MCALLEN, A. A. "B"

Operated by MERIT ENERGY COMPANY (P-5 561136) in the MCALLEN RANCH (VKSBG L-V, N CONS field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 229678District 04Field 587421582 tax incentive programmesCondensateGasSaveExport
Value, all time
$32.7 M
Jul 2007 – May 2026
Value, last 12 filed months
$115 k
at the published price for each month
Months reported
227
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 158 leases and 158 wells, and the rule below applies to all of them.

Discovered
2000-12-20
as the register files it
Field class
Gas
the register's own label
Between wells
0 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-03-14.

The Commission's schedule remark for this field reads: TEST, THE PREVIOUS TEST MUST BE USED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-06-10182814
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition32,523 bbl$2,819,884
GasProduction4,840,007 Mcf$29,858,866
Total$32,678,750

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 26.6697, -98.2526. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

26.66969, -98.25264 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
14,600 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 14,600 ft.

Completions filed
Sep 2007
1 of 1 wells

1 well

42-215336436414,600 ftSep 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (227)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

227 months

May 202603,361106.413.05$10,237
Apr 202603,62698.932.87$10,406
Mar 202603,00089.753.15$9,448
Feb 202603,16663.503.75$11,874
Jan 202603,57259.138.00$28,569
Dec 202503,51556.664.41$15,513
Nov 202502,54058.593.93$9,973
Oct 2025096159.383.30$3,176
Sep 202501,36062.743.08$4,185
Aug 202501,28663.933.01$3,877
Jul 202501,27966.743.32$4,240
Jun 202501,16966.483.13$3,657
May 202503,37160.553.23$10,896
Apr 202503,27962.363.54$11,618
Mar 202503,64067.704.27$15,537
Feb 202503,62870.884.34$15,749
Jan 202502,56674.324.28$10,979
Dec 202404,31268.993.12$13,459
Nov 202404,92669.052.20$10,830
Oct 202404,43671.372.28$10,120
Sep 202402,12269.612.36$5,017
Aug 202402,87975.632.06$5,941
Jul 202403,98579.932.15$8,554
Jun 202404,26678.082.63$11,237
May 202403,95178.812.20$8,686
Apr 202404,38684.451.66$7,277
Mar 202404,88580.301.55$7,548
Feb 202404,60076.091.78$8,205
Jan 202405,89473.023.30$19,436
Dec 202305,26871.262.61$13,753
Nov 202305,59677.892.81$15,711
Oct 202375,59185.443.09$17,859
Sep 2023225,68689.042.74$17,510
Aug 2023266,70880.522.67$20,023
Jul 2023268,11674.852.64$23,387
Jun 20232510,39768.962.26$25,205
May 20232845770.622.23$2,995
Apr 2023262778.122.24$2,092
Mar 2023252472.852.39$1,879
Feb 2023232475.112.47$1,787
Jan 2023231776.533.39$1,818
Dec 2022221276.415.73$1,750
Nov 2022171285.005.65$1,513
Oct 2022191487.185.86$1,739
Sep 202219784.888.16$1,670
Aug 202223894.529.13$2,247
Jul 2022227101.587.54$2,288
Jun 2022235115.097.98$2,687
May 2022216109.378.43$2,347
Apr 2022184104.226.84$1,903
Mar 2022224108.885.08$2,416
Feb 202246491.054.86$4,208
Jan 202256481.844.54$4,601
Dec 202162071.323.90$4,422
Nov 202164077.435.24$4,956
Oct 202193179.795.71$7,426
Sep 20211038169.865.35$7,629
Aug 2021852166.024.22$5,700
Jul 202187570.783.98$6,178
Jun 20211233469.493.38$8,662
May 2021772,11563.483.02$11,270
Apr 2021742,20760.362.76$10,554
Mar 2021902,15661.302.72$11,375
Feb 2021712,03857.805.55$15,411
Jan 202102,84250.412.81$7,987
Dec 202003,13044.642.68$8,374
Nov 202002,85838.772.71$7,735
Oct 202003,04236.972.48$7,539
Sep 202002,42837.091.99$4,834
Aug 202004,42339.982.39$10,549
Jul 202003,99138.371.83$7,284
Jun 202003,95934.901.69$6,692
May 202004,19416.921.81$7,611
Apr 202003,93814.751.80$7,106
Mar 202004,11830.341.86$7,644
Feb 202003,78949.881.98$7,505
Jan 202004,26857.252.09$8,940
Dec 201904,05159.012.30$9,335
Nov 201903,77155.302.75$10,373
Oct 201903,91953.472.42$9,478
Sep 201903,77755.052.66$10,037
Aug 201903,99153.112.30$9,197
Jul 201904,36656.272.46$10,741
Jun 201904,25452.782.49$10,598
May 201903,95258.482.74$10,830
Apr 201903,86962.632.75$10,642
Mar 201903,99856.803.06$12,242
Feb 201904,07750.852.79$11,384
Jan 201904,34946.033.23$14,039
Dec 201804,64846.594.19$19,454
Nov 201804,77652.934.24$20,237
Oct 201805,09361.443.40$17,306
Sep 201804,96459.543.11$15,428
Aug 201845,33359.403.07$16,592
Jul 2018155,33065.142.93$16,604
Jun 2018125,21560.183.08$16,768
May 2018145,46465.382.90$16,765
Apr 2018145,29763.842.90$16,259
Mar 2018165,39461.222.79$16,012
Feb 201894,85761.782.77$13,991
Jan 2018115,32662.874.01$22,045
Dec 2017165,72757.272.92$17,648
Nov 2017154,70355.423.12$15,497
Oct 2017154,04349.292.98$12,802
Sep 2017174,05947.523.09$13,339
Aug 2017133,93945.373.00$12,424
Jul 201764,81743.873.09$15,135
Jun 201705,10442.493.09$15,757
May 201706,14745.373.26$20,060
Apr 201706,96347.933.21$22,362
Mar 201707,60646.772.98$22,694
Feb 201707,25050.452.95$21,406
Jan 201728,44149.413.42$28,957
Dec 2016368,57048.763.72$33,660
Nov 2016298,04042.492.64$22,493
Oct 2016329,32746.193.09$30,301
Sep 2016339,54841.553.10$30,976
Aug 20163210,14041.442.92$30,979
Jul 2016107,16041.622.92$21,354
Jun 201685,49145.352.69$15,111
May 2016128,06042.521.99$16,558
Apr 20161610,38636.561.99$21,264
Mar 20161610,53233.011.79$19,423
Feb 2016129,26126.472.06$19,429
Jan 201601,38427.352.36$3,272
Dec 201504,30832.362.00$8,622
Nov 201506,30138.792.17$13,656
Oct 201509,16343.552.43$22,235
Sep 201595,49142.992.76$15,533
Aug 20151408,81040.162.87$30,929
Jul 20151359,25248.152.95$33,748
Jun 20151418,82156.152.88$33,347
May 20151146,61155.212.96$25,832
Apr 20151559,29149.822.71$32,869
Mar 20151417,89642.892.93$29,220
Feb 20151206,99144.662.98$26,166
Jan 2015935,22143.433.10$20,227
Dec 20141206,74854.693.59$30,797
Nov 20141216,59670.464.25$36,571
Oct 20141167,05278.303.90$36,592
Sep 20141367,97286.164.05$43,968
Aug 20141167,02089.394.04$38,696
Jul 20141448,50496.564.18$49,448
Jun 20141337,52998.164.74$48,719
May 20141106,12594.734.73$39,370
Apr 20141588,81795.944.81$57,561
Mar 20141457,65595.895.06$52,614
Feb 20141779,17697.406.19$74,058
Jan 20141789,00690.404.86$59,867
Dec 201321110,10591.824.35$63,376
Nov 20131848,92688.853.74$49,716
Oct 201320710,65497.423.78$60,431
Sep 201321111,917104.113.72$66,272
Aug 201321212,262104.253.52$65,295
Jul 201320712,351102.523.72$67,139
Jun 201320411,61894.403.93$64,956
May 20131548,08094.834.15$48,128
Apr 201320310,65293.964.28$64,692
Mar 201320410,56293.623.91$60,426
Feb 201321010,59691.233.42$55,396
Jan 201324512,44891.603.42$65,013
Dec 201223011,68586.773.42$59,922
Nov 201222011,50486.953.62$60,831
Oct 201223512,01889.383.40$61,862
Sep 201223912,55294.672.92$59,258
Aug 201227214,45492.662.91$67,238
Jul 201230715,68685.133.02$73,519
Jun 201232616,16079.822.52$66,729
May 201233415,18491.612.49$68,380
Apr 201236818,315101.652.00$73,979
Mar 201229715,074105.052.22$64,695
Feb 201227313,308101.102.57$61,805
Jan 20121999,39798.092.73$45,212
Dec 201134916,47196.873.24$87,169
Nov 201130615,54495.723.31$80,761
Oct 201138819,05984.983.65$102,510
Sep 201141119,43383.623.99$111,824
Aug 201138518,29783.404.15$108,029
Jul 201138718,80194.144.52$121,361
Jun 201141021,34992.904.64$137,146
May 201144621,79698.134.40$139,773
Apr 201113922,395105.964.33$111,772
Mar 201116427,24496.364.06$126,341
Feb 201114824,14685.644.18$113,605
Jan 201114326,37686.504.59$133,403
Dec 201015127,62885.734.35$133,065
Nov 201018433,98380.843.80$143,851
Oct 201017730,73178.103.51$121,655
Sep 201025442,29972.633.98$186,776
Aug 201026239,75173.684.42$194,978
Jul 201018430,74872.554.74$158,987
Jun 201014826,16170.364.91$138,874
May 201018029,71671.124.24$138,655
Apr 201021536,02381.694.12$166,075
Mar 201024735,60778.394.39$175,630
Feb 201018228,59773.585.44$169,027
Jan 20101834,19774.365.96$205,292
Dec 20092238,26671.445.48$211,413
Nov 20092643,65374.593.75$165,704
Oct 20092646,62872.544.11$193,539
Sep 20092343,37265.543.06$134,432
Aug 20092746,84967.423.22$152,604
Jul 200914351,59761.133.46$187,499
Jun 200914354,33766.163.90$221,104
May 200917967,41654.743.93$274,457
Apr 200920565,38546.773.59$244,157
Mar 200916758,41742.144.06$244,152
Feb 200931946,12532.814.63$224,164
Jan 200943065,67535.865.37$368,160
Dec 200840469,58537.105.98$430,908
Nov 200843676,22755.496.86$547,138
Oct 200848984,86575.246.92$624,226
Sep 200854092,138101.767.88$780,730
Aug 2008575106,029114.228.48$965,123
Jul 2008584112,741131.0811.39$1,360,606
Jun 2008794129,707131.3313.03$1,794,699
May 2008912140,765123.1711.57$1,741,586
Apr 20081,033146,422110.3110.45$1,644,772
Mar 20081,143160,737101.909.66$1,669,845
Feb 20081,181163,08492.538.77$1,539,619
Jan 20081,259167,30490.388.21$1,486,640
Dec 2007846191,02388.337.30$1,469,571
Nov 2007931216,16691.677.29$1,661,562
Oct 20071,146255,76582.856.92$1,865,346
Sep 20071,599288,33975.846.24$1,921,703
Aug 2007726151,51369.066.39$1,017,994
Jul 2007061,29570.906.39$391,549

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                3,361 Mcf  × $  3.05 =    $10,237

────────────────────────────────────────────────────
Month total                                  $10,237

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/229678 is the state's own key, not one this site invented.