GUERRA TRUST

Operated by DEWBRE PETROLEUM CORPORATION (P-5 216748) in the SANTELLANA, SOUTH (FRIO, VKSBG) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 248790District 04Field 80947040CondensateGasSaveExport
Value, all time
$2.4 M
Sep 2008 – Jun 2023
Value, last 12 filed months
$0
at the published price for each month
Months reported
172
6 months not filed
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 36 leases and 36 wells, and the rule below applies to all of them.

Discovered
1999-07-27
as the register files it
Field class
Gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1999-11-01.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 04/01/2000.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition349 bbl$22,280
GasProduction599,453 Mcf$2,400,014
Total$2,422,295

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 26.5693, -98.2079. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

26.56931, -98.20787 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
9,000 ft
1 wells filed one
Completion to plug
13.2 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,000 ft.

Completions filed
Apr 2009
1 of 1 wells
Plug dates filed
Jun 2022
1 of 1 wells

Last completion to plug: a median of 13.2 years across the 1 well that filed both dates, with the middle half between 13.2 years and 13.2 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2153387819,000 ftApr 2009Jun 2022Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (172)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

172 months

Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 201806165.142.93$179
Jun 2018075960.183.08$2,335
May 201804,55165.382.90$13,202
Apr 201834915,45563.842.90$67,112
Mar 201807,80561.222.79$21,751
Feb 2018035961.782.77$993
Jan 2018085062.874.01$3,408
Dec 201701,40757.272.92$4,111
Nov 2017088155.423.12$2,747
Oct 2017079149.292.98$2,360
Sep 201701,00247.523.09$3,093
Aug 201701,00445.373.00$3,016
Jul 2017079543.873.09$2,454
Jun 2017099742.493.09$3,078
May 201701,37045.373.26$4,471
Apr 201701,13547.933.21$3,645
Mar 201701,42146.772.98$4,240
Feb 201701,38650.452.95$4,092
Jan 201701,51649.413.42$5,183
Dec 201601,56148.763.72$5,811
Nov 201601,52642.492.64$4,035
Oct 201601,27046.193.09$3,925
Sep 2016059141.553.10$1,832
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 201604645.352.69$124
May 2016011942.521.99$237
Apr 2016011436.561.99$227
Mar 2016014533.011.79$260
Feb 2016010126.472.06$208
Jan 2016014427.352.36$340
Dec 2015022532.362.00$450
Nov 2015098238.792.17$2,128
Oct 201501,06243.552.43$2,577
Sep 201501,09442.992.76$3,018
Aug 201501,31140.162.87$3,766
Jul 201501,16048.152.95$3,416
Jun 201501,29456.152.88$3,730
May 201501,48355.212.96$4,383
Apr 201501,66849.822.71$4,515
Mar 201501,69942.892.93$4,986
Feb 201501,39044.662.98$4,137
Jan 201501,24843.433.10$3,870
Dec 201401,38454.693.59$4,970
Nov 201401,55470.464.25$6,607
Oct 201401,92978.303.90$7,525
Sep 201401,73286.164.05$7,007
Aug 201402,23289.394.04$9,006
Jul 201405,59796.564.18$23,393
Jun 201405,67598.164.74$26,882
May 201402,86794.734.73$13,551
Apr 201401,57595.944.81$7,574
Mar 201401,42295.895.06$7,191
Feb 201401,48497.406.19$9,189
Jan 201401,02390.404.86$4,973
Dec 201301,65491.824.35$7,202
Nov 201301,51988.853.74$5,678
Oct 201301,11097.423.78$4,195
Sep 201301,876104.113.72$6,974
Aug 201301,787104.253.52$6,295
Jul 201301,949102.523.72$7,246
Jun 201302,00594.403.93$7,886
May 201302,09994.834.15$8,709
Apr 201301,92493.964.28$8,240
Mar 201302,18193.623.91$8,534
Feb 201302,03591.233.42$6,960
Jan 201302,39791.603.42$8,198
Dec 201202,15286.773.42$7,360
Nov 201202,49286.953.62$9,033
Oct 201202,82989.383.40$9,618
Sep 201202,92394.672.92$8,530
Aug 201203,34392.662.91$9,722
Jul 201203,00785.133.02$9,084
Jun 201203,62079.822.52$9,119
May 201203,82191.612.49$9,508
Apr 201204,062101.652.00$8,111
Mar 201204,278105.052.22$9,506
Feb 201204,025101.102.57$10,345
Jan 201204,39398.092.73$12,011
Dec 201104,99996.873.24$16,195
Nov 201104,54995.723.31$15,063
Oct 201105,47384.983.65$19,968
Sep 201106,24383.623.99$24,883
Aug 201108,41183.404.15$34,900
Jul 201105,60794.144.52$25,328
Jun 201108,96092.904.64$41,573
May 2011010,43698.134.40$45,969
Apr 2011011,910105.964.33$51,609
Mar 201108,52696.364.06$34,593
Feb 201109,06385.644.18$37,883
Jan 2011010,60186.504.59$48,646
Dec 2010011,01485.734.35$47,886
Nov 2010011,15780.843.80$42,345
Oct 2010013,29678.103.51$46,654
Sep 2010013,85472.633.98$55,132
Aug 2010015,40673.684.42$68,085
Jul 2010016,15372.554.74$76,509
Jun 2010016,69870.364.91$81,994
May 2010019,57971.124.24$82,921
Apr 2010019,66381.694.12$81,064
Mar 2010020,03478.394.39$87,923
Feb 2010020,43173.585.44$111,193
Jan 2010021,26074.365.96$126,797
Dec 2009018,50271.445.48$101,460
Nov 2009020,13874.593.75$75,548
Oct 2009011,30072.544.11$46,446
Sep 2009010,54765.543.06$32,324
Aug 2009022,66767.423.22$72,954
Jul 2009018,83161.133.46$65,240
Jun 2009021,08066.163.90$82,107
May 2009022,67554.743.93$89,016
Apr 200904,65746.773.59$16,707
Sep 200800101.767.88$0

Not filed, and not zero: Oct 2008 – Mar 2009 (6 months). The Railroad Commission holds no report for those months, so this page shows none — a zero would state that the lease produced nothing.

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2018 — as filed, then multipliedworked
Condensate             0 bbl  × $ 65.14 =         $0
Gas                   61 Mcf  × $  2.93 =       $179

────────────────────────────────────────────────────
Month total                                     $179

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/248790 is the state's own key, not one this site invented.