NOSER

Operated by MIRAMAR PETROLEUM, INC. (P-5 570385) in the HIDALGO (8027) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 264092District 04Field 41078984CondensateGasSaveExport
Value, all time
$868 k
May 2011 – May 2017
Value, last 12 filed months
$0
at the published price for each month
Months reported
73
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 5 leases and 5 wells, and the rule below applies to all of them.

Discovered
1984-07-12
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFFECTIVE 10/01/92.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,413 bbl$130,481
GasProduction195,267 Mcf$737,727
Total$868,208

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 26.1254, -98.2415. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

26.12535, -98.24153 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
8,500 ft
1 wells filed one
Completion to plug
2.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,500 ft.

Completions filed
May 2013
1 of 1 wells
Plug dates filed
Aug 2015
1 of 1 wells

Last completion to plug: a median of 2.3 years across the 1 well that filed both dates, with the middle half between 2.3 years and 2.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2153400638,500 ftMay 2013Aug 2015Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (73)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

73 months

May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 201577048.152.95$3,708
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140970.464.25$38
Oct 2014023878.303.90$928
Sep 201401,18286.164.05$4,782
Aug 20141751,28489.394.04$20,824
Jul 201406196.564.18$255
Jun 201402,78798.164.74$13,202
May 201403,57194.734.73$16,879
Apr 20141463,63595.944.81$31,488
Mar 201404,02995.895.06$20,374
Feb 201402,79997.406.19$17,331
Jan 20141453,80890.404.86$31,618
Dec 201303,69391.824.35$16,081
Nov 201303,64788.853.74$13,634
Oct 20131814,75697.423.78$35,608
Sep 201304,865104.113.72$18,087
Aug 20131605,617104.253.52$36,467
Jul 20131866,791102.523.72$44,316
Jun 201318111,04894.403.93$60,543
May 201306,72794.834.15$27,911
Apr 2013075993.964.28$3,250
Mar 2013096493.623.91$3,772
Feb 201301,34491.233.42$4,596
Jan 201301,39591.603.42$4,771
Dec 201202,49886.773.42$8,544
Nov 201201,89686.953.62$6,873
Oct 201203,54389.383.40$12,045
Sep 201202,59494.672.92$7,570
Aug 201202,86992.662.91$8,344
Jul 201203,43985.133.02$10,389
Jun 201203,70179.822.52$9,323
May 201203,56991.612.49$8,881
Apr 201203,995101.652.00$7,977
Mar 201204,969105.052.22$11,042
Feb 201204,648101.102.57$11,946
Jan 201204,69698.092.73$12,839
Dec 201106,51596.873.24$21,107
Nov 201109,62695.723.31$31,874
Oct 2011011,65384.983.65$42,516
Sep 201116212,88083.623.99$64,884
Aug 2011017,61783.404.15$73,099
Jul 2011018,06294.144.52$81,590
Jun 201101,48892.904.64$6,904
May 20110098.134.40$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2015 — as filed, then multipliedworked
Condensate            77 bbl  × $ 48.15 =     $3,708
Gas                    0 Mcf  × $  2.95 =         $0

────────────────────────────────────────────────────
Month total                                   $3,708

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/264092 is the state's own key, not one this site invented.