SLATOR RANCH

Operated by MOUNTAIN V TEXAS, LLC (P-5 103601) in the STIRLING (WILCOX CONSOLIDATED) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 235078District 04Field 861824762 tax incentive programmesCondensateGasSaveExport
Value, all time
$7.2 M
Feb 2008 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
220
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 92 leases and 92 wells, and the rule below applies to all of them.

Discovered
2006-01-10
as the register files it
Field class
Gas
the register's own label
Between wells
0 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2007-01-23.

The Commission's schedule remark for this field reads: NO BETWEEN WELL SPACING. STANDARD 40 ACRES.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112008-11-05184873
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,538 bbl$128,682
GasProduction1,234,928 Mcf$7,074,635
Total$7,203,317

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.2586, -99.1180. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.25858, -99.11804 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,100 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,100 ft.

Completions filed
Feb 2008
1 of 1 wells

1 well

42-50535976S 511,100 ftFeb 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (220)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

220 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 2021094461.302.72$2,565
Feb 2021047457.805.55$2,630
Jan 202101,50050.412.81$4,215
Dec 202002,73644.642.68$7,320
Nov 202002,77738.772.71$7,516
Oct 202032,96736.972.48$7,464
Sep 202002,96537.091.99$5,903
Aug 202003,22739.982.39$7,697
Jul 202003,03338.371.83$5,536
Jun 202003,31134.901.69$5,597
May 202003,61916.921.81$6,568
Apr 202003,90414.751.80$7,044
Mar 202004,44430.341.86$8,249
Feb 202002,71649.881.98$5,380
Jan 202002,64957.252.09$5,549
Dec 201902,44959.012.30$5,643
Nov 201902,04255.302.75$5,617
Oct 201901,88153.472.42$4,549
Sep 201902,30255.052.66$6,117
Aug 201903,19853.112.30$7,369
Jul 201903,65656.272.46$8,994
Jun 201902,08852.782.49$5,202
May 201902,50458.482.74$6,862
Apr 201902,65362.632.75$7,298
Mar 201903,11156.803.06$9,526
Feb 201902,82250.852.79$7,880
Jan 201903,20646.033.23$10,350
Dec 201802,33746.594.19$9,781
Nov 201801,65452.934.24$7,008
Oct 201801,93261.443.40$6,565
Sep 201802,71759.543.11$8,444
Aug 201801,35759.403.07$4,161
Jul 201802,12065.142.93$6,216
Jun 2018142,27860.183.08$7,852
May 201802,64065.382.90$7,658
Apr 201802,94563.842.90$8,543
Mar 201803,33161.222.79$9,283
Feb 201804,73561.782.77$13,098
Jan 201804,48562.874.01$17,982
Dec 201704,21857.272.92$12,323
Nov 2017103,26855.423.12$10,745
Oct 201704,09049.292.98$12,203
Sep 201702,92647.523.09$9,033
Aug 201703,25845.373.00$9,788
Jul 201703,10043.873.09$9,571
Jun 201702,52542.493.09$7,795
May 201702,61745.373.26$8,540
Apr 201702,79747.933.21$8,983
Mar 201702,39246.772.98$7,137
Feb 201702,49050.452.95$7,352
Jan 201704,10749.413.42$14,041
Dec 2016312,58648.763.72$11,139
Nov 201603,40142.492.64$8,993
Oct 201603,11646.193.09$9,629
Sep 201603,08041.553.10$9,550
Aug 201603,21141.442.92$9,390
Jul 201603,59941.622.92$10,525
Jun 2016123,32545.352.69$9,475
May 201603,64942.521.99$7,265
Apr 201603,10236.561.99$6,176
Mar 2016153,76033.011.79$7,241
Feb 201603,15026.472.06$6,500
Jan 201603,85627.352.36$9,117
Dec 201502,84632.362.00$5,696
Nov 201503,17738.792.17$6,886
Oct 2015123,85843.552.43$9,884
Sep 201503,63942.992.76$10,038
Aug 201504,28740.162.87$12,314
Jul 2015114,32548.152.95$13,267
Jun 201503,74456.152.88$10,793
May 201504,53355.212.96$13,397
Apr 201504,28949.822.71$11,608
Mar 201584,52742.892.93$13,629
Feb 201503,90644.662.98$11,625
Jan 201593,91043.433.10$12,514
Dec 201404,97654.693.59$17,871
Nov 201404,29870.464.25$18,274
Oct 201444,45378.303.90$17,684
Sep 201404,13386.164.05$16,720
Aug 201484,67289.394.04$19,567
Jul 201405,40996.564.18$22,607
Jun 201403,79798.164.74$17,986
May 2014135,23694.734.73$25,980
Apr 201404,25095.944.81$20,439
Mar 201405,04895.895.06$25,527
Feb 2014154,37197.406.19$28,526
Jan 201405,01890.404.86$24,391
Dec 2013214,82991.824.35$22,956
Nov 201304,30288.853.74$16,082
Oct 201305,00797.423.78$18,923
Sep 201304,930104.113.72$18,328
Aug 2013285,561104.253.52$22,508
Jul 201304,780102.523.72$17,771
Jun 201304,76694.403.93$18,747
May 201305,33194.834.15$22,119
Apr 2013235,11893.964.28$24,079
Mar 201305,76093.623.91$22,538
Feb 201304,87891.233.42$16,682
Jan 201305,23391.603.42$17,896
Dec 2012134,93286.773.42$17,996
Nov 201205,01286.953.62$18,168
Oct 2012105,66589.383.40$20,153
Sep 201205,61094.672.92$16,372
Aug 201205,70592.662.91$16,591
Jul 201205,51085.133.02$16,645
Jun 201235,56579.822.52$14,258
May 201205,69491.612.49$14,168
Apr 201205,204101.652.00$10,391
Mar 201206,362105.052.22$14,137
Feb 201206,012101.102.57$15,452
Jan 201217,00698.092.73$19,253
Dec 201106,97396.873.24$22,591
Nov 201109,38195.723.31$31,063
Oct 201125,99684.983.65$22,047
Sep 201104,56483.623.99$18,191
Aug 2011105,29183.404.15$22,788
Jul 201107,37094.144.52$33,292
Jun 2011106,38592.904.64$30,555
May 201188,31598.134.40$37,411
Apr 201107,391105.964.33$32,027
Mar 201197,83296.364.06$32,644
Feb 2011127,33685.644.18$31,692
Jan 2011118,89486.504.59$41,764
Dec 2010219,45285.734.35$42,895
Nov 2010119,43680.843.80$36,702
Oct 2010198,10278.103.51$29,913
Sep 201099,60072.633.98$38,857
Aug 2010119,28573.684.42$41,844
Jul 2010410,04272.554.74$47,854
Jun 201029,82570.364.91$48,385
May 2010410,23371.124.24$43,623
Apr 2010610,69981.694.12$44,599
Mar 20101410,25578.394.39$46,103
Feb 201009,64573.585.44$52,492
Jan 2010510,93474.365.96$65,583
Dec 20091012,39371.445.48$68,675
Nov 2009011,70174.593.75$43,896
Oct 2009513,19072.544.11$54,577
Sep 2009013,38965.543.06$41,034
Aug 20092713,07767.423.22$43,909
Jul 20092215,05061.133.46$53,486
Jun 20092113,78866.163.90$55,094
May 20092215,47054.743.93$61,936
Apr 20092416,03746.773.59$58,655
Mar 20094916,71542.144.06$69,911
Feb 20092716,01532.814.63$75,083
Jan 20096619,49435.865.37$107,069
Dec 20083821,46737.105.98$129,721
Nov 200812322,22655.496.86$159,304
Oct 2008025,17075.246.92$174,226
Sep 20084327,482101.767.88$220,854
Aug 20087228,469114.228.48$249,727
Jul 20086731,736131.0811.39$370,237
Jun 20083436,069131.3313.03$474,539
May 20087338,871123.1711.57$458,896
Apr 200813946,835110.3110.45$504,986
Mar 200817269,681101.909.66$690,929
Feb 20087292,56192.538.77$818,476

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2021 — as filed, then multipliedworked
Condensate             0 bbl  × $ 61.30 =         $0
Gas                  944 Mcf  × $  2.72 =     $2,565

────────────────────────────────────────────────────
Month total                                   $2,565

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/235078 is the state's own key, not one this site invented.