MCALLEN FIELDWIDE UNIT

Operated by TOTAL E&P USA, INC. (P-5 862787) in the MCALLEN (KEIRN 6100) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 33662District 04Field 58721620CondensateGasSaveExport
Value, all time
$421 k
Jan 1993 – Jul 2004
Value, last 12 filed months
$0
at the published price for each month
Months reported
139
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6 leases and 6 wells, and the rule below applies to all of them.

Discovered
1960-10-29
as the register files it
Field class
Gas
the register's own label
Between wells
933 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2004-11-23.

The Commission's schedule remark for this field reads: PER DOCKET #04-0240399 FIELD RULES AMENDED.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,253 bbl$57,370
GasProduction380,380 Mcf$363,295
Total$420,665

244,379 Mcf of this lease's gas, across 47 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 26.1951, -98.2154. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

26.19510, -98.21544 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,450 ft
1 wells filed one
Completion to plug
39.9 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,450 ft.

Completions filed
Jul 1964
1 of 1 wells
Plug dates filed
Jun 2004
1 of 1 wells

Last completion to plug: a median of 39.9 years across the 1 well that filed both dates, with the middle half between 39.9 years and 39.9 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2150178434 F6,450 ftJul 1964Jun 2004Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (139)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

139 months

Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 2001023518.072.41$565
Oct 2001017319.782.53$438
Sep 200101,50224.262.25$3,381
Aug 200103,42924.873.05$10,469
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 20010024.685.34$0
Mar 20011024.545.38$25
Feb 20011327727.755.77$1,958
Jan 2001361,83527.478.40$16,401
Dec 2000342,03926.889.12$19,515
Nov 2000393,47732.215.66$20,929
Oct 20000031.235.15$0
Sep 200001031.875.19$52
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 200023029.304.40$191
May 20001073227.263.68$2,966
Apr 200037224.513.12$298
Mar 2000141,00428.422.86$3,269
Feb 2000191,45327.622.73$4,486
Jan 20001357325.272.48$1,750
Dec 1999291,69124.282.42$4,803
Nov 1999352,99523.192.43$8,101
Oct 1999342,41320.982.80$7,479
Sep 1999391,79721.752.62$5,554
Aug 1999472,76819.262.88$8,865
Jul 1999332,84417.892.37$7,337
Jun 19993095415.942.36$2,732
May 1999321,92715.792.32$4,978
Apr 1999312,17115.102.21$5,262
Mar 1999242,97512.471.84$5,768
Feb 1999242,2979.981.82$4,415
Jan 1999342,93710.381.90$5,933
Dec 1998231,6859.201.77$3,200
Nov 1998323,66210.892.19$8,353
Oct 1998314,22112.421.97$8,697
Sep 1998254,20312.592.08$9,068
Aug 1998424,25111.301.91$8,583
Jul 1998284,75111.742.24$10,958
Jun 1998192,38811.242.24$5,556
May 1998273,95012.622.21$9,056
Apr 1998243,54713.042.51$9,199
Mar 199834,76112.802.31$11,034
Feb 199803,98613.952.30$9,164
Jan 199814,65814.702.15$10,052
Dec 1997194,44016.322.41$11,015
Nov 1997544,71018.193.09$15,528
Oct 1997524,53519.253.15$15,285
Sep 1997494,30117.742.95$13,578
Aug 1997473,66317.862.55$10,197
Jul 1997484,13417.582.25$10,133
Jun 1997503,32117.242.26$8,358
May 1997624,03118.972.31$10,482
Apr 1997734,00117.882.08$9,638
Mar 1997544,66518.951.94$10,069
Feb 19974020.492.21$82
Jan 1997513,52723.483.54$13,682
Dec 1996424,94323.32$979
Nov 1996563,62421.97$1,230
Oct 1996534,29623.31$1,235
Sep 1996454,12322.22$1,000
Aug 1996404,75320.26$810
Jul 1996355,02119.55$684
Jun 1996384,56118.73$712
May 1996384,92919.43$738
Apr 1996474,86721.51$1,011
Mar 1996475,46819.38$911
Feb 1996395,10516.98$662
Jan 1996364,88017.07$615
Dec 1995385,20117.19$653
Nov 1995484,75616.00$768
Oct 1995485,64215.43$741
Sep 1995415,38016.18$663
Aug 1995405,38615.92$637
Jul 1995465,96415.24$701
Jun 1995324,88916.41$525
May 1995355,76317.56$615
Apr 1995406,13317.73$709
Mar 1995131,92816.44$214
Feb 19951396316.58$216
Jan 1995376,70215.92$589
Dec 1994214,73415.03$316
Nov 1994107,02315.90$159
Oct 19941015.58$16
Sep 1994667415.29$92
Aug 1994284,30716.13$452
Jul 1994376,28117.56$650
Jun 1994274,35917.09$461
May 1994385,54615.88$603
Apr 1994273,70014.14$382
Mar 1994516,20212.46$635
Feb 1994475,91512.50$588
Jan 1994466,62412.66$582
Dec 1993416,41212.33$506
Nov 1993466,77114.49$667
Oct 1993677,27515.85$1,062
Sep 1993606,92515.03$902
Aug 1993347,56215.66$532
Jul 1993508,01015.46$773
Jun 1993546,34816.79$907
May 1993647,44317.68$1,132
Apr 1993111,35118.05$199
Mar 1993191,52718.14$345
Feb 1993536,14717.90$949
Jan 1993747,96616.93$1,253

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2001 — as filed, then multipliedworked
Condensate             0 bbl  × $ 18.07 =         $0
Gas                  235 Mcf  × $  2.41 =       $565

────────────────────────────────────────────────────
Month total                                     $565

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/33662 is the state's own key, not one this site invented.