ELICK

Operated by ORX RESOURCES, L.L.C. (P-5 627136) in the MIDWAY, EAST (10700) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 222662District 04Field 611559552 tax incentive programmesCondensateGasSaveExport
Value, all time
$4.8 M
Jun 2006 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
240
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 27 leases and 27 wells, and the rule below applies to all of them.

Discovered
1973-04-06
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-05-16.

The Commission's schedule remark for this field reads: RULES 1 AND 2 AMENDED. P-15 AND PLAT REQUIRED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-04-09181556
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition16,338 bbl$1,235,669
GasProduction616,304 Mcf$3,598,984
Total$4,834,652

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.9710, -97.3049. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.97099, -97.30492 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
12,188 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,188 ft.

Completions filed
Dec 2022
1 of 1 wells

1 well

42-40932831112,188 ftDec 2022

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (240)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

240 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 2015314243.433.10$571
Dec 2014420254.693.59$944
Nov 2014424170.464.25$1,307
Oct 2014134178.303.90$1,409
Sep 2014013086.164.05$526
Aug 2014126089.394.04$1,139
Jul 20141234596.564.18$2,601
Jun 20142679698.164.74$6,323
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 2014558595.895.06$3,438
Feb 20140797.406.19$43
Jan 2014151,26890.404.86$7,519
Dec 201387391.824.35$1,052
Nov 2013391,45388.853.74$8,897
Oct 2013372,07797.423.78$11,454
Sep 2013212,591104.113.72$11,819
Aug 2013804,081104.253.52$22,716
Jul 20131086,848102.523.72$36,531
Jun 2013271,70894.403.93$9,267
May 20133094.834.15$284
Apr 2013411,16593.964.28$8,842
Mar 2013755,00593.623.91$26,605
Feb 2013784,22891.233.42$21,575
Jan 2013937,89591.603.42$35,519
Dec 2012665,49286.773.42$24,510
Nov 20121035,11286.953.62$27,487
Oct 2012927,37889.383.40$33,306
Sep 20123135,45394.672.92$45,546
Aug 20121874,75692.662.91$31,159
Jul 201205,08585.133.02$15,361
Jun 20121904,59279.822.52$26,733
May 201205,05891.612.49$12,586
Apr 20121904,892101.652.00$29,082
Mar 20121915,230105.052.22$31,686
Feb 20121934,124101.102.57$30,112
Jan 201203,49998.092.73$9,567
Dec 20111913,83096.873.24$30,910
Nov 20111905,17195.723.31$35,309
Oct 201103,62984.983.65$13,241
Sep 20111914,71283.623.99$34,753
Aug 201103,98383.404.15$16,527
Jul 20111921,81094.144.52$26,251
Jun 20111912,61092.904.64$29,854
May 20111843,17898.134.40$32,054
Apr 201104,940105.964.33$21,406
Mar 20111933,85896.364.06$34,251
Feb 20111946,33185.644.18$43,078
Jan 201105,33786.504.59$24,490
Dec 20101936,05385.734.35$42,863
Nov 20101945,96380.843.80$38,315
Oct 20101916,30878.103.51$37,051
Sep 201005,91072.633.98$23,519
Aug 20101886,36873.684.42$41,994
Jul 20101896,33872.554.74$43,732
Jun 20101765,80170.364.91$40,869
May 20101915,80471.124.24$38,165
Apr 201005,90881.694.12$24,357
Mar 20101876,37678.394.39$42,641
Feb 20101915,26773.585.44$42,719
Jan 20101936,64574.365.96$53,983
Dec 20091886,67371.445.48$50,024
Nov 200906,70774.593.75$25,161
Oct 20091897,23772.544.11$43,456
Sep 20091896,80765.543.06$33,249
Aug 20091876,90167.423.22$34,818
Jul 20091747,38861.133.46$36,232
Jun 20091887,42766.163.90$41,366
May 20091927,72554.743.93$40,837
Apr 20091937,62146.773.59$36,367
Mar 20091897,49842.144.06$38,399
Feb 20091947,21532.814.63$39,792
Jan 20093857,88935.865.37$56,178
Dec 20081967,95137.105.98$54,796
Nov 20081957,87055.496.86$64,812
Oct 20081958,29275.246.92$72,069
Sep 20081907,933101.767.88$81,823
Aug 20083908,403114.228.48$115,829
Jul 20081918,692131.0811.39$124,033
Jun 200808,588131.3313.03$111,924
May 20081998,805123.1711.57$126,422
Apr 20083648,714110.3110.45$131,256
Mar 20081969,029101.909.66$107,229
Feb 20081968,35792.538.77$91,432
Jan 20083899,07190.388.21$109,592
Dec 20071949,28088.337.30$84,898
Nov 20071909,49691.677.29$86,659
Oct 200738610,40382.856.92$103,989
Sep 200718610,76575.846.24$81,325
Aug 200736811,60169.066.39$99,521
Jul 200719211,01070.906.39$83,944
Jun 200757511,60962.007.55$123,280
May 200718212,63358.747.85$109,813
Apr 200758115,06159.617.81$152,188
Mar 200756718,46056.927.30$167,068
Feb 200758120,08455.108.22$197,023
Jan 200777724,61550.306.73$204,665
Dec 200696532,49156.656.92$279,454
Nov 200605,76154.207.62$43,884
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2015 — as filed, then multipliedworked
Condensate             3 bbl  × $ 43.43 =       $130
Gas                  142 Mcf  × $  3.10 =       $440

────────────────────────────────────────────────────
Month total                                     $571

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/222662 is the state's own key, not one this site invented.