Operated by HILCORP ENERGY COMPANY (P-5 386310) in the CHARCO (9900) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 231987District 04Field 171305502 tax incentive programmesCondensateGasSaveExport
Value, all time
$6.3 M
Sep 2007 – May 2026
Value, last 12 filed months
$57 k
at the published price for each month
Months reported
225
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 261 leases and 261 wells, and the rule below applies to all of them.

Discovered
1979-10-23
as the register files it
Field class
Gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2010-11-02.

The Commission's schedule remark for this field reads: PERMITTED/DRILLED/COMPLETED ON THE SAME LEASE.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-03-26180111
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition956 bbl$81,329
GasProduction1,094,184 Mcf$6,193,836
Total$6,275,165

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.0578, -99.1576. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.05777, -99.15760 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,400 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,400 ft.

Completions filed
Jan 2008
1 of 1 wells

1 well

42-505359374010,400 ftJan 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (225)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

225 months

May 202601,239106.413.05$3,774
Apr 202601,18798.932.87$3,406
Mar 202601,24489.753.15$3,918
Feb 202601,12363.503.75$4,212
Jan 202601,25459.138.00$10,029
Dec 202511,25356.664.41$5,587
Nov 202501,23458.593.93$4,845
Oct 202501,29459.383.30$4,276
Sep 202511,28862.743.08$4,026
Aug 202501,39963.933.01$4,218
Jul 202511,31566.743.32$4,426
Jun 202511,27766.483.13$4,062
May 202501,32560.553.23$4,283
Apr 202511,28362.363.54$4,608
Mar 202511,34867.704.27$5,821
Feb 202501,21270.884.34$5,261
Jan 202501,33474.324.28$5,708
Dec 202411,34568.993.12$4,267
Nov 202401,30869.052.20$2,876
Oct 202401,35271.372.28$3,084
Sep 202401,29969.612.36$3,071
Aug 202401,35075.632.06$2,786
Jul 202401,31979.932.15$2,831
Jun 202401,26878.082.63$3,340
May 202401,30878.812.20$2,876
Apr 202401,27284.451.66$2,111
Mar 202401,32380.301.55$2,044
Feb 202401,22876.091.78$2,190
Jan 202401,34373.023.30$4,429
Dec 202301,35671.262.61$3,540
Nov 202301,31477.892.81$3,689
Oct 202301,39785.443.09$4,313
Sep 202301,28389.042.74$3,509
Aug 202301,34580.522.67$3,595
Jul 202301,34474.852.64$3,551
Jun 202301,23468.962.26$2,787
May 202301,28770.622.23$2,867
Apr 202301,25678.122.24$2,811
Mar 202301,26972.852.39$3,037
Feb 202301,17775.112.47$2,902
Jan 202301,28776.533.39$4,360
Dec 202201,28776.415.73$7,373
Nov 202211,30385.005.65$7,442
Oct 202201,36787.185.86$8,016
Sep 202201,32784.888.16$10,833
Aug 202201,36394.529.13$12,440
Jul 202201,394101.587.54$10,514
Jun 202201,338115.097.98$10,673
May 202211,373109.378.43$11,688
Apr 202201,315104.226.84$8,991
Mar 202201,351108.885.08$6,858
Feb 202201,22991.054.86$5,972
Jan 202201,36481.844.54$6,189
Dec 202101,25471.323.90$4,890
Nov 202101,22277.435.24$6,399
Oct 202101,37679.795.71$7,862
Sep 202101,47069.865.35$7,866
Aug 202102,14866.024.22$9,066
Jul 202102,37770.783.98$9,465
Jun 202101,88369.493.38$6,366
May 202101,89163.483.02$5,706
Apr 202101,94660.362.76$5,368
Mar 202102,24361.302.72$6,094
Feb 202101,59157.805.55$8,827
Jan 202101,79850.412.81$5,053
Dec 202001,80544.642.68$4,829
Nov 202001,67438.772.71$4,531
Oct 202001,97636.972.48$4,897
Sep 202001,57237.091.99$3,130
Aug 202001,61739.982.39$3,857
Jul 202002,42238.371.83$4,420
Jun 202002,32334.901.69$3,927
May 202002,22416.921.81$4,036
Apr 202001,83614.751.80$3,313
Mar 202001,92630.341.86$3,575
Feb 202001,78749.881.98$3,539
Jan 202011,89857.252.09$4,033
Dec 201902,01959.012.30$4,653
Nov 201912,02355.302.75$5,620
Oct 201901,85953.472.42$4,496
Sep 201901,80955.052.66$4,807
Aug 201901,92053.112.30$4,424
Jul 201902,03956.272.46$5,016
Jun 201901,84852.782.49$4,604
May 201902,05158.482.74$5,620
Apr 201901,17362.632.75$3,227
Mar 201901,25256.803.06$3,834
Feb 201911,56950.852.79$4,432
Jan 201901,68946.033.23$5,452
Dec 201801,68746.594.19$7,061
Nov 201801,57252.934.24$6,661
Oct 201802,39061.443.40$8,121
Sep 201812,42859.543.11$7,606
Aug 201802,61859.403.07$8,028
Jul 201802,37165.142.93$6,951
Jun 201802,36960.183.08$7,289
May 201812,57565.382.90$7,535
Apr 201811,83263.842.90$5,378
Mar 201801,81061.222.79$5,044
Feb 201811,64161.782.77$4,601
Jan 201811,82662.874.01$7,384
Dec 201701,83957.272.92$5,373
Nov 201701,89755.423.12$5,916
Oct 201702,01849.292.98$6,021
Sep 201701,97047.523.09$6,082
Aug 201702,23345.373.00$6,709
Jul 201702,23743.873.09$6,906
Jun 201712,19842.493.09$6,828
May 201702,31045.373.26$7,538
Apr 201702,48147.933.21$7,968
Mar 201712,19846.772.98$6,605
Feb 201701,62550.452.95$4,798
Jan 201711,80149.413.42$6,207
Dec 201601,73948.763.72$6,474
Nov 201611,72242.492.64$4,596
Oct 201621,83246.193.09$5,754
Sep 201622,47041.553.10$7,742
Aug 201602,81841.442.92$8,241
Jul 201602,57141.622.92$7,518
Jun 2016162,19745.352.69$6,626
May 201612,27242.521.99$4,566
Apr 201602,25436.561.99$4,488
Mar 201612,35033.011.79$4,249
Feb 201602,22126.472.06$4,583
Jan 201602,48127.352.36$5,866
Dec 201512,49932.362.00$5,034
Nov 201502,49138.792.17$5,399
Oct 201512,62743.552.43$6,418
Sep 201512,62742.992.76$7,289
Aug 201552,74240.162.87$8,077
Jul 201592,97048.152.95$9,180
Jun 201573,06656.152.88$9,232
May 201513,12655.212.96$9,294
Apr 201512,39649.822.71$6,535
Mar 201512,96342.892.93$8,738
Feb 201532,91544.662.98$8,810
Jan 201523,19543.433.10$9,993
Dec 201423,19954.693.59$11,598
Nov 201413,28070.464.25$14,017
Oct 201413,82578.303.90$14,999
Sep 201404,11286.164.05$16,635
Aug 201422,43889.394.04$10,016
Jul 201423,28096.564.18$13,902
Jun 2014293,67598.164.74$20,255
May 201402,42394.734.73$11,452
Apr 201432,19495.944.81$10,839
Mar 201412,71895.895.06$13,840
Feb 201472,18697.406.19$14,218
Jan 201402,68690.404.86$13,056
Dec 201352,88491.824.35$13,017
Nov 201392,84388.853.74$11,428
Oct 201303,19697.423.78$12,079
Sep 201343,969104.113.72$15,172
Aug 201303,320104.253.52$11,695
Jul 2013134,046102.523.72$16,375
Jun 201303,44694.403.93$13,555
May 201303,11694.834.15$12,929
Apr 201333,26893.964.28$14,277
Mar 2013103,35393.623.91$14,056
Feb 201303,13891.233.42$10,732
Jan 201373,60191.603.42$12,956
Dec 2012114,12586.773.42$15,063
Nov 201203,98986.953.62$14,460
Oct 2012104,24089.383.40$15,308
Sep 201254,15894.672.92$12,608
Aug 2012124,93692.662.91$15,467
Jul 201203,37685.133.02$10,198
Jun 201204,02779.822.52$10,144
May 2012384,30491.612.49$14,191
Apr 201204,211101.652.00$8,409
Mar 2012114,586105.052.22$11,346
Feb 201204,401101.102.57$11,312
Jan 201204,44098.092.73$12,139
Dec 201194,71096.873.24$16,131
Nov 201104,98795.723.31$16,513
Oct 2011114,45884.983.65$17,200
Sep 201104,81783.623.99$19,200
Aug 2011355,07583.404.15$23,977
Jul 201185,29294.144.52$24,658
Jun 201104,94692.904.64$22,949
May 2011125,29798.134.40$24,510
Apr 2011125,177105.964.33$23,705
Mar 201105,77896.364.06$23,443
Feb 201104,63985.644.18$19,391
Jan 201185,89686.504.59$27,747
Dec 201065,67585.734.35$25,188
Nov 201006,28880.843.80$23,865
Oct 2010105,71978.103.51$20,848
Sep 201006,27072.633.98$24,951
Aug 201085,97773.684.42$27,004
Jul 201006,42772.554.74$30,441
Jun 201086,08370.364.91$30,433
May 201005,74771.124.24$24,340
Apr 2010125,17781.694.12$22,323
Mar 201006,77278.394.39$29,720
Feb 201006,34873.585.44$34,548
Jan 2010387,30574.365.96$46,393
Dec 2009167,36071.445.48$41,503
Nov 200907,41474.593.75$27,814
Oct 200907,88572.544.11$32,409
Sep 2009167,85465.543.06$25,119
Aug 200908,42967.423.22$27,129
Jul 200908,72961.133.46$30,242
Jun 200908,88766.163.90$34,615
May 200909,76754.743.93$38,343
Apr 2009249,13946.773.59$33,909
Mar 200909,82942.144.06$39,896
Feb 2009169,10532.814.63$42,708
Jan 2009010,91035.865.37$58,598
Dec 2008011,76037.105.98$70,291
Nov 20088612,38855.496.86$89,758
Oct 20081514,09775.246.92$98,708
Sep 2008014,925101.767.88$117,566
Aug 2008013,413114.228.48$113,783
Jul 2008015,284131.0811.39$174,076
Jun 2008016,836131.3313.03$219,417
May 200810820,753123.1711.57$253,504
Apr 20083422,427110.3110.45$238,222
Mar 2008033,744101.909.66$326,104
Feb 20081940,79692.538.77$359,563
Jan 200818421,41490.388.21$192,347
Dec 2007042,69188.337.30$311,728
Nov 2007086,59291.677.29$631,403
Oct 20070115,04382.856.92$796,325
Sep 20070075.846.24$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                1,239 Mcf  × $  3.05 =     $3,774

────────────────────────────────────────────────────
Month total                                   $3,774

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/231987 is the state's own key, not one this site invented.