Operated by EOG RESOURCES, INC. (P-5 253162) in the ALAZAN, NORTH (FRIO CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 268936District 04Field 01097250CondensateGasSaveExport
Value, all time
$6.5 M
Apr 2011 – Oct 2017
Value, last 12 filed months
$295 k
at the published price for each month
Months reported
63
16 months not filed
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 47 leases and 76 wells, and the rule below applies to all of them.

Discovered
1997-06-27
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1997-06-27.

The Commission's schedule remark for this field reads: FIELD ARE ASSIGNED CAPACITY EXEMPT ALLOWABLES.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition44,154 bbl$2,533,867
GasProduction1,112,916 Mcf$3,916,680
Total$6,450,547

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.4763, -97.5706. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.47630, -97.57056 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
8,210 ft
1 wells filed one
Completion to plug
12.0 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,210 ft.

Completions filed
Nov 2012
1 of 1 wells
Plug dates filed
Nov 2024
1 of 1 wells

Last completion to plug: a median of 12.0 years across the 1 well that filed both dates, with the middle half between 12.0 years and 12.0 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-273325374948,210 ftNov 2012Nov 2024Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (63)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

63 months

Oct 20172,64548849.292.98$131,828
Sep 201775625947.523.09$36,725
Aug 201721045.373.00$953
Jul 20176741743.873.09$4,227
Jun 201738790242.493.09$19,228
May 20174438,52145.373.26$47,906
Apr 20171031,12447.933.21$8,547
Mar 20171431,28946.772.98$10,534
Feb 20171111,09950.452.95$8,845
Jan 20171361,27949.413.42$11,092
Dec 20168581748.763.72$7,186
Nov 20161151,06342.492.64$7,697
Oct 201624595046.193.09$14,252
Sep 20164098,29141.553.10$42,701
Aug 20163769,70941.442.92$43,974
Jul 20161985,67041.622.92$24,822
Jun 20163449,62245.352.69$41,443
May 20162617,86042.521.99$26,747
Apr 20162928,84036.561.99$28,276
Mar 20162797,72633.011.79$23,070
Feb 20163609,02426.472.06$28,151
Jan 201639810,05027.352.36$34,647
Dec 20154669,34232.362.00$33,777
Nov 201541911,46138.792.17$41,093
Oct 20152656,62843.552.43$27,624
Sep 201538910,19142.992.76$44,834
Aug 201582515,61340.162.87$77,980
Jul 20152,11023,68748.152.95$171,357
Jun 20153,33127,52056.152.88$266,372
May 20152,69227,29255.212.96$229,285
Apr 20153,22330,54749.822.71$243,247
Mar 20153,40634,13242.892.93$246,251
Feb 20153,16126,92444.662.98$221,301
Jan 20153,14631,13843.433.10$233,178
Dec 20142,38519,05654.693.59$198,873
Nov 20147294,45670.464.25$70,312
Oct 20143171,37678.303.90$30,189
Sep 20143941,62586.164.05$40,521
Aug 20145121,65589.394.04$52,446
Jul 20145933,23296.564.18$70,769
Jun 20143341,81598.164.74$41,383
May 20145272,76494.734.73$62,987
Apr 20141,1403,99495.944.81$128,579
Mar 20141,2657,92495.895.06$161,371
Feb 20141,6227,83597.406.19$206,497
Jan 20142,1527,98990.404.86$233,373
Dec 201319926191.824.35$19,409
Nov 2013037,42288.853.74$139,894
Oct 2013051,77597.423.78$195,676
Sep 2013061,833104.113.72$229,879
Aug 2013085,883104.253.52$302,532
Jul 2013056,878102.523.72$211,458
Jun 2013078,38794.403.93$308,328
May 2013069,28294.834.15$287,457
Apr 2013082,11493.964.28$351,661
Mar 2013060,85493.623.91$238,114
Feb 20130091.233.42$0
Jan 2013051,08791.603.42$174,713
Dec 201228547,04686.773.42$185,634
Nov 20129316,89886.953.62$69,341
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0

Not filed, and not zero: Jul 2011 – Oct 2012 (16 months). The Railroad Commission holds no report for those months, so this page shows none — a zero would state that the lease produced nothing.

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2017 — as filed, then multipliedworked
Condensate         2,645 bbl  × $ 49.29 =   $130,372
Gas                  488 Mcf  × $  2.98 =     $1,456

────────────────────────────────────────────────────
Month total                                 $131,828

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/268936 is the state's own key, not one this site invented.