DAISY

Operated by HILCORP ENERGY COMPANY (P-5 386310) in the HAYNES (MIDDLE WILCOX CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 223743District 04Field 398182502 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.6 M
Sep 2006 – May 2026
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
237
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 406 leases and 406 wells, and the rule below applies to all of them.

Discovered
1999-06-29
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2008-04-24.

The Commission's schedule remark for this field reads: RULE 2 AMENDED. STANDARD 40 ACRES.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-02-09172699
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition4 bbl$201
GasProduction264,121 Mcf$1,608,290
Total$1,608,491

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 26.9591, -99.1070. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

26.95908, -99.10700 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,618 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,618 ft.

Completions filed
Sep 2006
1 of 1 wells

1 well

42-50535667711,618 ftSep 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (237)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

237 months

May 2026049106.413.05$149
Apr 202604398.932.87$123
Mar 202607189.753.15$224
Feb 202607663.503.75$285
Jan 202605559.138.00$440
Dec 202508656.664.41$380
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 202502666.743.32$86
Jun 202508966.483.13$278
May 202509260.553.23$297
Apr 2025017162.363.54$606
Mar 20250067.704.27$0
Feb 202505470.884.34$234
Jan 202508274.324.28$351
Dec 202405068.993.12$156
Nov 2024010069.052.20$220
Oct 202408471.372.28$192
Sep 202407369.612.36$173
Aug 202409975.632.06$204
Jul 2024010479.932.15$223
Jun 202409978.082.63$261
May 2024010578.812.20$231
Apr 2024010884.451.66$179
Mar 2024011880.301.55$182
Feb 2024011276.091.78$200
Jan 2024012473.023.30$409
Dec 2023011271.262.61$292
Nov 2023015177.892.81$424
Oct 2023028185.443.09$868
Sep 2023028389.042.74$774
Aug 2023037980.522.67$1,013
Jul 2023049474.852.64$1,305
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 202308876.533.39$298
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 2022040104.226.84$274
Mar 20220120108.885.08$609
Feb 2022018291.054.86$884
Jan 2022023081.844.54$1,044
Dec 2021025871.323.90$1,006
Nov 2021027177.435.24$1,419
Oct 2021030479.795.71$1,737
Sep 2021034769.865.35$1,857
Aug 2021045466.024.22$1,916
Jul 2021024670.783.98$980
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 202002637.091.99$52
Aug 20200039.982.39$0
Jul 2020015338.371.83$279
Jun 2020025534.901.69$431
May 2020025716.921.81$466
Apr 2020010414.751.80$188
Mar 20200030.341.86$0
Feb 202003849.881.98$75
Jan 2020023557.252.09$492
Dec 2019024759.012.30$569
Nov 2019022055.302.75$605
Oct 2019019253.472.42$464
Sep 2019023155.052.66$614
Aug 2019021653.112.30$498
Jul 2019023756.272.46$583
Jun 2019021552.782.49$536
May 2019020958.482.74$573
Apr 2019024362.632.75$668
Mar 2019025456.803.06$778
Feb 2019022650.852.79$631
Jan 2019024946.033.23$804
Dec 2018025246.594.19$1,055
Nov 2018025052.934.24$1,059
Oct 2018025561.443.40$867
Sep 2018088759.543.11$2,757
Aug 2018029659.403.07$908
Jul 2018027765.142.93$812
Jun 2018033160.183.08$1,018
May 2018053465.382.90$1,549
Apr 2018030863.842.90$893
Mar 2018018361.222.79$510
Feb 2018022261.782.77$614
Jan 201807362.874.01$293
Dec 20170157.272.92$3
Nov 2017011155.423.12$346
Oct 20170049.292.98$0
Sep 201707547.523.09$232
Aug 2017022645.373.00$679
Jul 2017014343.873.09$441
Jun 2017027142.493.09$837
May 2017031445.373.26$1,025
Apr 2017025247.933.21$809
Mar 2017030646.772.98$913
Feb 2017029950.452.95$883
Jan 2017014849.413.42$506
Dec 2016018848.763.72$700
Nov 2016018642.492.64$492
Oct 2016013146.193.09$405
Sep 201607941.553.10$245
Aug 201607241.442.92$211
Jul 2016013241.622.92$386
Jun 2016018045.352.69$483
May 2016020042.521.99$398
Apr 2016021336.561.99$424
Mar 2016021133.011.79$379
Feb 2016021126.472.06$435
Jan 2016024327.352.36$575
Dec 2015027332.362.00$546
Nov 2015025838.792.17$559
Oct 2015027643.552.43$670
Sep 2015026142.992.76$720
Aug 2015028740.162.87$824
Jul 2015030048.152.95$884
Jun 2015029856.152.88$859
May 2015030355.212.96$896
Apr 2015028649.822.71$774
Mar 2015029442.892.93$863
Feb 2015025344.662.98$753
Jan 2015030943.433.10$958
Dec 2014031854.693.59$1,142
Nov 2014029070.464.25$1,233
Oct 2014026778.303.90$1,042
Sep 2014029386.164.05$1,185
Aug 2014032589.394.04$1,311
Jul 2014030696.564.18$1,279
Jun 2014029598.164.74$1,397
May 2014034294.734.73$1,616
Apr 2014032495.944.81$1,558
Mar 2014032295.895.06$1,628
Feb 2014026097.406.19$1,610
Jan 2014026690.404.86$1,293
Dec 2013031291.824.35$1,359
Nov 2013031688.853.74$1,181
Oct 2013036197.423.78$1,364
Sep 20130507104.113.72$1,885
Aug 20130327104.253.52$1,152
Jul 20130343102.523.72$1,275
Jun 2013033094.403.93$1,298
May 2013034794.834.15$1,440
Apr 2013034693.964.28$1,482
Mar 2013035893.623.91$1,401
Feb 2013032291.233.42$1,101
Jan 2013033991.603.42$1,159
Dec 2012037286.773.42$1,272
Nov 2012035986.953.62$1,301
Oct 2012037589.383.40$1,275
Sep 2012032894.672.92$957
Aug 2012037492.662.91$1,088
Jul 2012037485.133.02$1,130
Jun 2012035279.822.52$887
May 2012039991.612.49$993
Apr 20120331101.652.00$661
Mar 20120258105.052.22$573
Feb 20120375101.102.57$964
Jan 2012045098.092.73$1,230
Dec 2011046196.873.24$1,494
Nov 2011045995.723.31$1,520
Oct 2011046484.983.65$1,693
Sep 2011046783.623.99$1,861
Aug 2011048783.404.15$2,021
Jul 2011044094.144.52$1,988
Jun 2011047792.904.64$2,213
May 2011051398.134.40$2,260
Apr 20110511105.964.33$2,214
Mar 2011051996.364.06$2,106
Feb 2011051085.644.18$2,132
Jan 2011048186.504.59$2,207
Dec 2010050085.734.35$2,174
Nov 2010054080.843.80$2,049
Oct 2010057378.103.51$2,011
Sep 2010054672.633.98$2,173
Aug 2010059973.684.42$2,647
Jul 2010061972.554.74$2,932
Jun 2010061170.364.91$3,000
May 2010065771.124.24$2,783
Apr 2010064481.694.12$2,655
Mar 2010066078.394.39$2,897
Feb 2010064173.585.44$3,489
Jan 201001,42574.365.96$8,499
Dec 200901,40971.445.48$7,727
Nov 200901,45074.593.75$5,440
Oct 200901,57972.544.11$6,490
Sep 200901,40265.543.06$4,297
Aug 200901,46267.423.22$4,705
Jul 200901,50961.133.46$5,228
Jun 200901,43766.163.90$5,597
May 200901,42154.743.93$5,578
Apr 200901,38346.773.59$4,962
Mar 200901,43242.144.06$5,812
Feb 200901,30032.814.63$6,023
Jan 200901,11735.865.37$5,999
Dec 200801,35837.105.98$8,117
Nov 200801,36355.496.86$9,351
Oct 200801,41475.246.92$9,788
Sep 200801,348101.767.88$10,618
Aug 200801,464114.228.48$12,419
Jul 200801,533131.0811.39$17,460
Jun 200801,512131.3313.03$19,705
May 200801,666123.1711.57$19,283
Apr 200801,711110.3110.45$17,888
Mar 200801,738101.909.66$16,796
Feb 200801,67392.538.77$14,673
Jan 200801,92990.388.21$15,829
Dec 200701,84088.337.30$13,436
Nov 200702,14491.677.29$15,633
Oct 200702,12282.856.92$14,688
Sep 200702,38475.846.24$14,886
Aug 200702,29169.066.39$14,635
Jul 200702,80570.906.39$17,918
Jun 200703,65762.007.55$27,605
May 200703,61258.747.85$28,341
Apr 200703,79959.617.81$29,652
Mar 200705,64056.927.30$41,183
Feb 200707,11055.108.22$58,416
Jan 200749,32750.306.73$62,943
Dec 2006015,95156.656.92$110,356
Nov 2006029,92054.207.62$227,915
Oct 2006076,49254.906.01$460,008
Sep 2006011,87560.085.04$59,817

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   49 Mcf  × $  3.05 =       $149

────────────────────────────────────────────────────
Month total                                     $149

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/223743 is the state's own key, not one this site invented.