SOUTH CALLAGHAN RANCH

Operated by ALDINE OIL AND GAS, LP (P-5 100397) in the BECCERO CREEK (LOBO CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 233060District 04Field 065852002 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.7 M
Oct 2007 – May 2026
Value, last 12 filed months
$10 k
at the published price for each month
Months reported
224
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 247 leases and 247 wells, and the rule below applies to all of them.

Discovered
2008-01-28
as the register files it
Field class
Gas
the register's own label
Between wells
0 ft
minimum
From a lease line
150 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2008-01-28.

The Commission's schedule remark for this field reads: NO BETWEEN WELL SPACING. ALLOCATION FORMULA SUSPENDED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-08-18184948
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,081 bbl$89,883
GasProduction231,900 Mcf$1,568,201
Total$1,658,085

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.6853, -99.2630. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.68531, -99.26304 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
7,910 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,910 ft.

Completions filed
Oct 2007
1 of 1 wells

1 well

42-479399282767,910 ftOct 2007

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (224)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

224 months

May 20262174106.413.05$743
Apr 2026215698.932.87$646
Mar 2026217089.753.15$715
Feb 2026016163.503.75$604
Jan 2026220059.138.00$1,718
Dec 2025016556.664.41$728
Nov 2025220258.593.93$910
Oct 2025219559.383.30$763
Sep 2025218862.743.08$704
Aug 2025019863.933.01$597
Jul 2025219466.743.32$777
Jun 2025218566.483.13$712
May 2025119460.553.23$688
Apr 2025019462.363.54$687
Mar 2025115367.704.27$721
Feb 2025016270.884.34$703
Jan 202504374.324.28$184
Dec 202404868.993.12$150
Nov 202404469.052.20$97
Oct 202404071.372.28$91
Sep 202403269.612.36$76
Aug 202403575.632.06$72
Jul 202404379.932.15$92
Jun 202403978.082.63$103
May 202404478.812.20$97
Apr 202403584.451.66$58
Mar 202403480.301.55$53
Feb 202403176.091.78$55
Jan 202401473.023.30$46
Dec 202302771.262.61$70
Nov 202303477.892.81$95
Oct 20230885.443.09$25
Sep 202304189.042.74$112
Aug 202304780.522.67$126
Jul 2023012074.852.64$317
Jun 202307268.962.26$163
May 202305370.622.23$118
Apr 202303978.122.24$87
Mar 202307072.852.39$168
Feb 202306375.112.47$155
Jan 2023010776.533.39$362
Dec 2022013976.415.73$796
Nov 202207585.005.65$423
Oct 202204087.185.86$235
Sep 202206784.888.16$547
Aug 202208094.529.13$730
Jul 2022041101.587.54$309
Jun 20220131115.097.98$1,045
May 2022055109.378.43$464
Apr 2022042104.226.84$287
Mar 20220160108.885.08$812
Feb 202209891.054.86$476
Jan 2022017881.844.54$808
Dec 202105071.323.90$195
Nov 2021011077.435.24$576
Oct 202107579.795.71$429
Sep 202102869.865.35$150
Aug 2021014666.024.22$616
Jul 2021026070.783.98$1,035
Jun 2021014869.493.38$500
May 2021513963.483.02$737
Apr 2021411760.362.76$564
Mar 2021017461.302.72$473
Feb 2021015057.805.55$832
Jan 2021015450.412.81$433
Dec 202006944.642.68$185
Nov 2020018838.772.71$509
Oct 202009436.972.48$233
Sep 202008537.091.99$169
Aug 2020018039.982.39$429
Jul 202007638.371.83$139
Jun 2020022134.901.69$374
May 2020011616.921.81$211
Apr 2020020814.751.80$375
Mar 2020017730.341.86$329
Feb 2020017349.881.98$343
Jan 2020023957.252.09$501
Dec 2019027759.012.30$638
Nov 2019016455.302.75$451
Oct 2019022753.472.42$549
Sep 2019015555.052.66$412
Aug 201907153.112.30$164
Jul 2019177856.272.46$1,148
Jun 2019537352.782.49$2,979
May 2019189558.482.74$1,313
Apr 201909262.632.75$253
Mar 2019014556.803.06$444
Feb 2019010050.852.79$279
Jan 2019012646.033.23$407
Dec 2018015446.594.19$645
Nov 2018015152.934.24$640
Oct 2018016061.443.40$544
Sep 2018013259.543.11$410
Aug 2018017359.403.07$531
Jul 2018016665.142.93$487
Jun 2018020060.183.08$615
May 2018023065.382.90$667
Apr 2018020163.842.90$583
Mar 2018016461.222.79$457
Feb 2018017861.782.77$492
Jan 2018019462.874.01$778
Dec 2017018257.272.92$532
Nov 2017021255.423.12$661
Oct 2017023249.292.98$692
Sep 2017013547.523.09$417
Aug 2017012245.373.00$367
Jul 2017021243.873.09$655
Jun 2017021742.493.09$670
May 2017022245.373.26$724
Apr 2017021747.933.21$697
Mar 2017022546.772.98$671
Feb 2017019350.452.95$570
Jan 2017024149.413.42$824
Dec 2016025648.763.72$953
Nov 2016023142.492.64$611
Oct 2016027846.193.09$859
Sep 2016020241.553.10$626
Aug 2016024541.442.92$716
Jul 2016025241.622.92$737
Jun 2016127945.352.69$795
May 2016217742.521.99$437
Apr 2016324436.561.99$595
Mar 2016027233.011.79$488
Feb 2016127926.472.06$602
Jan 2016333527.352.36$874
Dec 2015127432.362.00$581
Nov 2015124338.792.17$565
Oct 2015125143.552.43$653
Sep 2015124442.992.76$716
Aug 2015129440.162.87$885
Jul 2015124748.152.95$776
Jun 2015024756.152.88$712
May 201515855.212.96$227
Apr 2015223449.822.71$733
Mar 2015125742.892.93$797
Feb 2015322344.662.98$798
Jan 2015126143.433.10$853
Dec 2014327554.693.59$1,152
Nov 2014127170.464.25$1,223
Oct 2014129578.303.90$1,229
Sep 2014126186.164.05$1,142
Aug 2014129989.394.04$1,296
Jul 2014125696.564.18$1,167
Jun 2014122898.164.74$1,178
May 2014332994.734.73$1,839
Apr 2014130295.944.81$1,548
Mar 2014227495.895.06$1,577
Feb 2014216697.406.19$1,223
Jan 2014120690.404.86$1,092
Dec 2013121091.824.35$1,006
Nov 2013329788.853.74$1,377
Oct 2013135897.423.78$1,450
Sep 20133546104.113.72$2,342
Aug 20133394104.253.52$1,701
Jul 20134457102.523.72$2,109
Jun 2013245594.403.93$1,979
May 2013248894.834.15$2,214
Apr 2013243593.964.28$2,051
Mar 2013242893.623.91$1,862
Feb 2013241091.233.42$1,585
Jan 2013247091.603.42$1,791
Dec 2012245986.773.42$1,743
Nov 2012345886.953.62$1,921
Oct 2012348789.383.40$1,924
Sep 2012349594.672.92$1,729
Aug 2012350892.662.91$1,755
Jul 2012254985.133.02$1,829
Jun 2012249679.822.52$1,409
May 2012236091.612.49$1,079
Apr 20121184101.652.00$469
Mar 20121149105.052.22$436
Feb 20121192101.102.57$595
Jan 2012225298.092.73$885
Dec 2011227796.873.24$1,091
Nov 2011117395.723.31$669
Oct 2011214384.983.65$692
Sep 2011347283.623.99$2,132
Aug 2011450783.404.15$2,437
Jul 2011350194.144.52$2,546
Jun 2011350192.904.64$2,603
May 2011448898.134.40$2,542
Apr 20114331105.964.33$1,858
Mar 2011448596.364.06$2,353
Feb 2011244085.644.18$2,010
Jan 2011347786.504.59$2,448
Dec 2010449085.734.35$2,473
Nov 2010235880.843.80$1,520
Oct 2010449578.103.51$2,049
Sep 2010344072.633.98$1,969
Aug 2010367473.684.42$3,200
Jul 201051,02572.554.74$5,218
Jun 201061,06270.364.91$5,637
May 201091,39671.124.24$6,552
Apr 201061,03081.694.12$4,737
Mar 2010568378.394.39$3,389
Feb 2010688573.585.44$5,258
Jan 2010572774.365.96$4,708
Dec 2009779271.445.48$4,843
Nov 200971,19274.593.75$4,994
Oct 200981,11572.544.11$5,163
Sep 200981,31665.543.06$4,558
Aug 200971,14967.423.22$4,170
Jul 200991,29661.133.46$5,040
Jun 2009111,55566.163.90$6,784
May 2009111,43654.743.93$6,240
Apr 2009131,55246.773.59$6,176
Mar 2009182,02642.144.06$8,982
Feb 2009192,12532.814.63$10,469
Jan 2009151,71835.865.37$9,765
Dec 2008222,57937.105.98$16,231
Nov 2008121,39455.496.86$10,229
Oct 2008192,26975.246.92$17,136
Sep 2008263,749101.767.88$32,177
Aug 2008192,721114.228.48$25,252
Jul 2008273,631131.0811.39$44,894
Jun 2008222,962131.3313.03$41,492
May 2008363,651123.1711.57$46,692
Apr 2008626,773110.3110.45$77,650
Mar 2008476,094101.909.66$63,682
Feb 200809,61192.538.77$84,294
Jan 2008014,90290.388.21$122,282
Dec 2007029,60488.337.30$216,168
Nov 200718755,69191.677.29$423,224
Oct 200716521,70282.856.92$163,891

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             2 bbl  × $106.41 =       $213
Gas                  174 Mcf  × $  3.05 =       $530

────────────────────────────────────────────────────
Month total                                     $743

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/233060 is the state's own key, not one this site invented.