RAMIREZ, ABEL

Operated by HILCORP ENERGY COMPANY (P-5 386310) in the FLORES, W. (PERDIDO) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 233352District 04Field 315457002 tax incentive programmesGasSaveExport
Value, all time
$186 k
Dec 2006 – May 2026
Value, last 12 filed months
$10 k
at the published price for each month
Months reported
234
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 24 leases and 24 wells, and the rule below applies to all of them.

Discovered
1982-10-08
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ADMIN. APPROVAL OF SUSPENSION OF ALLOC. FORMULA EFFECTIVE 7-1-92

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-05-27183038
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction45,541 Mcf$186,018
Total$186,018

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 26.9774, -99.2003. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

26.97743, -99.20031 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,000 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,000 ft.

Completions filed
Dec 2006
1 of 1 wells

1 well

42-50535666129,000 ftDec 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (234)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

234 months

May 2026200106.413.05$609
Apr 202628198.932.87$806
Mar 202613389.753.15$419
Feb 202624963.503.75$934
Jan 202625759.138.00$2,055
Dec 202515156.664.41$666
Nov 202535558.593.93$1,394
Oct 202514059.383.30$463
Sep 202527762.743.08$852
Aug 202527863.933.01$838
Jul 202511966.743.32$395
Jun 202523466.483.13$732
May 202529860.553.23$963
Apr 202522562.363.54$797
Mar 202526067.704.27$1,110
Feb 20251270.884.34$52
Jan 20258574.324.28$364
Dec 2024568.993.12$16
Nov 2024069.052.20$0
Oct 202413971.372.28$317
Sep 202411269.612.36$265
Aug 20249175.632.06$188
Jul 202413879.932.15$296
Jun 20246678.082.63$174
May 202412278.812.20$268
Apr 202411184.451.66$184
Mar 20248080.301.55$124
Feb 20247976.091.78$141
Jan 202414373.023.30$472
Dec 20238171.262.61$211
Nov 202310377.892.81$289
Oct 20238885.443.09$272
Sep 202312189.042.74$331
Aug 202312780.522.67$339
Jul 202315874.852.64$417
Jun 202319868.962.26$447
May 20238170.622.23$180
Apr 20238778.122.24$195
Mar 202317672.852.39$421
Feb 202316975.112.47$417
Jan 20237476.533.39$251
Dec 20229876.415.73$561
Nov 20226985.005.65$390
Oct 202215987.185.86$932
Sep 20229684.888.16$784
Aug 202211194.529.13$1,013
Jul 2022319101.587.54$2,406
Jun 2022154115.097.98$1,228
May 2022100109.378.43$843
Apr 202244104.226.84$301
Mar 202275108.885.08$381
Feb 20226391.054.86$306
Jan 20226481.844.54$290
Dec 20216471.323.90$250
Nov 20217177.435.24$372
Oct 202113579.795.71$771
Sep 202113569.865.35$722
Aug 20216766.024.22$283
Jul 20217070.783.98$279
Jun 20216269.493.38$210
May 20216463.483.02$193
Apr 20216860.362.76$188
Mar 2021161.302.72$3
Feb 20215857.805.55$322
Jan 20216250.412.81$174
Dec 20206644.642.68$177
Nov 20206738.772.71$181
Oct 20206536.972.48$161
Sep 20205537.091.99$110
Aug 20206439.982.39$153
Jul 20208338.371.83$151
Jun 20208034.901.69$135
May 20208216.921.81$149
Apr 202010714.751.80$193
Mar 20206330.341.86$117
Feb 20206049.881.98$119
Jan 20206257.252.09$130
Dec 20196659.012.30$152
Nov 20196755.302.75$184
Oct 20196753.472.42$162
Sep 20196955.052.66$183
Aug 20197553.112.30$173
Jul 20197656.272.46$187
Jun 20198252.782.49$204
May 20199358.482.74$255
Apr 2019062.632.75$0
Mar 20197656.803.06$233
Feb 20198350.852.79$232
Jan 20196746.033.23$216
Dec 20188346.594.19$347
Nov 2018652.934.24$25
Oct 20187261.443.40$245
Sep 20188559.543.11$264
Aug 20189059.403.07$276
Jul 20188065.142.93$235
Jun 20188260.183.08$252
May 2018665.382.90$17
Apr 20188363.842.90$241
Mar 201810861.222.79$301
Feb 20187661.782.77$210
Jan 20187562.874.01$301
Dec 20178157.272.92$237
Nov 20177955.423.12$246
Oct 20177249.292.98$215
Sep 201711047.523.09$340
Aug 201711945.373.00$358
Jul 201714243.873.09$438
Jun 20173642.493.09$111
May 20174945.373.26$160
Apr 20176747.933.21$215
Mar 201722646.772.98$674
Feb 201718150.452.95$534
Jan 201723649.413.42$807
Dec 201626148.763.72$972
Nov 201619742.492.64$521
Oct 201619546.193.09$603
Sep 201617141.553.10$530
Aug 201619341.442.92$564
Jul 201618841.622.92$550
Jun 201620745.352.69$556
May 201623742.521.99$472
Apr 201625436.561.99$506
Mar 201626833.011.79$481
Feb 201628626.472.06$590
Jan 201626827.352.36$634
Dec 201529332.362.00$586
Nov 201530138.792.17$652
Oct 201534043.552.43$825
Sep 201538442.992.76$1,059
Aug 201528440.162.87$816
Jul 201525248.152.95$742
Jun 201527856.152.88$801
May 201532255.212.96$952
Apr 201531349.822.71$847
Mar 201527142.892.93$795
Feb 201525444.662.98$756
Jan 201530743.433.10$952
Dec 201433154.693.59$1,189
Nov 201432070.464.25$1,361
Oct 201438378.303.90$1,494
Sep 201434186.164.05$1,380
Aug 201432489.394.04$1,307
Jul 201444796.564.18$1,868
Jun 201423998.164.74$1,132
May 201423294.734.73$1,097
Apr 201420895.944.81$1,000
Mar 201434195.895.06$1,724
Feb 201432097.406.19$1,981
Jan 201445690.404.86$2,216
Dec 201354191.824.35$2,356
Nov 201329288.853.74$1,092
Oct 201329297.423.78$1,104
Sep 2013279104.113.72$1,037
Aug 2013279104.253.52$983
Jul 2013306102.523.72$1,138
Jun 201328194.403.93$1,105
May 201340594.834.15$1,680
Apr 201329293.964.28$1,251
Mar 201334693.623.91$1,354
Feb 201342991.233.42$1,467
Jan 201365891.603.42$2,250
Dec 20125486.773.42$185
Nov 201229386.953.62$1,062
Oct 201229789.383.40$1,010
Sep 201225994.672.92$756
Aug 201224492.662.91$710
Jul 201230685.133.02$924
Jun 201230079.822.52$756
May 201231691.612.49$786
Apr 2012306101.652.00$611
Mar 2012306105.052.22$680
Feb 2012279101.102.57$717
Jan 201232298.092.73$880
Dec 201137896.873.24$1,225
Nov 201130295.723.31$1,000
Oct 201151584.983.65$1,879
Sep 201136683.623.99$1,459
Aug 201143783.404.15$1,813
Jul 201140794.144.52$1,839
Jun 201147392.904.64$2,195
May 201145098.134.40$1,982
Apr 2011670105.964.33$2,903
Mar 201139396.364.06$1,595
Feb 201140785.644.18$1,701
Jan 201130886.504.59$1,413
Dec 201025285.734.35$1,096
Nov 201042180.843.80$1,598
Oct 201035078.103.51$1,228
Sep 201023172.633.98$919
Aug 201022273.684.42$981
Jul 201013172.554.74$620
Jun 20107470.364.91$363
May 20106471.124.24$271
Apr 201012681.694.12$519
Mar 201011078.394.39$483
Feb 201011073.585.44$599
Jan 201016674.365.96$990
Dec 200912371.445.48$675
Nov 200914274.593.75$533
Oct 200912672.544.11$518
Sep 20098965.543.06$273
Aug 200911767.423.22$377
Jul 200928561.133.46$987
Jun 200930266.163.90$1,176
May 200925054.743.93$981
Apr 200926946.773.59$965
Mar 200919142.144.06$775
Feb 200916532.814.63$764
Jan 200923135.865.37$1,241
Dec 200838437.105.98$2,295
Nov 2008055.496.86$0
Oct 2008075.246.92$0
Sep 20080101.767.88$0
Aug 200818114.228.48$153
Jul 200813131.0811.39$148
Jun 200812131.3313.03$156
May 200823123.1711.57$266
Apr 200881110.3110.45$847
Mar 200864101.909.66$619
Feb 200816392.538.77$1,430
Jan 20089590.388.21$780
Dec 200718188.337.30$1,322
Nov 200723091.677.29$1,677
Oct 200727482.856.92$1,897
Sep 200716375.846.24$1,018
Aug 200732769.066.39$2,089
Jul 200731070.906.39$1,980
Jun 200734062.007.55$2,566
May 200752158.747.85$4,088
Apr 200755959.617.81$4,363
Mar 200740456.927.30$2,950
Feb 200739855.108.22$3,270
Jan 200730150.306.73$2,025
Dec 200684856.656.92$5,867

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Gas                  200 Mcf  × $  3.05 =       $609

────────────────────────────────────────────────────
Month total                                     $609

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/233352 is the state's own key, not one this site invented.