MARSHALL, S. G.

Operated by HILCORP ENERGY COMPANY (P-5 386310) in the CISCO-BENAVIDES (LOBO CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 229092District 04Field 182962252 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.3 M
May 2007 – May 2026
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
229
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 264 leases and 264 wells, and the rule below applies to all of them.

Discovered
1999-06-29
as the register files it
Field class
Gas
the register's own label
Between wells
0 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2009-06-18.

The Commission's schedule remark for this field reads: SUSPENDED. OPERATORS ARE REQUIRED TO PERFORM ANNUAL G-10 TESTS.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112007-12-12176978
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition67 bbl$5,283
GasProduction214,925 Mcf$1,268,261
Total$1,273,545

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.0536, -99.3247. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.05363, -99.32469 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,524 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,524 ft.

Completions filed
May 2007
1 of 1 wells

1 well

42-505358273310,524 ftMay 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (229)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

229 months

May 2026036106.413.05$110
Apr 2026037398.932.87$1,070
Mar 202602889.753.15$88
Feb 202602163.503.75$79
Jan 2026012059.138.00$960
Dec 2025013656.664.41$600
Nov 2025016258.593.93$636
Oct 2025019659.383.30$648
Sep 2025019662.743.08$603
Aug 2025023863.933.01$718
Jul 202505566.743.32$182
Jun 2025016566.483.13$516
May 2025027160.553.23$876
Apr 2025021762.363.54$769
Mar 2025022567.704.27$960
Feb 202504370.884.34$187
Jan 2025027874.324.28$1,189
Dec 2024012768.993.12$396
Nov 2024030969.052.20$679
Oct 2024039071.372.28$890
Sep 202407869.612.36$184
Aug 2024039275.632.06$809
Jul 202406079.932.15$129
Jun 2024031478.082.63$827
May 2024036478.812.20$800
Apr 2024015784.451.66$260
Mar 2024033480.301.55$516
Feb 2024044576.091.78$794
Jan 2024037173.023.30$1,223
Dec 2023042271.262.61$1,102
Nov 202301,18877.892.81$3,335
Oct 202301585.443.09$46
Sep 202303689.042.74$98
Aug 202303680.522.67$96
Jul 2023035074.852.64$925
Jun 202304568.962.26$102
May 2023058370.622.23$1,299
Apr 202301178.122.24$25
Mar 20230472.852.39$10
Feb 20230975.112.47$22
Jan 202306476.533.39$217
Dec 202204176.415.73$235
Nov 2022033385.005.65$1,880
Oct 2022011987.185.86$698
Sep 2022052584.888.16$4,286
Aug 202201694.529.13$146
Jul 20220441101.587.54$3,326
Jun 20220237115.097.98$1,891
May 20220605109.378.43$5,102
Apr 20220407104.226.84$2,783
Mar 202203108.885.08$15
Feb 20220191.054.86$5
Jan 2022017881.844.54$808
Dec 2021034671.323.90$1,349
Nov 2021023177.435.24$1,210
Oct 2021043079.795.71$2,457
Sep 202102069.865.35$107
Aug 2021049566.024.22$2,089
Jul 2021079470.783.98$3,162
Jun 202101,08269.493.38$3,658
May 2021062863.483.02$1,895
Apr 202101,19960.362.76$3,307
Mar 202102161.302.72$57
Feb 202103157.805.55$172
Jan 202103450.412.81$96
Dec 202003644.642.68$96
Nov 202003038.772.71$81
Oct 202003236.972.48$79
Sep 202003337.091.99$66
Aug 202006139.982.39$145
Jul 202004338.371.83$78
Jun 202003134.901.69$52
May 2020073116.921.81$1,327
Apr 202001414.751.80$25
Mar 202001030.341.86$19
Feb 202002449.881.98$48
Jan 202005357.252.09$111
Dec 2019050259.012.30$1,157
Nov 201904255.302.75$116
Oct 2019069053.472.42$1,669
Sep 201903755.052.66$98
Aug 201901953.112.30$44
Jul 2019011256.272.46$276
Jun 2019064252.782.49$1,599
May 201901658.482.74$44
Apr 201903462.632.75$94
Mar 201902756.803.06$83
Feb 201902150.852.79$59
Jan 201902646.033.23$84
Dec 201803946.594.19$163
Nov 201804052.934.24$169
Oct 201804961.443.40$167
Sep 20180659.543.11$19
Aug 201802459.403.07$74
Jul 201805665.142.93$164
Jun 201802160.183.08$65
May 20180565.382.90$15
Apr 201801363.842.90$38
Mar 201801961.222.79$53
Feb 201801061.782.77$28
Jan 201801162.874.01$44
Dec 201701757.272.92$50
Nov 20170955.423.12$28
Oct 201701849.292.98$54
Sep 201702747.523.09$83
Aug 201702845.373.00$84
Jul 201704643.873.09$142
Jun 2017049442.493.09$1,525
May 201704345.373.26$140
Apr 2017010047.933.21$321
Mar 2017012146.772.98$361
Feb 2017021250.452.95$626
Jan 2017034949.413.42$1,193
Dec 20160648.763.72$22
Nov 201603342.492.64$87
Oct 201606846.193.09$210
Sep 2016031541.553.10$977
Aug 201601941.442.92$56
Jul 2016014441.622.92$421
Jun 201604145.352.69$110
May 2016011742.521.99$233
Apr 201605836.561.99$115
Mar 2016020333.011.79$364
Feb 2016018626.472.06$384
Jan 201606127.352.36$144
Dec 2015016932.362.00$338
Nov 2015020138.792.17$436
Oct 2015029343.552.43$711
Sep 2015034742.992.76$957
Aug 2015041640.162.87$1,195
Jul 2015021048.152.95$618
Jun 2015021956.152.88$631
May 2015018555.212.96$547
Apr 201509449.822.71$254
Mar 201501642.892.93$47
Feb 2015047644.662.98$1,417
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 201401778.303.90$66
Sep 20140286.164.05$8
Aug 20140389.394.04$12
Jul 20140296.564.18$8
Jun 20140398.164.74$14
May 20140394.734.73$14
Apr 20140295.944.81$10
Mar 20140295.895.06$10
Feb 20140597.406.19$31
Jan 2014028090.404.86$1,361
Dec 20130491.824.35$17
Nov 2013047288.853.74$1,764
Oct 201301797.423.78$64
Sep 201311104.113.72$108
Aug 20130472104.253.52$1,663
Jul 20130520102.523.72$1,933
Jun 2013065694.403.93$2,580
May 2013080594.834.15$3,340
Apr 201301,05393.964.28$4,510
Mar 2013094893.623.91$3,709
Feb 201301,09591.233.42$3,745
Jan 201304391.603.42$147
Dec 2012032986.773.42$1,125
Nov 20120386.953.62$11
Oct 2012038189.383.40$1,295
Sep 2012084594.672.92$2,466
Aug 2012099792.662.91$2,899
Jul 201201,55585.133.02$4,697
Jun 2012050279.822.52$1,265
May 201202191.612.49$52
Apr 20120491101.652.00$980
Mar 201211,141105.052.22$2,640
Feb 201201,608101.102.57$4,133
Jan 2012081198.092.73$2,217
Dec 201111,18496.873.24$3,933
Nov 201111,37995.723.31$4,662
Oct 201111,77484.983.65$6,557
Sep 20110183.623.99$4
Aug 201104183.404.15$170
Jul 2011145794.144.52$2,159
Jun 20110992.904.64$42
May 2011064698.134.40$2,846
Apr 201101,998105.964.33$8,658
Mar 201103096.364.06$122
Feb 2011012585.644.18$523
Jan 201141,06086.504.59$5,210
Dec 201001,52585.734.35$6,630
Nov 2010042380.843.80$1,605
Oct 201011,63078.103.51$5,798
Sep 201011,01472.633.98$4,108
Aug 2010086373.684.42$3,814
Jul 201001,35072.554.74$6,394
Jun 201001,67270.364.91$8,210
May 2010278271.124.24$3,454
Apr 201021,91181.694.12$8,042
Mar 2010456678.394.39$2,798
Feb 201021,82273.585.44$10,063
Jan 2010325374.365.96$1,732
Dec 200911,95171.445.48$10,770
Nov 200921,74874.593.75$6,707
Oct 200931,56272.544.11$6,638
Sep 2009279565.543.06$2,568
Aug 200912,17967.423.22$7,081
Jul 200916,65961.133.46$23,131
Jun 200916,94666.163.90$27,121
May 200926,52554.743.93$25,725
Apr 200901,52046.773.59$5,453
Mar 200942,25042.144.06$9,301
Feb 200922,67932.814.63$12,477
Jan 2009225135.865.37$1,420
Dec 200811,62437.105.98$9,744
Nov 200812,36655.496.86$16,287
Oct 200802,81475.246.92$19,478
Sep 200812,242101.767.88$17,762
Aug 200812,474114.228.48$21,101
Jul 200812,857131.0811.39$32,671
Jun 200813,150131.3313.03$41,184
May 200803,368123.1711.57$38,982
Apr 200823,099110.3110.45$32,620
Mar 200854,536101.909.66$44,346
Feb 200864,44892.538.77$39,567
Jan 200824,21090.388.21$34,727
Dec 200704,02988.337.30$29,420
Nov 200705,85691.677.29$42,700
Oct 200707,09682.856.92$49,118
Sep 200706,90575.846.24$43,116
Aug 2007012,26069.066.39$78,316
Jul 2007013,81070.906.39$88,217
Jun 2007027,67662.007.55$208,911
May 200701,45558.747.85$11,416

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   36 Mcf  × $  3.05 =       $110

────────────────────────────────────────────────────
Month total                                     $110

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/229092 is the state's own key, not one this site invented.