 2024023779.932.15$509
Jun 2024030578.082.63$803
May 202408178.812.20$178
Apr 2024015584.451.66$257
Mar 2024015580.301.55$240
Feb 2024017176.091.78$305
Jan 2024028073.023.30$923
Dec 2023041371.262.61$1,078
Nov 2023045177.892.81$1,266
Oct 2023044485.443.09$1,371
Sep 2023043289.042.74$1,182
Aug 2023056180.522.67$1,499
Jul 2023064574.852.64$1,704
Jun 2023066168.962.26$1,493
May 2023078370.622.23$1,744
Apr 2023068678.122.24$1,535
Mar 2023039172.852.39$936
Feb 2023032275.112.47$794
Jan 2023019676.533.39$664
Dec 2022035476.415.73$2,028
Nov 2022041685.005.65$2,349
Oct 2022055987.185.86$3,278
Sep 2022064784.888.16$5,282
Aug 2022056394.529.13$5,139
Jul 20220775101.587.54$5,845
Jun 20220778115.097.98$6,206
May 20220878109.378.43$7,404
Apr 20220781104.226.84$5,340
Mar 20220555108.885.08$2,817
Feb 2022030191.054.86$1,463
Jan 2022017981.844.54$812
Dec 2021049071.323.90$1,911
Nov 2021045777.435.24$2,393
Oct 2021034079.795.71$1,943
Sep 2021060369.865.35$3,227
Aug 2021056566.024.22$2,385
Jul 2021096170.783.98$3,827
Jun 2021078069.493.38$2,637
May 2021017763.483.02$534
Apr 2021033360.362.76$919
Mar 2021072761.302.72$1,975
Feb 2021093157.805.55$5,165
Jan 202111,06350.412.81$3,038
Dec 202001,03144.642.68$2,758
Nov 202001,11938.772.71$3,029
Oct 202001,19136.972.48$2,952
Sep 202001,37037.091.99$2,728
Aug 202011,62639.982.39$3,918
Jul 202004238.371.83$77
Jun 20202034.901.69$70
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200930.341.86$17
Feb 20200049.881.98$0
Jan 202007357.252.09$153
Dec 20190059.012.30$0
Nov 2019011655.302.75$319
Oct 2019012753.472.42$307
Sep 2019012755.052.66$337
Aug 2019015953.112.30$366
Jul 201907456.272.46$182
Jun 2019013352.782.49$331
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 201904356.803.06$132
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180246.594.19$8
Nov 201803552.934.24$148
Oct 201802461.443.40$82
Sep 20180759.543.11$22
Aug 20180359.403.07$9
Jul 201801765.142.93$50
Jun 201801660.183.08$49
May 201801065.382.90$29
Apr 2018020663.842.90$598
Mar 20180161.222.79$3
Feb 201804461.782.77$122
Jan 20180362.874.01$12
Dec 201701357.272.92$38
Nov 2017016255.423.12$505
Oct 201706449.292.98$191
Sep 2017015947.523.09$491
Aug 2017013945.373.00$418
Jul 201706443.873.09$198
Jun 2017014442.493.09$445
May 201709945.373.26$323
Apr 2017015347.933.21$491
Mar 2017010846.772.98$322
Feb 201705950.452.95$174
Jan 2017038549.413.42$1,316
Dec 2016018948.763.72$704
Nov 2016042042.492.64$1,111
Oct 201603446.193.09$105
Sep 2016014241.553.10$440
Aug 2016017541.442.92$512
Jul 2016020041.622.92$585
Jun 2016063745.352.69$1,711
May 2016086342.521.99$1,718
Apr 20160036.561.99$0
Mar 2016021833.011.79$391
Feb 2016040026.472.06$825
Jan 2016052627.352.36$1,244
Dec 2015054132.362.00$1,083
Nov 2015054038.792.17$1,170
Oct 2015052443.552.43$1,272
Sep 2015056042.992.76$1,545
Aug 2015064340.162.87$1,847
Jul 2015066148.152.95$1,947
Jun 2015063556.152.88$1,831
May 2015078155.212.96$2,308
Apr 2015057749.822.71$1,562
Mar 2015044542.892.93$1,306
Feb 2015067344.662.98$2,003
Jan 2015069843.433.10$2,164
Dec 2014081654.693.59$2,931
Nov 2014071170.464.25$3,023
Oct 2014076978.303.90$3,000
Sep 2014079186.164.05$3,200
Aug 2014080589.394.04$3,248
Jul 2014081096.564.18$3,385
Jun 2014071598.164.74$3,387
May 2014088594.734.73$4,183
Apr 2014069895.944.81$3,357
Mar 2014082895.895.06$4,187
Feb 2014069797.406.19$4,316
Jan 2014087790.404.86$4,263
Dec 2013074691.824.35$3,248
Nov 2013076788.853.74$2,867
Oct 2013093297.423.78$3,522
Sep 201301,031104.113.72$3,833
Aug 20130816104.253.52$2,874
Jul 20130650102.523.72$2,417
Jun 2013070594.403.93$2,773
May 2013064194.834.15$2,660
Apr 2013074593.964.28$3,191
Mar 2013080793.623.91$3,158
Feb 2013090091.233.42$3,078
Jan 2013076991.603.42$2,630
Dec 2012089586.773.42$3,061
Nov 2012010286.953.62$370
Oct 2012071589.383.40$2,431
Sep 2012082994.672.92$2,419
Aug 2012091992.662.91$2,673
Jul 2012094785.133.02$2,861
Jun 201201,01179.822.52$2,547
May 2012092491.612.49$2,299
Apr 201201,014101.652.00$2,025
Mar 201201,262105.052.22$2,804
Feb 201201,511101.102.57$3,884
Jan 201201,53498.092.73$4,194
Dec 201101,09096.873.24$3,531
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 201103783.623.99$147
Aug 20110083.404.15$0
Jul 201102,04994.144.52$9,256
Jun 201103,23692.904.64$15,015
May 2011014498.134.40$634
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 201101,39686.504.59$6,406
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 201001,31078.103.51$4,597
Sep 201001,66072.633.98$6,606
Aug 201001,62673.684.42$7,186
Jul 201001,64072.554.74$7,768
Jun 201001,59670.364.91$7,837
May 201001,82471.124.24$7,725
Apr 201001,70981.694.12$7,046
Mar 201001,75278.394.39$7,689
Feb 201001,50573.585.44$8,191
Jan 201001,55374.365.96$9,262
Dec 200901,65271.445.48$9,059
Nov 200901,24174.593.75$4,656
Oct 200902,99272.544.11$12,298
Sep 200902,90065.543.06$8,888
Aug 200903,07467.423.22$9,894
Jul 200903,14761.133.46$10,903
Jun 200903,28666.163.90$12,799
May 200903,27854.743.93$12,869
Apr 200903,16146.773.59$11,340
Mar 200943,49942.144.06$14,371
Feb 200902,46332.814.63$11,411
Jan 200902,82435.865.37$15,168
Dec 200803,27037.105.98$19,545
Nov 200803,53855.496.86$24,272
Oct 200803,30675.246.92$22,884
Sep 200803,596101.767.88$28,326
Aug 200803,797114.228.48$32,210
Jul 200803,919131.0811.39$44,635
Jun 200803,992131.3313.03$52,026
May 200802,548123.1711.57$29,491
Apr 2008243,495110.3110.45$39,187
Mar 200803,645101.909.66$35,226
Feb 200804,26692.538.77$37,415
Jan 200804,43290.388.21$36,368
Dec 200705,80088.337.30$42,351
Nov 200705,62891.677.29$41,038
Oct 200703,38982.856.92$23,459
Sep 200703,48075.846.24$21,730
Aug 200703,39869.066.39$21,706
Jul 200703,78670.906.39$24,185
Jun 200704,69062.007.55$35,402
May 200705,83358.747.85$45,767
Apr 2007335,44659.617.81$44,474
Mar 200706,06756.927.30$44,301
Feb 2007725,79455.108.22$51,571
Jan 200707,00750.306.73$47,135
Dec 20061377,75856.656.92$61,434
Nov 200608,13754.207.62$61,983
Oct 200608,73454.906.01$52,525
Sep 2006010,02360.085.04$50,488
Aug 2006012,15268.717.34$89,195
Jul 200614914,92369.376.34$104,989
Jun 20064222,74766.286.38$147,998

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                    6 Mcf  × $  3.05 =        $18

────────────────────────────────────────────────────
Month total                                      $18

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/219917 is the state's own key, not one this site invented.