GRUY, DAGMAR

Operated by VARAS ENERGY OPERATING COMPANY, (P-5 102824) in the LOPEZ, SE. (CONSOLIDATED) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 228945District 04Field 548892002 tax incentive programmesCondensateGasSaveExport
Value, all time
$7.9 M
Jul 2007 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
227
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 61 leases and 61 wells, and the rule below applies to all of them.

Discovered
2006-12-19
as the register files it
Field class
Gas
the register's own label
Between wells
0 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2009-02-10.

The Commission's schedule remark for this field reads: NO BETWEEN WELL SPACING. ALLOCATION FORMULA SUSPENDED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-10-21185918
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition14,319 bbl$1,239,588
GasProduction1,059,081 Mcf$6,707,746
Total$7,947,334

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.6524, -98.7659. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.65238, -98.76594 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,700 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,700 ft.

Completions filed
Jul 2007
1 of 1 wells

1 well

42-13138967178,700 ftJul 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (227)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

227 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20212069.493.38$139
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20152043.433.10$87
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20143653089.394.04$5,357
Jul 2014573,50396.564.18$20,145
Jun 2014583,43298.164.74$21,950
May 2014613,45894.734.73$22,123
Apr 2014633,38095.944.81$22,299
Mar 2014413,70695.895.06$22,672
Feb 2014422,11497.406.19$17,181
Jan 2014723,40390.404.86$23,050
Dec 2013783,41191.824.35$22,015
Nov 2013763,53288.853.74$19,956
Oct 2013794,25797.423.78$23,785
Sep 2013703,685104.113.72$20,988
Aug 20131854,249104.253.52$34,254
Jul 20131394,025102.523.72$29,214
Jun 20131393,36494.403.93$26,354
May 20131383,51194.834.15$27,654
Apr 20131423,60793.964.28$28,790
Mar 20131313,80393.623.91$27,145
Feb 20131263,10591.233.42$22,114
Jan 20131394,14291.603.42$26,898
Dec 20121463,72086.773.42$25,391
Nov 20121063,87686.953.62$23,267
Oct 20121204,27589.383.40$25,259
Sep 20121354,41294.672.92$25,656
Aug 20121334,65792.662.91$25,867
Jul 2012863,26585.133.02$17,184
Jun 20122024,52879.822.52$27,530
May 20121494,61691.612.49$25,136
Apr 20122034,615101.652.00$29,850
Mar 20122254,892105.052.22$34,507
Feb 20121854,707101.102.57$30,802
Jan 20121644,65198.092.73$28,803
Dec 20111974,91596.873.24$35,007
Nov 20111994,93095.723.31$35,373
Oct 20112065,24784.983.65$36,650
Sep 20111695,29683.623.99$35,241
Aug 20111305,66083.404.15$34,327
Jul 2011545,44494.144.52$29,675
Jun 2011565,65892.904.64$31,455
May 2011686,03998.134.40$33,274
Apr 2011546,190105.964.33$32,545
Mar 2011506,50296.364.06$31,199
Feb 2011565,70485.644.18$28,638
Jan 2011626,67686.504.59$35,998
Dec 20101616,89685.734.35$43,785
Nov 20101857,13780.843.80$42,043
Oct 20101597,68578.103.51$39,384
Sep 20101527,81772.633.98$42,147
Aug 20101818,30773.684.42$50,048
Jul 20102098,29072.554.74$54,428
Jun 20101077,50570.364.91$44,381
May 2010708,75671.124.24$42,062
Apr 2010838,94881.694.12$43,670
Mar 2010709,41078.394.39$46,785
Feb 2010848,35673.585.44$51,657
Jan 201015110,28874.365.96$72,587
Dec 200916010,47671.445.48$68,878
Nov 200912110,33274.593.75$47,786
Oct 200914110,91272.544.11$55,079
Sep 200913610,60065.543.06$41,400
Aug 200914711,48267.423.22$46,866
Jul 200914611,82661.133.46$49,896
Jun 20099711,84766.163.90$52,562
May 20099412,90054.743.93$55,788
Apr 200911612,03946.773.59$48,615
Mar 200913013,08942.144.06$58,606
Feb 200911912,63432.814.63$62,438
Jan 200911213,83735.865.37$78,335
Dec 20086615,53137.105.98$95,280
Nov 20086016,96655.496.86$119,722
Oct 20086718,15475.246.92$130,703
Sep 20085015,878101.767.88$130,160
Aug 20086418,860114.228.48$167,300
Jul 200811921,243131.0811.39$257,544
Jun 200829321,669131.3313.03$320,884
May 200831227,844123.1711.57$360,704
Apr 200839429,656110.3110.45$353,511
Mar 200853432,529101.909.66$368,777
Feb 200844233,82292.538.77$337,537
Jan 200864940,46190.388.21$390,669
Dec 200738845,94788.337.30$369,776
Nov 200741643,15891.677.29$352,830
Oct 200750253,63082.856.92$412,816
Sep 200761563,79875.846.24$445,007
Aug 200788397,98169.066.39$686,877
Jul 200730331,89370.906.39$225,213

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2021 — as filed, then multipliedworked
Condensate             2 bbl  × $ 69.49 =       $139
Gas                    0 Mcf  × $  3.38 =         $0

────────────────────────────────────────────────────
Month total                                     $139

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/228945 is the state's own key, not one this site invented.