HAYNES "A"

Operated by BORDERTOWN ENERGY RESOURCES, LLC (P-5 100804) in the HAYNES (MIDDLE WILCOX CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 223838District 04Field 398182502 tax incentive programmesCondensateGasSaveExport
Value, all time
$6.3 M
Oct 2006 – May 2026
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
236
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 406 leases and 406 wells, and the rule below applies to all of them.

Discovered
1999-06-29
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2008-04-24.

The Commission's schedule remark for this field reads: RULE 2 AMENDED. STANDARD 40 ACRES.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-09-11185571
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition68 bbl$6,042
GasProduction917,895 Mcf$6,299,207
Total$6,305,248

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.0029, -99.0575. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.00292, -99.05754 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
13,043 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 13,043 ft.

Completions filed
Jun 2007
1 of 1 wells

1 well

42-50535578113,043 ftJun 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (236)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

236 months

May 20260107106.413.05$326
Apr 2026010198.932.87$290
Mar 2026010289.753.15$321
Feb 2026010863.503.75$405
Jan 2026010259.138.00$816
Dec 2025010456.664.41$459
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 202506362.743.08$194
Aug 202505363.933.01$160
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 202507660.553.23$246
Apr 202505062.363.54$177
Mar 202506267.704.27$265
Feb 20250070.884.34$0
Jan 202507674.324.28$325
Dec 20240068.993.12$0
Nov 202405169.052.20$112
Oct 202405071.372.28$114
Sep 20240069.612.36$0
Aug 2024015175.632.06$312
Jul 2024010379.932.15$221
Jun 20240078.082.63$0
May 2024012478.812.20$273
Apr 20240084.451.66$0
Mar 202408180.301.55$125
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 202305271.262.61$136
Nov 202306277.892.81$174
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 202305580.522.67$147
Jul 202305674.852.64$148
Jun 202305868.962.26$131
May 202306170.622.23$136
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 202103366.024.22$139
Jul 202103570.783.98$139
Jun 202103369.493.38$112
May 202103063.483.02$91
Apr 202103060.362.76$83
Mar 202102261.302.72$60
Feb 202102857.805.55$155
Jan 202103150.412.81$87
Dec 202003144.642.68$83
Nov 202002938.772.71$78
Oct 202003036.972.48$74
Sep 202002937.091.99$58
Aug 202002939.982.39$69
Jul 202002938.371.83$53
Jun 202002934.901.69$49
May 202003016.921.81$54
Apr 202002914.751.80$52
Mar 202002930.341.86$54
Feb 202002949.881.98$57
Jan 202003157.252.09$65
Dec 201903059.012.30$69
Nov 201903055.302.75$83
Oct 201902653.472.42$63
Sep 201903055.052.66$80
Aug 201903153.112.30$71
Jul 201903256.272.46$79
Jun 201903252.782.49$80
May 201903558.482.74$96
Apr 201902862.632.75$77
Mar 201903156.803.06$95
Feb 201902750.852.79$75
Jan 201901846.033.23$58
Dec 201801046.594.19$42
Nov 201802152.934.24$89
Oct 201801761.443.40$58
Sep 20180059.543.11$0
Aug 201802159.403.07$64
Jul 201802265.142.93$65
Jun 201804360.183.08$132
May 201803765.382.90$107
Apr 201803663.842.90$104
Mar 201804161.222.79$114
Feb 201803061.782.77$83
Jan 201803162.874.01$124
Dec 201703557.272.92$102
Nov 201703955.423.12$122
Oct 201705849.292.98$173
Sep 201707647.523.09$235
Aug 201707145.373.00$213
Jul 201709143.873.09$281
Jun 2017011542.493.09$355
May 2017020045.373.26$653
Apr 2017016647.933.21$533
Mar 201707946.772.98$236
Feb 201708050.452.95$236
Jan 2017010649.413.42$362
Dec 2016010548.763.72$391
Nov 2016012342.492.64$325
Oct 2016010546.193.09$324
Sep 201601941.553.10$59
Aug 2016018741.442.92$547
Jul 2016018741.622.92$547
Jun 2016019245.352.69$516
May 2016019242.521.99$382
Apr 2016020936.561.99$416
Mar 2016021933.011.79$393
Feb 2016021826.472.06$450
Jan 2016038727.352.36$915
Dec 2015015632.362.00$312
Nov 2015012438.792.17$269
Oct 201504743.552.43$114
Sep 201509442.992.76$259
Aug 20150040.162.87$0
Jul 201504048.152.95$118
Jun 20150956.152.88$26
May 201502655.212.96$77
Apr 2015016849.822.71$455
Mar 201509442.892.93$276
Feb 201505844.662.98$173
Jan 2015022743.433.10$704
Dec 2014038854.693.59$1,393
Nov 2014047970.464.25$2,037
Oct 2014054778.303.90$2,134
Sep 2014058786.164.05$2,375
Aug 2014034089.394.04$1,372
Jul 2014040296.564.18$1,680
Jun 2014027798.164.74$1,312
May 2014041094.734.73$1,938
Apr 2014044895.944.81$2,154
Mar 2014044895.895.06$2,265
Feb 2014044097.406.19$2,724
Jan 2014053390.404.86$2,591
Dec 2013049991.824.35$2,173
Nov 20136845588.853.74$7,743
Oct 2013055397.423.78$2,090
Sep 20130561104.113.72$2,086
Aug 20130597104.253.52$2,103
Jul 20130783102.523.72$2,911
Jun 2013064194.403.93$2,521
May 2013070094.834.15$2,904
Apr 2013076493.964.28$3,272
Mar 2013080493.623.91$3,146
Feb 2013064691.233.42$2,209
Jan 2013073191.603.42$2,500
Dec 2012087386.773.42$2,986
Nov 2012077386.953.62$2,802
Oct 2012073989.383.40$2,512
Sep 2012076494.672.92$2,230
Aug 2012076292.662.91$2,216
Jul 2012073285.133.02$2,211
Jun 2012069479.822.52$1,748
May 201201,27291.612.49$3,165
Apr 201201,575101.652.00$3,145
Mar 201201,154105.052.22$2,564
Feb 201202,261101.102.57$5,811
Jan 201201,45798.092.73$3,984
Dec 201101,94296.873.24$6,292
Nov 201101,61995.723.31$5,361
Oct 201101,36684.983.65$4,984
Sep 201101,94483.623.99$7,748
Aug 201101,76883.404.15$7,336
Jul 201101,95294.144.52$8,818
Jun 201101,85692.904.64$8,612
May 201102,26898.134.40$9,990
Apr 201102,744105.964.33$11,891
Mar 201103,09096.364.06$12,537
Feb 201102,71185.644.18$11,332
Jan 201103,65686.504.59$16,777
Dec 201003,83285.734.35$16,661
Nov 201003,36180.843.80$12,756
Oct 201004,04078.103.51$14,176
Sep 201003,91772.633.98$15,588
Aug 201004,58573.684.42$20,263
Jul 201004,28772.554.74$20,305
Jun 201006,42170.364.91$31,530
May 201006,78471.124.24$28,732
Apr 201007,93581.694.12$32,714
Mar 201009,82278.394.39$43,106
Feb 2010012,43973.585.44$67,698
Jan 2010025,78174.365.96$153,760
Dec 2009022,04171.445.48$120,867
Nov 2009018,60574.593.75$69,797
Oct 200901,94772.544.11$8,003
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090146.773.59$4
Mar 20090142.144.06$4
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200801,034114.228.48$8,771
Jul 200803,202131.0811.39$36,469
Jun 200804,030131.3313.03$52,522
May 200805,935123.1711.57$68,693
Apr 200805,876110.3110.45$61,433
Mar 200806,549101.909.66$63,290
Feb 2008013,35292.538.77$117,105
Jan 200803,68990.388.21$30,271
Dec 200705,14588.337.30$37,569
Nov 200707,59391.677.29$55,366
Oct 200704,86282.856.92$33,655
Sep 2007010,09575.846.24$63,035
Aug 2007018,44469.066.39$117,819
Jul 2007018,91470.906.39$120,822
Jun 2007023,02662.007.55$173,811
May 2007036,73958.747.85$288,264
Apr 2007066,72159.617.81$520,771
Mar 2007040,64656.927.30$296,796
Feb 2007086,22155.108.22$708,392
Jan 2007057,19550.306.73$384,742
Dec 20060108,90056.656.92$753,418
Nov 20060165,30254.207.62$1,259,185
Oct 2006028,15654.906.01$169,325

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  107 Mcf  × $  3.05 =       $326

────────────────────────────────────────────────────
Month total                                     $326

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/223838 is the state's own key, not one this site invented.